← Back to Patent Explorer
US4635724A Expired / Lapsed US ⏱️ 0.0 years remaining

CO2 -enhanced hydrocarbon recovery with corrosion-resistant cement

Assignee: Allen Bradley Co LLC
•
Filing: 1985-07-26
•
Granted: 1987-01-13
•
Expires: 2005-07-26
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract In a hydrocarbon recovery system including CO2 pressurization of an underground formation, a sealing cement comprised of Portland cement and Class C fly ash.

Inventors

  • 👤 Roderick A. Bruckdorfer
  • 👤 Samuel E. Coleman

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-30 23:26
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/16; E21B43/164; C; C04; C04B; C04B18/00; C04B18/04; C04B18/06; C04B18/08; C09; C09K; C09K8/00; C09K8/42; C09K8/46; C04B2111/00; C04B2111/20; C04B2111/22; Y; Y02; Y02W; Y02W30/00; Y02W30/50; Y02W30/91; Y10; Y10S; Y10S166/00; Y10S166/902

Claims Analysis

Total Claims: 8
Claim 1
Independent Claim 101 words
In a system for producing a hydrocarbon fluid from a deposit of said fluid in an underground formation, carbon dioxide and water also being present in said formation, said system including at least one bore hole and a centrally disposed metal tube therein extending from ground level to said underground formation, the improvement consisting of a CO 2 -corrosion resistant cement surrounding said tube and occupying the annular space between said tube and said formation, said cement comprising a hardened cement slurry comprised of Portland cement and Class C fly ash in a weight proportion of from about 1:2 to 2:1.
Claim 2
Dependent Claim 101 words
In a system for producing a hydrocarbon fluid from a deposit of said fluid in an underground formation, carbon dioxide and water also being present in said formation, said system including at least one bore hole and a centrally disposed metal tube therein extending from ground level to said underground formation, the improvement consisting of a CO 2 -corrosion resistant cement surrounding said tube and occupying the annular space between said tube and said formation, said cement comprising a hardened cement slurry comprised of Portland cement and Class C fly ash in a weight proportion of from about 1:2 to 2:1.
Claim 3
Dependent Claim 37 words
An improved system, as recited in claim 1, wherein said slurry has a density of about 16-16.4 pounds per cubic foot and includes about 35% fly ash and about 65% Portland cement on a dry weight basis.
Claim 4
Dependent Claim 18 words
An improved system, as recited in claim 2 wherein said Portland cement is Class H type Portland cement.
Claim 5
Dependent Claim 59 words
Method of providing a CO 2 -corrosion resistant encasement for a tubular member in a bore hole extending into the earth from ground level, said method comprising surrounding said tubular member with a Portland cement slurry, including, on a dry weight basis, about 35-65% Class C fly ash and about 65-35% Portland cement and permitting said slurry to harden
Claim 6
Dependent Claim 59 words
Method of providing a CO 2 -corrosion resistant encasement for a tubular member in a bore hole extending into the earth from ground level, said method comprising surrounding said tubular member with a Portland cement slurry, including, on a dry weight basis, about 35-65% Class C fly ash and about 65-35% Portland cement and permitting said slurry to harden
Claim 7
Dependent Claim 129 words
In a method for collecting a hydrocarbon fluid product through a production well from a deposit of said fluid in an underground formation, said method including pressurizing said formation by injection of carbon dioxide and water through an injection well into said formation and including in at least one of said wells a bore hole and centrally disposed tube member therein extending from ground level to said underground formation, the improvement consisting of surrounding said tube member within said bore hole with a hardenable Portland cement slurry, comprising water, Portland cement and at least about 35% Class C fly ash on a dry weight basis, said slurry being adapted, upon hardening, to seal the space between said tube member and said formation with a CO 2 -corrosion resistant cement.
Claim 8
Dependent Claim 129 words
In a method for collecting a hydrocarbon fluid product through a production well from a deposit of said fluid in an underground formation, said method including pressurizing said formation by injection of carbon dioxide and water through an injection well into said formation and including in at least one of said wells a bore hole and centrally disposed tube member therein extending from ground level to said underground formation, the improvement consisting of surrounding said tube member within said bore hole with a hardenable Portland cement slurry, comprising water, Portland cement and at least about 35% Class C fly ash on a dry weight basis, said slurry being adapted, upon hardening, to seal the space between said tube member and said formation with a CO 2 -corrosion resistant cement.

References Cited (Backward Citations)

US2875831A Cited
US3064957A Cited
US3298438A Cited
US4210457A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1990-01-12 1990-07-14 1991-01-13 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1994-01-12 1994-07-14 1995-01-13 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1998-01-12 1998-07-14 1999-01-13 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag