← Back to Patent Explorer
US4622449A Expired / Lapsed US ⏱️ 0.0 years remaining

Using the weight of the electrode or workpiece to control EDM working conditions

Assignee: Japan Kinoko Research Center Foundation
•
Filing: 1983-04-26
•
Granted: 1986-11-11
•
Expires: 2003-04-26
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract An electrical discharge machine is provided with at least one weight measuring apparatus for detecting the weight of one or both of an electrode and a workpiece, and a control unit for selecting or controlling the working conditions in response to the output of the weight measuring apparatus. The weights of the electrode and the workpiece are measured after the working operation has been interrupted temporarily, or while continuing the working operation. Well-known various accurate balances or force measuring apparatuses may be used as the weight measuring apparatus. A microcomputer including a numerical control unit may be used as the control unit.

Inventors

  • 👤 Kiyoshi Inoue

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-03 00:02
CPC Classifications
B; B23; B23Q; B23Q3/00; B23Q3/155; B23Q3/15513; B23H; B23H7/00; B23H7/14; B23H7/18

Claims Analysis

Total Claims: 22
Claim 1
Independent Claim 180 words
In an electrical discharge machine, in which a working gap is formed between a working electrode and a conductive workpiece, a pulse discharge is generated in said working gap between said electrode and said workpiece while supplying a working fluid to said electrode and said workpiece, and said electrode and said workpiece are relatively moved while maintaining a proper width of said working gap, thereby performing spark erosion, the improvement comprising at least one weight measuring means mounted on the electrical discharge machine for measuring the weight of at least one of said electrode and said workpiece, means establishing working conditions for the spark erosion of said workpiece including means for relatively positioning the electrode and workpiece with respect to three mutually perpendicular axes, means for relatively moving the electrode and the workpiece, means for replacing the electrode, and power supply means for said electrode and said workpiece and control means for controlling said means which establishes said working conditions in response to the measured weight to optimize said working conditions for the continuation of spark erosion of said workpiece.
Claim 2
Dependent Claim 180 words
In an electrical discharge machine, in which a working gap is formed between a working electrode and a conductive workpiece, a pulse discharge is generated in said working gap between said electrode and said workpiece while supplying a working fluid to said electrode and said workpiece, and said electrode and said workpiece are relatively moved while maintaining a proper width of said working gap, thereby performing spark erosion, the improvement comprising at least one weight measuring means mounted on the electrical discharge machine for measuring the weight of at least one of said electrode and said workpiece, means establishing working conditions for the spark erosion of said workpiece including means for relatively positioning the electrode and workpiece with respect to three mutually perpendicular axes, means for relatively moving the electrode and the workpiece, means for replacing the electrode, and power supply means for said electrode and said workpiece and control means for controlling said means which establishes said working conditions in response to the measured weight to optimize said working conditions for the continuation of spark erosion of said workpiece.
Claim 3
Dependent Claim 35 words
An electrical discharge machine as claimed in claim 1, wherein said electrode is disposed at a working location during spark erosion, said weight measuring means measures the weight of the electrode at the working location.
Claim 4
Dependent Claim 33 words
An electrical discharge machine as claimed in claim 1 comprising a work tank containing the electrode and the workpiece, said weight measuring means measuring the weight of said workpiece and work tank together.
Claim 5
Dependent Claim 47 words
An electrical discharge machine as claimed in claim 1 comprising a work tank containing a working fluid, said electrode and said workpiece being immersed in said fluid, said weight measuring means measuring the weight of said workpiece while immersed in the working fluid in said work tank.
Claim 6
Dependent Claim 58 words
An electrical discharge machine as claimed in claim 1 wherein said weight measuring means is operative in the course of the machining of the workpiece by spark erosion and provides output to said control means which controls the means which establishes the working conditions to obtain optimized working conditions during subsequent machining by spark erosion of the workpiece.
Claim 7
Dependent Claim 19 words
An electrical discharge machine as claimed in claim 1 wherein the weight measuring means is operative during spark erosion.
Claim 8
Dependent Claim 134 words
An electrical discharge machine comprising a work tank including means for supporting a conductive workpiece element within the tank, an electrode element supported to project within the tank, in an operative position, in facing relation with said workpiece element to form a gap therewith, means for supplying working fluid, means for establishing working conditions in said tank to produce spark erosion of said workpiece element including means for supplying electrical energy to said workpiece and electrode elements, means for providing relative movement between said electrode and workpiece elements, and weighing means mounted on the electrical discharge machine for weighing at least one of said elements in the course of machining of the workpiece element by spark erosion to control the working conditions in said tank and the continued spark erosion of said workpiece element.
