← Back to Patent Explorer
US4654802A Expired / Lapsed US ⏱️ 0.0 years remaining

Cement metering system

Assignee: Halliburton Co
•
Filing: 1984-06-07
•
Granted: 1987-03-31
•
Expires: 2004-06-07
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract For use in preparing cement to cement a well, a cement metering system is set forth. The preferred and illustrated embodiment incorporates flow meters measuring water delivered to a cement jet mixer for cement and water into a slurry. A downstream density meter is included. A second water line dilutes the slurry to adjust the density downwardly to the desired slurry density controlled by the control system. The control system includes a data formatting circuit connected to the various transducers which converts the data so that the density required for the slurry is obtained. As desired, the data can be totalled by integrating over a period of time and shown on the data display. Volume flow rate of the controlled density slurry and bulk volume of dry cement may be determined.

Inventors

  • 👤 James L. Davis

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-24 14:50
CPC Classifications
G; G05; G05D; G05D11/00; G05D11/02; G05D11/13; G05D11/135; G05D11/137; B; B01; B01F; B01F35/00; B01F35/20; B01F35/21; B01F35/2134; B01F35/214; B01F35/2144; B01F35/80; B01F35/82; B01F23/00; B01F23/50; B01F23/56; Y; Y10; Y10T; Y10T137/00; Y10T137/0318; Y10T137/0324; Y10T137/0329; Y10T137/2496; Y10T137/2499; Y10T137/2504

Claims Analysis

Total Claims: 7
Claim 1
Independent Claim 139 words
A method of controlling the finished density as a wet slurry delivered to a well for cementing the well, the method comprising the steps of: (a) mixing a first fixed and insufficient flow of water and dry cement to form wet slurry having a density in excess of the desired density for cementing a well wherein the wet slurry flows continuously for delivery to the well; (b) adding a variable supplemental flow of water to the wet slurry having the excessive density to reduce the density of the wet slurry; (c) measuring the density of the flowing wet slurry after adding the variable supplemental flow of water; and (d) controlling the variable supplemental flow of water added to the flowing wet slurry having excessive density to obtain a flowing wet slurry having the desired density for cementing a well.
Claim 2
Independent Claim 139 words
A method of controlling the finished density as a wet slurry delivered to a well for cementing the well, the method comprising the steps of: (a) mixing a first fixed and insufficient flow of water and dry cement to form wet slurry having a density in excess of the desired density for cementing a well wherein the wet slurry flows continuously for delivery to the well; (b) adding a variable supplemental flow of water to the wet slurry having the excessive density to reduce the density of the wet slurry; (c) measuring the density of the flowing wet slurry after adding the variable supplemental flow of water; and (d) controlling the variable supplemental flow of water added to the flowing wet slurry having excessive density to obtain a flowing wet slurry having the desired density for cementing a well.
Claim 3
Dependent Claim 38 words
The method of claim 1 including the step of measuring the variable supplemental flow of water, and determining the required supplemental water flow rate required to achieve the desired density of the wet slurry for cementing a well.
Claim 4
Dependent Claim 59 words
The method of claim 1 including a preliminary mixing step which mixes the dry cement and the first fixed and insufficient flow of water to form the flowing wet slurry having the excessive density; and thereafter mixing the required supplemental water with the flowing wet slurry to achieve the desired density of the wet slurry for cementing the well.
Claim 5
Dependent Claim 23 words
The method of claim 3 wherein the step of measuring the density occurs after mixing the required supplemental water with the wet slurry.
Claim 6
Independent Claim 155 words
A method of controlling the finished density of a flowing wet slurry delivered to a well for cementing the well, the method comprising the steps of: (a) in a continuous flow mixing apparatus receiving dry cement, the step of mixing a first and insufficient flow of water with the dry cement to form a flow of slurry having a deficiency of water; (b) continuously delivering the flow of slurry having a deficiency of water past a measuring device, the measuring device determining the deficiency of water in the flowing wet slurry and forming a signal indicative thereof; (c) adding a variable supplemental flow of water to the flowing wet slurry wherein the amount of water is determined by the signal indicative of the deficiency of water; and (d) after adding the supplemental flow of water, then delivering the flowing wet slurry with a sufficient measure of water therein to a well for cementing the well.
Claim 7
Independent Claim 155 words
A method of controlling the finished density of a flowing wet slurry delivered to a well for cementing the well, the method comprising the steps of: (a) in a continuous flow mixing apparatus receiving dry cement, the step of mixing a first and insufficient flow of water with the dry cement to form a flow of slurry having a deficiency of water; (b) continuously delivering the flow of slurry having a deficiency of water past a measuring device, the measuring device determining the deficiency of water in the flowing wet slurry and forming a signal indicative thereof; (c) adding a variable supplemental flow of water to the flowing wet slurry wherein the amount of water is determined by the signal indicative of the deficiency of water; and (d) after adding the supplemental flow of water, then delivering the flowing wet slurry with a sufficient measure of water therein to a well for cementing the well.

References Cited (Backward Citations)

US3300193A Cited
DE1921681A1 Cited
FR2160221A5 Cited
US3940600A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1990-03-30 1990-09-29 1991-03-31 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1994-03-30 1994-09-29 1995-03-31 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1998-03-30 1998-09-29 1999-03-31 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag