← Back to Patent Explorer
US4653597A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for circulating and maintaining drilling mud in a wellbore

Assignee: Atlantic Richfield Co
•
Filing: 1985-12-05
•
Granted: 1987-03-31
•
Expires: 2005-12-05
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method for circulating and maintaining a drilling mud in a wellbore drilled into a subterranean formation at a desired pressure during drilling operations, said method consisting essentially of; (a) circulating drilling mud through a drill pipe in the wellbore into the wellbore, maintaining a desired pressure in said wellbore and recovering drilling mud from the wellbore at a controlled rate using a mud pump and mud pit arrangement; and, (b) maintaining a second supply of drilling mud in fluid communication with the drill pipe at a suitable pressure so that when the mud pump fails to maintain pressure in the drill pipe, drilling mud is supplied from the second supply of drilling mud to maintain pressure in the wellbore.

Inventors

  • 👤 Albert S. Johnson

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-25 03:55
CPC Classifications
E; E21; E21B; E21B21/00; E21B21/08

Claims Analysis

Total Claims: 13
Claim 1
Independent Claim 201 words
A method for circulating and maintaining a drilling mud in a wellbore at a desired pressure during drilling operations, said wellbore being drilled into a subterranean formation from a subterranean access cavity, said method consisting essentially of; (a) circulating said drilling mud from a first supply of drilling mud located in said access cavity through a drill pipe in said wellbore into said wellbore, maintaining a desired pressure in said wellbore and recovering said drilling mud from said wellbore at a controlled rate using a mud pump and mud pit arrangement located in said access cavity; and, (b) maintaining a second supply of drilling mud, said second supply of drilling mud being located at the surface, in fluid communication with said drill pipe at a suitable pressure so that when said mud pump fails to maintain pressure in said drill pipe, drilling mud is supplied from said second supply of drilling mud to maintain pressure in said drill pipe wherein said pressure in said drilling mud from said second supply is maintained by the hydrostatic pressure resulting from the density of said drilling mud and the height of the column of drilling mud extending from said subterranean formation to the surface.
Claim 2
Independent Claim 201 words
A method for circulating and maintaining a drilling mud in a wellbore at a desired pressure during drilling operations, said wellbore being drilled into a subterranean formation from a subterranean access cavity, said method consisting essentially of; (a) circulating said drilling mud from a first supply of drilling mud located in said access cavity through a drill pipe in said wellbore into said wellbore, maintaining a desired pressure in said wellbore and recovering said drilling mud from said wellbore at a controlled rate using a mud pump and mud pit arrangement located in said access cavity; and, (b) maintaining a second supply of drilling mud, said second supply of drilling mud being located at the surface, in fluid communication with said drill pipe at a suitable pressure so that when said mud pump fails to maintain pressure in said drill pipe, drilling mud is supplied from said second supply of drilling mud to maintain pressure in said drill pipe wherein said pressure in said drilling mud from said second supply is maintained by the hydrostatic pressure resulting from the density of said drilling mud and the height of the column of drilling mud extending from said subterranean formation to the surface.
Claim 3
Dependent Claim 24 words
The method of claim 1 wherein drilling mud is supplied to said mud pump and pit arrangement from said second supply of drilling mud.
Claim 4
Dependent Claim 25 words
The method of claim 1 wherein make-up drilling mud is supplied to said mud pump and pit arrangement from said second supply of drilling mud.
Claim 5
Dependent Claim 24 words
The method of claim 1 wherein said second supply of drilling mud is in fluid communication with said drill pipe via a check valve.
Claim 6
Dependent Claim 58 words
The method of claim 1 wherein sections are added to said drill pipe as required by reducing the pressure in said drill pipe while maintaining the pressure in said wellbore by maintaining said second supply of drilling mud in fluid communication with said wellbore and restricting the flow of drilling mud from said wellbore into said drill pipe.
Claim 7
Dependent Claim 30 words
The method of claim 5 wherein a check valve in said drill pipe is used to restrict the flow of said drilling mud from said wellbore into said drill pipe.
Claim 8
Dependent Claim 27 words
The method of claim 1 wherein said subterranean access cavity is positioned beneath said subterranean formation and wherein said wellbore is drilled upwardly into said subterranean formation.
Claim 9
Dependent Claim 27 words
The method of claim 1 wherein said subterranean access cavity is positioned above said subterranean formation and wherein said wellbore is drilled downwardly into said subterranean formation.
Claim 10
Independent Claim 188 words
A method for circulating and maintaining a drilling mud in a wellbore at a desired pressure during drilling operations, said wellbore being drilled into a subterranean formation from an access cavity positioned beneath said subterranean formation, said method consisting essentially of; (a) circulating said drilling mud through a drill pipe in said wellbore into said wellbore, maintaining a desired pressure in said wellbore and recovering said drilling mud from said wellbore at a controlled rate using a mud pump and mud pit arrangement; and, (b) maintaining a second supply of drilling mud in fluid communication with said drill pipe at a suitable pressure so that when said mud pump fails to maintain pressure in said drill pipe, drilling mud is supplied from said second supply of drilling mud to maintain pressure in said drill pipe; wherein sections are added to said drill pipe as required by reducing the pressure in said drill pipe while maintaining the pressure in said wellbore by maintaining said second supply of drilling mud in fluid communication with said wellbore and restricting the flow of drilling mud from said wellbore into said drill pipe.
Claim 11
Independent Claim 188 words
A method for circulating and maintaining a drilling mud in a wellbore at a desired pressure during drilling operations, said wellbore being drilled into a subterranean formation from an access cavity positioned beneath said subterranean formation, said method consisting essentially of; (a) circulating said drilling mud through a drill pipe in said wellbore into said wellbore, maintaining a desired pressure in said wellbore and recovering said drilling mud from said wellbore at a controlled rate using a mud pump and mud pit arrangement; and, (b) maintaining a second supply of drilling mud in fluid communication with said drill pipe at a suitable pressure so that when said mud pump fails to maintain pressure in said drill pipe, drilling mud is supplied from said second supply of drilling mud to maintain pressure in said drill pipe; wherein sections are added to said drill pipe as required by reducing the pressure in said drill pipe while maintaining the pressure in said wellbore by maintaining said second supply of drilling mud in fluid communication with said wellbore and restricting the flow of drilling mud from said wellbore into said drill pipe.
Claim 12
Independent Claim 214 words
A method for circulating and maintaining a drilling mud in a wellbore at a desired pressure during drilling operations, said wellbore being drilled into a subterranean formation from an access cavity positioned beneath said subterranean formation, said method consisting essentially of; (a) circulating said drilling mud through a drill pipe in said wellbore into said wellbore, maintaining a desired pressure in said wellbore and recovering said drilling mud from said wellbore at a controlled rate using a mud pump and mud pit arrangement; and, (b) maintaining a second supply of drilling mud in fluid communication with said drill pipe at a suitable pressure so that when said mud pump fails to maintain pressure in said drill pipe, drilling mud is supplied from said second supply of drilling mud to maintain pressure in said drill pipe; wherein sections are added to said drill pipe as required by reducing the pressure in said drill pipe while maintaining the pressure in said wellbore by maintaining said second supply of drilling mud in fluid communication with said wellbore and restricting the flow of drilling mud from said wellbore into said drill pipe and wherein a check valve in said drill pipe is used to restrict the flow of said drilling mud from said wellbore into said drill pipe.
Claim 13
Independent Claim 214 words
A method for circulating and maintaining a drilling mud in a wellbore at a desired pressure during drilling operations, said wellbore being drilled into a subterranean formation from an access cavity positioned beneath said subterranean formation, said method consisting essentially of; (a) circulating said drilling mud through a drill pipe in said wellbore into said wellbore, maintaining a desired pressure in said wellbore and recovering said drilling mud from said wellbore at a controlled rate using a mud pump and mud pit arrangement; and, (b) maintaining a second supply of drilling mud in fluid communication with said drill pipe at a suitable pressure so that when said mud pump fails to maintain pressure in said drill pipe, drilling mud is supplied from said second supply of drilling mud to maintain pressure in said drill pipe; wherein sections are added to said drill pipe as required by reducing the pressure in said drill pipe while maintaining the pressure in said wellbore by maintaining said second supply of drilling mud in fluid communication with said wellbore and restricting the flow of drilling mud from said wellbore into said drill pipe and wherein a check valve in said drill pipe is used to restrict the flow of said drilling mud from said wellbore into said drill pipe.

References Cited (Backward Citations)

US4165903A Cited
US4458945A Cited
US4535851A Cited
US4534427A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1990-03-30 1990-09-29 1991-03-31 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1994-03-30 1994-09-29 1995-03-31 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1998-03-30 1998-09-29 1999-03-31 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag