Combustion chamber having beds located one above the other and a method of controlling it

Assignee: ABB Stal AB
•
Filing: 1985-11-18
•
Granted: 1986-09-30
•
Expires: 2005-11-18
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A boiler plant with a multi-fluidized-bed combustion chamber comprising a first bed in a lower combustion space and a second bed in an upper combustion space and with nozzles in the support means for the beds for injection of combustion air into the first bed and combustion gases into the second bed for fluidization of the bed material therein. The plant is equipped with bed material transport devices for transferring bed material from the lower combustion chamber to the upper combustion chamber or vice versa. Further, measuring means is provided for measuring the temperature and depth of the lower bed, and signal processing and control means are provided for adapting the depth of the lower bed in dependence on plant load and bed temperature.

Inventors

  • 👤 Jorgen Bergkvist

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-30 13:34
CPC Classifications
B; B01; B01J; B01J8/00; B01J8/18; B01J8/1809; B01J8/24; B01J8/26; B01J8/28; F; F22; F22B; F22B31/00; F22B31/0007; F22B31/0015; F22B31/0023; F23; F23C; F23C10/00; F23C10/005; F23C10/18; F23C10/28; F23C10/30; F23N; F23N1/00; B01J2208/00; B01J2208/00008; B01J2208/00017; B01J2208/00026; B01J2208/00035; B01J2208/00044

Claims Analysis

Total Claims: 12
Claim 1
Independent Claim 255 words
A boiler plant provided with a multibed combustion chamber, which combustion chamber includes a first lower combustion chamber space delimited by a first bottom support means adapted to support a first bed of fluidizable bed material and housing a nest of tubes for extracting heat from the first bed material, a second upper combustion chamber space delimited by a second bottom support means adapted to support a second support bed of fluidizable bed material, an air plenum chamber below the first bottom support means, nozzles in the first bottom support means for transferring combustion air from the air plenum chamber to the first lower combustion chamber space, means to feed fuel to the first combustion chamber space, and nozzles in the second bottom support means for transferring combustion gases from the first lower combustion chamber space to the second upper combustion chamber space, which plant further includes a first bed material transport means for transferring bed material downwardly from the second upper combustion chamber space to the first lower combustion chamber space, a second bed material transport means for transferring bed material upwardly from the first lower combustion chamber space to the second upper combustion chamber space, measuring means for measuring the actual thermal load outputting from the plant, and control means for controlling the depth of bed material in the lower combustion chamber space in dependence on the measured thermal output load by transferring bed material from one combustion chamber to the other via one of said first and second bed material transport means.
Claim 2
Dependent Claim 255 words
A boiler plant provided with a multibed combustion chamber, which combustion chamber includes a first lower combustion chamber space delimited by a first bottom support means adapted to support a first bed of fluidizable bed material and housing a nest of tubes for extracting heat from the first bed material, a second upper combustion chamber space delimited by a second bottom support means adapted to support a second support bed of fluidizable bed material, an air plenum chamber below the first bottom support means, nozzles in the first bottom support means for transferring combustion air from the air plenum chamber to the first lower combustion chamber space, means to feed fuel to the first combustion chamber space, and nozzles in the second bottom support means for transferring combustion gases from the first lower combustion chamber space to the second upper combustion chamber space, which plant further includes a first bed material transport means for transferring bed material downwardly from the second upper combustion chamber space to the first lower combustion chamber space, a second bed material transport means for transferring bed material upwardly from the first lower combustion chamber space to the second upper combustion chamber space, measuring means for measuring the actual thermal load outputting from the plant, and control means for controlling the depth of bed material in the lower combustion chamber space in dependence on the measured thermal output load by transferring bed material from one combustion chamber to the other via one of said first and second bed material transport means.
Claim 3
Dependent Claim 22 words
A boiler plant according to claim 1, in which said first and second bed material transport means are of the same type.
Claim 4
Dependent Claim 29 words
A boiler plant according to claim 1, in which at least one of said first and second bed material transport means comprises a plurality of parallel-working material transport devices.
Claim 5
Dependent Claim 90 words
A boiler plant according to claim 1, which further includes measuring means for determining the depth of each of the first and second beds, a signal processing unit in which the measured values for the bed depths are compared with desired values for the load required to be delivered from the plant at a particular time, and control means for controlling the transportation of bed material in one of said first and second bed material transport means to effect the transfer of bed material from one bed to the other.
Claim 6
Dependent Claim 46 words
A boiler plant according to claim 4, in which the measuring means for the bed depths consists of a differential pressure gauge for each bed, each gauge being connected between a lower part of the respective combustion chamber space and the free-space above the respective bed.
Claim 7
Dependent Claim 46 words
A boiler plant according to claim 4, which includes further measuring means to measure the temperature of the first bed, which further measuring means is connected to the signal processing unit, where the measured value of the bed temperature is compared with a desired value therefor.
Claim 8
Independent Claim 231 words
A method of controlling a boiler plant having a multibed combustion chamber including a first lower combustion chamber space containng a first fluidizable bed of bed material and with a nest of tubes at least partly submerged in the bed material for extracting heat from the first bed, a second upper combustion chamber space with a second upper fluidizable bed of bed material, an air plenum chamber below the first bed, nozzles in a bottom support means of the first bed for transferring combustion air from the air plenum chamber to the first combustion chamber space, nozzles in a bottom support means of the second combustion chamber space for transferring combustion gases from the first combustion chamber space to the second combustion chamber space, and means to feed fuel to be burnt to the first bed, wherein the temperature of the first bed material is maintained, throughout a power output range of the plant, between upper and lower temperature limits, within which suitable combustion of the fuel can occur, by adapting the depth of bed material in the lower combustion chamber space to the required thermal output of the plant by transferring bed material from one bed to the other bed, so that the cooling power of that part of the tube nest which is submerged in the first bed is adapted to the thermal power generated in the first bed.
Claim 9
Independent Claim 231 words
A method of controlling a boiler plant having a multibed combustion chamber including a first lower combustion chamber space containng a first fluidizable bed of bed material and with a nest of tubes at least partly submerged in the bed material for extracting heat from the first bed, a second upper combustion chamber space with a second upper fluidizable bed of bed material, an air plenum chamber below the first bed, nozzles in a bottom support means of the first bed for transferring combustion air from the air plenum chamber to the first combustion chamber space, nozzles in a bottom support means of the second combustion chamber space for transferring combustion gases from the first combustion chamber space to the second combustion chamber space, and means to feed fuel to be burnt to the first bed, wherein the temperature of the first bed material is maintained, throughout a power output range of the plant, between upper and lower temperature limits, within which suitable combustion of the fuel can occur, by adapting the depth of bed material in the lower combustion chamber space to the required thermal output of the plant by transferring bed material from one bed to the other bed, so that the cooling power of that part of the tube nest which is submerged in the first bed is adapted to the thermal power generated in the first bed.
Claim 10
Dependent Claim 32 words
A method according to claim 7, in which the sum of the depths of bed material in the two beds is held substantially constant independent of the thermal output of the plant.
Claim 11
Dependent Claim 29 words
A method according to claim 7, in which the depth of fluidized bed material in each bed is measured by measuring the pressure drop occurring across the respective bed.
Claim 12
Dependent Claim 89 words
A method according to claim 7, in which measurement signals indicative of the thermal output of the plant, the temperature in the first bed and the respective depths of fluidized bed material in the two beds are supplied to signal processing equipment which compares these values with desired values for the required thermal output of the plant and influences control means to effect transfer of bed material from one bed to the other bed in dependence on the magnitude and direction of deviations between the measured and required values.

References Cited (Backward Citations)

GB868710A Cited
US3431892A Cited
US3823693A Cited
GB1473399A Cited
US3902462A Cited
US4279205A Cited
US4476816A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1989-09-29 1990-03-31 1990-09-30 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1993-09-29 1994-03-31 1994-09-30 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1997-09-29 1998-03-31 1998-09-30 $7700.00 Window Closed / Lapsed