← Back to Patent Explorer
US4608061A Expired / Lapsed US ⏱️ 0.0 years remaining

Normal butane/iso-butane separation

Assignee: Katalistiks International Inc
•
Filing: 1985-06-28
•
Granted: 1986-08-26
•
Expires: 2005-06-28
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Iso-butane is separated from normal butane in a pressure swing adsorption system of at least three adsorbent beds, each adapted to selectively adsorb normal butane from a mixture thereof with iso-butane. The adsorption front of normal butane formed in each adsorbent bed upon the passage of the feed gas mixture thereto is moved through the bed to an extent enhancing the utilization of the adsorptive capacity thereof. By combinations of depressurization and repressurization together with purge, desirable product purity levels are obtained, while the cost of adsorbent equipment and of operation are reduced to the extent possible consistent with the purity requirements of a given application.

Inventors

  • 👤 Warren K. Volles
  • 👤 Nelson A. Cusher

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-03 23:14
CPC Classifications
B; B01; B01D; B01D53/00; B01D53/02; B01D53/04; B01D53/047; C; C07; C07C; C07C7/00; C07C7/12; B01D2253/00; B01D2253/30; B01D2253/302; B01D2253/304; B01D2256/00; B01D2256/24; B01D2257/00; B01D2257/70; B01D2257/702; B01D2257/7022; B01D2259/00; B01D2259/40; B01D2259/403