Claim 9
Dependent Claim 134 words
An electrical discharge machine comprising a work tank including means for supporting a conductive workpiece element within the tank, an electrode element supported to project within the tank, in an operative position, in facing relation with said workpiece element to form a gap therewith, means for supplying working fluid, means for establishing working conditions in said tank to produce spark erosion of said workpiece element including means for supplying electrical energy to said workpiece and electrode elements, means for providing relative movement between said electrode and workpiece elements, and weighing means mounted on the electrical discharge machine for weighing at least one of said elements in the course of machining of the workpiece element by spark erosion to control the working conditions in said tank and the continued spark erosion of said workpiece element.
Claim 10
Dependent Claim 26 words
An electrical discharge machine as claimed in claim 7, wherein said weighing means suspends said electrode element for measurement of the weight of the electrode element.
Claim 11
Dependent Claim 36 words
An electrical discharge machine as claimed in claim 7, wherein the weighing means includes a weight measurement device for supporting said tank to measure the weight of said tank and said workpiece element supported therein together.
Claim 12
Dependent Claim 33 words
An electrical discharge machine as claimed in claim 7, wherein the weighing means includes a weight measurement device located within said tank for measuring the weight of the workpiece element in said tank.
Claim 13
Dependent Claim 26 words
An electrical discharge machine as claimed in claim 10, wherein said weight measurement device is supported by said tank and in turn supports said workpiece element.
Claim 14
Dependent Claim 19 words
An electrical discharge machine as claimed in claim 7 wherein the weight measuring means is operative during spark erosion.
Claim 15
Dependent Claim 169 words
In a method of machining a conductive workpiece element by spark erosion with an electrode element across a gap between said workpiece element and electrode element at a working location, and wherein the gap is immersed in a working fluid in a tank and the workpiece and electrode elements undergo relative movement to effect a machining operation on the workpiece element, the machining operation being carried out at said working location under working conditions including relatively positioning the workpiece and electrode elements along three mutually perpendicular axes, supplying electrical power to the electrode element and workpiece element and replacing the electrode element when worn, the improvement comprising measuring the weight of at least one of said workpiece and electrode elements at said working location in the course of machining the workpiece element by spark erosion and controlling the working conditions of the succeeding machining operation after the weight measurement of said at least one of said elements in response to said weight measurement to optimize the overall machining operation.
Claim 16
Dependent Claim 169 words
In a method of machining a conductive workpiece element by spark erosion with an electrode element across a gap between said workpiece element and electrode element at a working location, and wherein the gap is immersed in a working fluid in a tank and the workpiece and electrode elements undergo relative movement to effect a machining operation on the workpiece element, the machining operation being carried out at said working location under working conditions including relatively positioning the workpiece and electrode elements along three mutually perpendicular axes, supplying electrical power to the electrode element and workpiece element and replacing the electrode element when worn, the improvement comprising measuring the weight of at least one of said workpiece and electrode elements at said working location in the course of machining the workpiece element by spark erosion and controlling the working conditions of the succeeding machining operation after the weight measurement of said at least one of said elements in response to said weight measurement to optimize the overall machining operation.
Claim 17
Dependent Claim 28 words
A method as claimed in claim 13, wherein the weight measurement is effected on the electrode element with the latter maintained in operative position at said working location.
Claim 18
Dependent Claim 32 words
A method as claimed in claim 13, wherein the weight measurement is effected with the workpiece element in the tank whereby the weight of the tank and workpiece element is measured together.
Claim 19
Dependent Claim 20 words
A method as claimed in claim 15, wherein the tank is emptied of fluid before the weight measurement is effected.
Claim 20
Dependent Claim 28 words
A method as claimed in claim 15, wherein the weight measurement is effected on the workpiece element while the latter is immersed in the fluid in the tank.
Claim 21
Dependent Claim 34 words
An electrical discharge machine as claimed in claim 13, wherein the measuring of the weight of at least one of said workpiece and electrode elements takes place during the machining of the workpiece element.
Claim 22
Dependent Claim 26 words
An electrical discharge machine as claimed in claim 13 wherein the machining is halted when the weight of at least one of said elements is weighed.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1989-11-10 1990-05-12 1990-11-11 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1993-11-10 1994-05-12 1994-11-11 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1997-11-10 1998-05-12 1998-11-11 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag