Claims Analysis
Total Claims: 8
Claim 1
Independent Claim
385 words
A production installation for implementing the process for bringing hydrocarbon deposits into production comprising: at least one sealed casing extending from the surface down to below a hydrocarbon-bearing deposit, said casing being open on the front of said deposit in order to allow the flow of effluent from said deposit into said casing; at least one sealing plug located inside said sealed casing and above the top of said deposit, said sealing plug being provided with a hole therethrough into which a check valve is installed, said hole and check valve allowing deposit effluent to flow through the sealing plug, and said sealing plug forming a capacity with the upper part of said casing; at least one duct opening into the upper part of said capacity, said duct allowing either removal therefrom or injection thereinto of a pressurized gas; a condensate injection tube passing through the capacity and through the sealing plug and opening below the sealing plug on the front of the deposit; a production pipe passing through said capacity, said pipe communicating in its upper part with an effluent discharge pipe and in its lower part with said capacity through a second check valve, said production pipe check valve and said sealing plug check valve forming a valving system providing an operating cycle comprising: (a) during an initial phase, the valving system lets the deposit effluent pass through the inside of the capacity which then fills up, (b) during a second phase during which a pressurized gas is injected into the capacity through said duct, said valving system prevents the deposit effluent contained in said capacity from returning to the deposit, whereas said valving system allows the deposit effluent to pass through the production pipe to the effluent discharge pipe, the second phase further comprising simultaneous injection of condensates into the deposit, and (c) during a third phase the valving system retains the deposit effluent in the production pipe and allows the effluent mixed with the condensates injected into the deposit to pass to the capacity, so that a new cycle may begin; and means for transferring the pressurized gas accumulated in the capacity at the end of liquid flushing into another well equipped with a similar installation and ready to be flushed until a pressure balance is obtained between the two wells.
Claim 2
Dependent Claim
385 words
A production installation for implementing the process for bringing hydrocarbon deposits into production comprising: at least one sealed casing extending from the surface down to below a hydrocarbon-bearing deposit, said casing being open on the front of said deposit in order to allow the flow of effluent from said deposit into said casing; at least one sealing plug located inside said sealed casing and above the top of said deposit, said sealing plug being provided with a hole therethrough into which a check valve is installed, said hole and check valve allowing deposit effluent to flow through the sealing plug, and said sealing plug forming a capacity with the upper part of said casing; at least one duct opening into the upper part of said capacity, said duct allowing either removal therefrom or injection thereinto of a pressurized gas; a condensate injection tube passing through the capacity and through the sealing plug and opening below the sealing plug on the front of the deposit; a production pipe passing through said capacity, said pipe communicating in its upper part with an effluent discharge pipe and in its lower part with said capacity through a second check valve, said production pipe check valve and said sealing plug check valve forming a valving system providing an operating cycle comprising: (a) during an initial phase, the valving system lets the deposit effluent pass through the inside of the capacity which then fills up, (b) during a second phase during which a pressurized gas is injected into the capacity through said duct, said valving system prevents the deposit effluent contained in said capacity from returning to the deposit, whereas said valving system allows the deposit effluent to pass through the production pipe to the effluent discharge pipe, the second phase further comprising simultaneous injection of condensates into the deposit, and (c) during a third phase the valving system retains the deposit effluent in the production pipe and allows the effluent mixed with the condensates injected into the deposit to pass to the capacity, so that a new cycle may begin; and means for transferring the pressurized gas accumulated in the capacity at the end of liquid flushing into another well equipped with a similar installation and ready to be flushed until a pressure balance is obtained between the two wells.
Claim 3
Dependent Claim
39 words
The installation as claimed in claim 1, wherein said valving system comprises, in the lower part of the production pipe, at least one foot check valve situated downstream of an orifice communicating between the production pipe and said capacity.
Claim 4
Dependent Claim
44 words
The installation as claimed in claim 1, wherein said valving system comprises, in the lower part of the production pipe, two foot check valves disposed in series and said orifice communicating between said production pipe and said capacity is situated between said two valves.