Claims Analysis

Total Claims: 22
Claim 1
Independent Claim 357 words
An improved pressure swing adsorption process for the separation of iso-butane from normal butane in an adsorption system having at least three adsorbent beds, each bed of which undergoes, on a cyclic basis, a processing sequence comprising: (a) introducing a feed gas mixture of iso-butane and normal butane at an upper adsorption pressure to the feed end of the bed capable of selectively adsorbing normal butane as the more selectivity adsorbable component of the gas mixture, while iso-butane as the less readily adsorbable component passes through the bed and is discharged from the discharge end thereof, such feed gas introduction being continued as a normal butane adsorption front is formed in the bed and passes through the bed from the feed end thereof and breaks through at the discharge end of the bed, a portion of the iso-butane effluent stream thus discharged being diverted for passage as purge gas to another bed in the system; (b) countercurrently depressurizing said bed with release of gas from the feed end thereof, thereby depressurizing said bed to an intermediate pressure, said released gas being passed to another bed initially at a lower pressure for pressure equalization at said intermediate pressure; (c) further countercurrently depressurizing said bed with release of additional amounts of gas from the feed end thereof, thereby depressurizing said bed to a lower desorption pressure, the gas released being recovered as normal butane product gas; (d) countercurrently purging said bed by the addition of iso-butane purge gas to the discharge end thereof, thereby purging residual normal butane present in the void spaces of the bed to enhance the recovery of normal butane product gas and the purity thereof; e) partially repressurizing said bed by the passage of countercurrent depressurization effluent gas from a bed in the system initially at a higher pressure for pressure equalization therebetween at said intermediate pressure level; and (f) further repressurizing said bed from the intermediate pressure to said upper adsorption pressure by the addition of feed gas thereto, whereby enhanced bed utilization and productivity are achieved at advantageous adsorbent and captial equipment requirements, and advantageous operating expenses, for the desired gas separation operation.
Claim 2
Dependent Claim 357 words
An improved pressure swing adsorption process for the separation of iso-butane from normal butane in an adsorption system having at least three adsorbent beds, each bed of which undergoes, on a cyclic basis, a processing sequence comprising: (a) introducing a feed gas mixture of iso-butane and normal butane at an upper adsorption pressure to the feed end of the bed capable of selectively adsorbing normal butane as the more selectivity adsorbable component of the gas mixture, while iso-butane as the less readily adsorbable component passes through the bed and is discharged from the discharge end thereof, such feed gas introduction being continued as a normal butane adsorption front is formed in the bed and passes through the bed from the feed end thereof and breaks through at the discharge end of the bed, a portion of the iso-butane effluent stream thus discharged being diverted for passage as purge gas to another bed in the system; (b) countercurrently depressurizing said bed with release of gas from the feed end thereof, thereby depressurizing said bed to an intermediate pressure, said released gas being passed to another bed initially at a lower pressure for pressure equalization at said intermediate pressure; (c) further countercurrently depressurizing said bed with release of additional amounts of gas from the feed end thereof, thereby depressurizing said bed to a lower desorption pressure, the gas released being recovered as normal butane product gas; (d) countercurrently purging said bed by the addition of iso-butane purge gas to the discharge end thereof, thereby purging residual normal butane present in the void spaces of the bed to enhance the recovery of normal butane product gas and the purity thereof; e) partially repressurizing said bed by the passage of countercurrent depressurization effluent gas from a bed in the system initially at a higher pressure for pressure equalization therebetween at said intermediate pressure level; and (f) further repressurizing said bed from the intermediate pressure to said upper adsorption pressure by the addition of feed gas thereto, whereby enhanced bed utilization and productivity are achieved at advantageous adsorbent and captial equipment requirements, and advantageous operating expenses, for the desired gas separation operation.
Claim 3
Dependent Claim 33 words
The process of claim 1 in which the repressurization of the bed in steps (e) and (f) is carried out cocurrently by the addition of gas to the feed end of the bed.
Claim 4
Dependent Claim 44 words
The process of claim 2 in which said introduction of the feed gas mixture to the bed in step (a) is carried out until the stoichiometric point of the adsorption front reaches from about 90% to about 100% of the length of the bed.
Claim 5
Dependent Claim 54 words
The process of claim 3 in which said countercurrent purge step (d) is continued until up to about 80% to about 100% of the void space gas between the adsorbent particles in the bed is displaced in the direction of the feed end of the bed and is discharged from the feed end thereof.
Claim 6
Dependent Claim 37 words
The process of claim 4 in which the iso-butane purge gas comprises the portion of the iso-butane effluent stream diverted from a bed for use as purge gas in step (a) as carried out in that bed.
Claim 7
Dependent Claim 19 words
The process of claim 5 in which said upper adsorption pressure is from about 100 to about 300 psia.
Claim 8
Dependent Claim 23 words
The process of claim 6 in which said lower desorption pressure is in the range of from about 5 to about 20 psia.
Claim 9
Dependent Claim 14 words
The process of claim 6 in which said adsorption system comprises three adsorbent beds.
Claim 10
Dependent Claim 23 words
The process of claim 8 in which said lower desorption pressure is in the range of from about 5 to about 20 psia.
Claim 11
Dependent Claim 19 words
The process of claim 9 in which the reaction temperature is from about 400° F. to about 600° F.
Claim 12
Dependent Claim 25 words
The process of claim 10 in which the feed gas mixture has a normal butane concentration of from about 30% to about 70% by volume.
Claim 13
Dependent Claim 17 words
The process of claim 6 in which said adsorption system comprises from four to six adsorbent beds.
Claim 14
Dependent Claim 23 words
The process of claim 12 in which said lower desorption pressure is in the range of from about 5 to about 20 psia.
Claim 15
Dependent Claim 13 words
The process of claim 12 in which said adsorption system comprises four beds.
Claim 16
Dependent Claim 19 words
The process of claim 12 in which the reaction temperature is from about 400° F. to about 600° F.
Claim 17
Dependent Claim 25 words
The process of claim 15 in which the feed gas mixture has a normal butane concentration of from about 30% to about 70% by volume.
Claim 18
Dependent Claim 19 words
The process of claim 3 in which said upper adsorption pressure is from about 100 to about 300 psia.
Claim 19
Dependent Claim 23 words
The process of claim 17 in which said lower desorption pressure is in the range of from about 5 to about 20 psia.
Claim 20
Dependent Claim 19 words
The process of claim 1 in which the reaction temperature is from about 400° F. to about 600° F.
Claim 21
Dependent Claim 25 words
The process of claim 1 in which the feed gas mixture has a normal butane concentration of from about 30% to about 70% by volume.
Claim 22
Dependent Claim 22 words
The process of claim 1 in which the overall time for each processing cycle is from about 3 to about 6 minutes.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1989-08-25 1990-02-24 1990-08-26 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1993-08-25 1994-02-24 1994-08-26 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1997-08-25 1998-02-24 1998-08-26 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag