US4648241A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Active clearance control
Assignee: RTX Corp
•
Filing: 1983-11-03
•
Granted: 1987-03-10
•
Expires: 2003-11-03
Abstract
Abstract Active clearance control is effectuated by heating the bore of the high pressure compressor spool so as to expand the compressor disc and labyrinth seals to minimize the gap between the blades and its peripheral seal and labyrinth seal. The high stages of the high spool compressor are selectively bled to achieve the desired gap control over the engine's operating envelope. The bled air is fed into the bore by conducting the air externally of the engine's case and admitting it through hollow stator vanes of the low pressure spool and tubes communicating with a cavity at the bearing supporting the high pressure compressor shaft at a juncture in line with the inlet of the high pressure compressor spool.
Inventors
- 👤 Robert L. Putman
- 👤 Merle L. Dinse
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-07 11:44
CPC Classifications
F; F01; F01D; F01D11/00; F01D11/08; F01D11/14; F01D11/20; F01D11/24
Claims Analysis
Total Claims: 3
Claim 1
Independent Claim
201 words
An active clearance control system for a twin spool gas turbine power plant operating over an engine operating envelope including a cruise mode having a plurality of stages of axial flow compressors defining the high pressure compressor spool and the low pressure compressor spool powering aircraft, each compresor stage having a stator including circumferentially spaced vanes, a disc supporting a plurality of compressor blades and an outer air seal, said compressor stages rotatably supported in an engine case to a shaft supported by bearings, said bearings being in proximity to the entrance of the high pressure spool of said compressor stages, means for selectively bleeding air from separate compressor stages in the high pressure compressor spool, and means including an external conduit and tube means for leading said bled air into the bore of said high pressure spool, through an opening in the engine's casing, a hollow stator vane in the low pressure compressor spool, through said bearing and said high pressure spool shaft and means responsive to engine operating parameters for controlling said selective bleeding means so as to introduce air into said bore from the hottest stage of said bleeding stages during the cruise mode of said power plant.
Claim 2
Dependent Claim
201 words
An active clearance control system for a twin spool gas turbine power plant operating over an engine operating envelope including a cruise mode having a plurality of stages of axial flow compressors defining the high pressure compressor spool and the low pressure compressor spool powering aircraft, each compresor stage having a stator including circumferentially spaced vanes, a disc supporting a plurality of compressor blades and an outer air seal, said compressor stages rotatably supported in an engine case to a shaft supported by bearings, said bearings being in proximity to the entrance of the high pressure spool of said compressor stages, means for selectively bleeding air from separate compressor stages in the high pressure compressor spool, and means including an external conduit and tube means for leading said bled air into the bore of said high pressure spool, through an opening in the engine's casing, a hollow stator vane in the low pressure compressor spool, through said bearing and said high pressure spool shaft and means responsive to engine operating parameters for controlling said selective bleeding means so as to introduce air into said bore from the hottest stage of said bleeding stages during the cruise mode of said power plant.
Claim 3
Dependent Claim
21 words
An active clearance control as in claim 1 wherein said selective bleeding means is a valve disposed in said external conduit.
References Cited (Backward Citations)
US2837270A
Cited
US2848156A
Cited
US3031132A
Cited
US3647313A
Cited
US3742706A
Cited
US3844110A
Cited
US3945759A
Cited
US4127988A
Cited
US4230436A
Cited
US4268221A
Cited
US4329114A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1990-03-09 | 1990-09-08 | 1991-03-10 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1994-03-09 | 1994-09-08 | 1995-03-10 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1998-03-09 | 1998-09-08 | 1999-03-10 | $7700.00 | Window Closed / Lapsed |