Claim 5
Dependent Claim
529 words
A production installation for implementing the process for bringing hydrocarbon deposits into production comprising: at least one sealed casing extending from the surface down to below a hydrocarbon-bearing deposit, said casing being open on the front of said deposit in order to allow the flow of effluent from said deposit into said casing; at least one sealing plug located inside said sealed casing and above the top of said deposit, said sealing plug being provided with a hole therethrough into which a first check valve is installed, said hole and check valve allowing deposit effluent to flow through the sealing plug, and said sealing plug forming a capacity with the upper part of said casing; at least one duct opening into the upper part of said capacity, said duct allowing either removal therefrom or injection thereinto of a pressurized gas; a condensate injection tube passing through the capacity and through the sealing plug and opening below the sealing plug on the front of the deposit; a production pipe passing through said capacity, said pipe communicating in its upper part with an effluent discharge pipe and in its lower part with said capacity through a second check valve, said production pipe check valve and said sealing plug check valve forming a valving system providing an operating cycle comprising: (a) during an initial phase, the valving system lets the deposit effluent pass through the inside of the capacity which then fills up, (b) during a second phase during which a pressurized gas is injected into the capacity through said duct, said valving system prevents the deposit effluent contained in said capacity from returning to the deposit, whereas said valving system allows the deposit effluent to pass through the production pipe to the effluent discharge pipe (gas flushing), the second phase further comprising simultaneous injection of condensates into the deposit, and (c) during a third phase the valving system retains the deposit effluent in the production pipe and allows the effluent mixed with the condensates injected into the deposit to pass to the capacity, so that a new cycle may begin; wherein, for the purpose of using said production pipe either for removal therefrom or injection thereinto of a pressurized gas and said duct opening into the upper part of said capacity for the passage of said effluent, said casing is used instead of said production pipe, said production pipe is used instead of said casing and said casing is closed by a second sealing plug through which passes the condensate injection pipe, said second plug located above said first plug, wherein these two plugs define an intermediate chamber into which the production pipe used as said casing opens, wherein a second capacity, which is then defined above the upper plug, communicates with the intermediate chamber through a duct equipped with a third check valve which provides a flow direction the same as the second check valve located at the bottom of the production pipe, wherein the lower plug comprises a passage to the deposit equipped with the first check valve and wherein the casing may further comprise, in its upper part, a discharge duct for discharging the effluent and the condensate.
Claim 6
Dependent Claim
529 words
A production installation for implementing the process for bringing hydrocarbon deposits into production comprising: at least one sealed casing extending from the surface down to below a hydrocarbon-bearing deposit, said casing being open on the front of said deposit in order to allow the flow of effluent from said deposit into said casing; at least one sealing plug located inside said sealed casing and above the top of said deposit, said sealing plug being provided with a hole therethrough into which a first check valve is installed, said hole and check valve allowing deposit effluent to flow through the sealing plug, and said sealing plug forming a capacity with the upper part of said casing; at least one duct opening into the upper part of said capacity, said duct allowing either removal therefrom or injection thereinto of a pressurized gas; a condensate injection tube passing through the capacity and through the sealing plug and opening below the sealing plug on the front of the deposit; a production pipe passing through said capacity, said pipe communicating in its upper part with an effluent discharge pipe and in its lower part with said capacity through a second check valve, said production pipe check valve and said sealing plug check valve forming a valving system providing an operating cycle comprising: (a) during an initial phase, the valving system lets the deposit effluent pass through the inside of the capacity which then fills up, (b) during a second phase during which a pressurized gas is injected into the capacity through said duct, said valving system prevents the deposit effluent contained in said capacity from returning to the deposit, whereas said valving system allows the deposit effluent to pass through the production pipe to the effluent discharge pipe (gas flushing), the second phase further comprising simultaneous injection of condensates into the deposit, and (c) during a third phase the valving system retains the deposit effluent in the production pipe and allows the effluent mixed with the condensates injected into the deposit to pass to the capacity, so that a new cycle may begin; wherein, for the purpose of using said production pipe either for removal therefrom or injection thereinto of a pressurized gas and said duct opening into the upper part of said capacity for the passage of said effluent, said casing is used instead of said production pipe, said production pipe is used instead of said casing and said casing is closed by a second sealing plug through which passes the condensate injection pipe, said second plug located above said first plug, wherein these two plugs define an intermediate chamber into which the production pipe used as said casing opens, wherein a second capacity, which is then defined above the upper plug, communicates with the intermediate chamber through a duct equipped with a third check valve which provides a flow direction the same as the second check valve located at the bottom of the production pipe, wherein the lower plug comprises a passage to the deposit equipped with the first check valve and wherein the casing may further comprise, in its upper part, a discharge duct for discharging the effluent and the condensate.
