Energy management load leveling

Assignee: Honeywell Inc
•
Filing: 1984-08-06
•
Granted: 1986-09-16
•
Expires: 2004-08-06
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A system for leveling energy consumption of loads being controlled by a duty cycle routine, the loads having on times and off times within a predetermined period of time established by the duty cycle routine, the system having a plurality of loads, a communication channel connected to each of the loads, and a controller connected to the communication channel, the controller determining a gap time during which no load is off, the gap time being a function of the period of time, the sum of all of the off times for each of the loads, and the number of loads, the controller scheduling the loads to be off, the off times being distributed over the period of time with a gap time existing between adjacent off times.

Inventors

  • 👤 Charles H. Culp

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-06 09:14
CPC Classifications
H; H02; H02J; H02J3/00; H02J3/12; H02J3/14; H02J2105/00; H02J2105/50; H02J2105/52; H02J2105/57; Y; Y02; Y02B; Y02B70/00; Y02B70/30; Y02B70/3225; Y04; Y04S; Y04S20/00; Y04S20/20; Y04S20/222

Claims Analysis

Total Claims: 11
Claim 1
Independent Claim 144 words
A system for leveling energy consumption of loads being controlled by a duty cycle routine, the loads having on times and off times within a predetermined period of time established by said duty cycle routine, said system comprising: a plurality of loads; communication means connected to each of said loads; and, controller means connected to said communication means, said controller means determining a gap time, said gap time being a function of said period of time, the sum of said off times for at least some of said loads, and the number of said at least some of said loads, said controller means scheduling said loads to be off, said off times of said at least some of said loads being distributed over said period of time with said gap time existing between adjacent off times of said at least some of said loads.
Claim 2
Independent Claim 144 words
A system for leveling energy consumption of loads being controlled by a duty cycle routine, the loads having on times and off times within a predetermined period of time established by said duty cycle routine, said system comprising: a plurality of loads; communication means connected to each of said loads; and, controller means connected to said communication means, said controller means determining a gap time, said gap time being a function of said period of time, the sum of said off times for at least some of said loads, and the number of said at least some of said loads, said controller means scheduling said loads to be off, said off times of said at least some of said loads being distributed over said period of time with said gap time existing between adjacent off times of said at least some of said loads.
Claim 3
Dependent Claim 48 words
The system of claim 1 wherein said controller means determines said gap time by dividing the difference between said period of time and the sum of said off times for said at least some of said loads by the number of said at least some of said loads.
Claim 4
Dependent Claim 113 words
The system of claim 2 wherein said controller means includes means for determining which load has the largest off time KW value, which load has the smallest off time KW value, which load has the next largest KW value, which load has the next smallest KW value and so on, and means for scheduling, if said gap time is greater than 0, the loads to be turned off in the sequence of the load having the largest off time KW value, the load having the smallest off time KW value, the load having the next largest off time KW value, the load having the next smallest off time KW value and so on.
Claim 5
Dependent Claim 206 words
The system of claim 2 wherein said controller means comprises means for determining an off time KW value for each of said loads, and means for adding said off time KW values, if said gap time is not greater than 0, until the next off time to be added causes the sum of said off times to exceed said period of time, means for scheduling the off times of the loads thus determined to be turned off in order of the load having the largest KW value, the load having the smallest KW value, the load having the next largest KW value, the load having the next smallest KW value and so on without gap times therebetween, means for determining the gap time of the remaining loads and, if this last computed gap time is greater than 0, for determining the off time KW values of the remaining loads and for scheduling these loads to be turned off in order of the load having the largest off time KW value first, the load having the smallest off time KW value second, the load having the next largest off time KW value third, the load having the next smallest off time KW value fourth and so on.
Claim 6
Independent Claim 189 words
A system for leveling energy consumption of loads being controlled by a duty cycle routine, the loads having on times and off times within a predetermined period of time established by said duty cycle routine, said system comprising: a plurality of loads; communication means connected to each of said loads; and, controller means connected to said communication means, said controller means determining a gap time, said gap time being a function of said period of time, the sum of all said off times for each of said loads, and the number of loads, said controller means determining an off time KW value for each of said loads, said controller means scheduling, if said gap time is greater than 0, the loads to be off with said load having the largest off time KW value first, the load having the smallest off time KW value second, the load having the next largest off time KW value third, the load having the next smallest off time KW value fourth, and so on, said off times being distributed over said period of time with a gap time existing between adjacent off times.
Claim 7
Independent Claim 189 words
A system for leveling energy consumption of loads being controlled by a duty cycle routine, the loads having on times and off times within a predetermined period of time established by said duty cycle routine, said system comprising: a plurality of loads; communication means connected to each of said loads; and, controller means connected to said communication means, said controller means determining a gap time, said gap time being a function of said period of time, the sum of all said off times for each of said loads, and the number of loads, said controller means determining an off time KW value for each of said loads, said controller means scheduling, if said gap time is greater than 0, the loads to be off with said load having the largest off time KW value first, the load having the smallest off time KW value second, the load having the next largest off time KW value third, the load having the next smallest off time KW value fourth, and so on, said off times being distributed over said period of time with a gap time existing between adjacent off times.
Claim 8
Dependent Claim 48 words
The system of claim 5 wherein said contoller means determines said gap time by dividing the difference between said period of time and the sum of said off times for said at least some of said loads by the number of said at least some of said loads.
Claim 9
Independent Claim 321 words
A system for leveling energy consumption of loads being controlled by a duty cycle routine, the loads having on times and off times within a predetermined period of time established by said duty cycle routine, said system comprising: a plurality loads; communication means connected to each of said loads; and, controller means connected to said communication means, said controller means determining a gap time as a function of said period of time, the sum of all said off times for each of said loads, and the number of loads, said controller means determining an off time KW value for each of said loads, said controller means, if said gap time is not greater than 0, adding the off times of said load having the largest off time KW value, the load having the smallest off time KW value, the load having the next largest off time KW value, the load havng the next smallest off time KW value and so on until the next off time to be added will cause the sum of the off times to exceed the period, said controller means scheduling said loads, exclusive of said load having the off time which will cause said sum to exceed said period, to be turned off in sequence beginning with said load having said largest off time KW value, then said load having said smallest off time KW value, then said load having the next largest off time KW value, then the load having the next smallest off time KW value and so on with no gap time between adjacent off times, said controller means then redetermining said tap time as a function of said period of time, the remainder of said loads, and the total number of remaining loads, said controller means rescheduling the sequence in which the remaining loads are to be turned off, adjacent off times for said remaining loads being separated by said gap time.
Claim 10
Independent Claim 321 words
A system for leveling energy consumption of loads being controlled by a duty cycle routine, the loads having on times and off times within a predetermined period of time established by said duty cycle routine, said system comprising: a plurality loads; communication means connected to each of said loads; and, controller means connected to said communication means, said controller means determining a gap time as a function of said period of time, the sum of all said off times for each of said loads, and the number of loads, said controller means determining an off time KW value for each of said loads, said controller means, if said gap time is not greater than 0, adding the off times of said load having the largest off time KW value, the load having the smallest off time KW value, the load having the next largest off time KW value, the load havng the next smallest off time KW value and so on until the next off time to be added will cause the sum of the off times to exceed the period, said controller means scheduling said loads, exclusive of said load having the off time which will cause said sum to exceed said period, to be turned off in sequence beginning with said load having said largest off time KW value, then said load having said smallest off time KW value, then said load having the next largest off time KW value, then the load having the next smallest off time KW value and so on with no gap time between adjacent off times, said controller means then redetermining said tap time as a function of said period of time, the remainder of said loads, and the total number of remaining loads, said controller means rescheduling the sequence in which the remaining loads are to be turned off, adjacent off times for said remaining loads being separated by said gap time.
Claim 11
Dependent Claim 48 words
The system of claim 7 wherein said controller means determines said gap time by dividing the difference between said period of time and the sum of said off times for said at least some of said loads by the number of said at least some of said loads.

References Cited (Backward Citations)

US4136392A Cited
US4324987A Cited
US4245319A Cited
US4347576A Cited
US4382284A Cited
US4511979A Cited
US4549274A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1989-09-15 1990-03-17 1990-09-16 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1993-09-15 1994-03-17 1994-09-16 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1997-09-15 1998-03-17 1998-09-16 $7700.00 Window Closed / Lapsed