Claim 7
Dependent Claim
469 words
A production installation for implementing the process for bringing hydrocarbon deposits into production comprising: at least one sealed casing extending from the surface down to below a hydrocarbon-bearing deposit, said casing being open on the front of said deposit in order to allow the flow of effluent from said deposit into said casing; at least one sealing plug located inside said sealed casing and above the top of said deposit, said sealing plug being provided with a hole therethrough into which a check valve is installed, said hole and check valve allowing deposit effluent to flow through the sealing plug, and said sealing plug forming a capacity with the upper part of said casing; at least one duct opening into the upper part of said capacity, said duct allowing either removal therefrom or inection thereinto of a pressurized gas; a condensate injection tube passing through the capacity and through the sealing plug and opening below the sealing plug on the front of the deposit; a production pipe passing through said capacity, said pipe communicating in its upper part with an effluent discharge pipe and in its lower part with said capacity through a second check valve, said production pipe check valve and said sealing plug check valve forming a valving system providing an operating cycle comprising: (a) during an initial phase, the valving system lets the deposit effluent pass through the inside of the capacity which then fills up, (b) during a second phase during which a pressurized gas is injected into the capacity through said duct, said valving system prevents the deposit effluent contained in said capacity from returning to the deposit, whereas said valving system allows the deposit effluent to pass through the production pipe to the effluent discharge pipe (gas flushing), the second phase further comprising simultaneous injection of condensates into the deposit, and (c) during a third phase the valving system retains the deposit effluent in the production pipe and allows the effluent mixed with the condensates injected into the deposit to pass to the capacity, so that a new cycle may begin; and an additional sealing plug mounted in the upper part of the casing so as to separate said capacity into two chambers, namely an upper chamber for storing a gas or the condensates and a lower chamber fulfilling the functions of said capacity, said additional plug having passing therethrough at least the production pipe, the condensate injection pipe and a pipe passing through the upper chamber and serving as inlet and outlet for the flushing gas for the lower chamber said installation comprising in addition a plunging pipe for supplying the upper chamber with gas or removing gas therefrom as well as for draining, if required, the existing liquids or the liquids which may accumulate in the lower part of said chamber.
Claim 8
Dependent Claim
469 words
A production installation for implementing the process for bringing hydrocarbon deposits into production comprising: at least one sealed casing extending from the surface down to below a hydrocarbon-bearing deposit, said casing being open on the front of said deposit in order to allow the flow of effluent from said deposit into said casing; at least one sealing plug located inside said sealed casing and above the top of said deposit, said sealing plug being provided with a hole therethrough into which a check valve is installed, said hole and check valve allowing deposit effluent to flow through the sealing plug, and said sealing plug forming a capacity with the upper part of said casing; at least one duct opening into the upper part of said capacity, said duct allowing either removal therefrom or inection thereinto of a pressurized gas; a condensate injection tube passing through the capacity and through the sealing plug and opening below the sealing plug on the front of the deposit; a production pipe passing through said capacity, said pipe communicating in its upper part with an effluent discharge pipe and in its lower part with said capacity through a second check valve, said production pipe check valve and said sealing plug check valve forming a valving system providing an operating cycle comprising: (a) during an initial phase, the valving system lets the deposit effluent pass through the inside of the capacity which then fills up, (b) during a second phase during which a pressurized gas is injected into the capacity through said duct, said valving system prevents the deposit effluent contained in said capacity from returning to the deposit, whereas said valving system allows the deposit effluent to pass through the production pipe to the effluent discharge pipe (gas flushing), the second phase further comprising simultaneous injection of condensates into the deposit, and (c) during a third phase the valving system retains the deposit effluent in the production pipe and allows the effluent mixed with the condensates injected into the deposit to pass to the capacity, so that a new cycle may begin; and an additional sealing plug mounted in the upper part of the casing so as to separate said capacity into two chambers, namely an upper chamber for storing a gas or the condensates and a lower chamber fulfilling the functions of said capacity, said additional plug having passing therethrough at least the production pipe, the condensate injection pipe and a pipe passing through the upper chamber and serving as inlet and outlet for the flushing gas for the lower chamber said installation comprising in addition a plunging pipe for supplying the upper chamber with gas or removing gas therefrom as well as for draining, if required, the existing liquids or the liquids which may accumulate in the lower part of said chamber.