US4606038A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Plant for producing calcium carbide
Assignee: Primetals Technologies Austria GmbH
•
Filing: 1983-12-01
•
Granted: 1986-08-12
•
Expires: 2003-12-01
Abstract
Abstract A burden of either or both CaO or CaCO 3 and coal is melted and reduced by a plasma torch established between a plasma burner penetrating the upper structure of a furnace and an electrode in the bottom of the furnace to produce CaC 2 . The burden is supplied to the furnace from above and the CO produced by the reaction flows upwardly through the unreacted burden to pre-heat and pre-reduce it.
Inventors
- 👤 Walter Lugscheider
- 👤 Ernst Riegler
- 👤 Ernst Zajicek
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-07 11:55
CPC Classifications
H; H05; H05B; H05B7/00; C; C01; C01B; C01B32/00; C01B32/90; C01B32/914; C01B32/942
Claims Analysis
Total Claims: 10
Claim 1
Independent Claim
213 words
A plant for producing calcium by melting and reducing a burden including as components, coal and one or both of CaO and CaCo 3 comprising: a melting furnace having a melting space defined by a bottom part, side walls and a vault part carried by side walls and having an opening therein, at least one plasma burner penetrating said melting furnace into said melting space, a bottom electrode disposed in said bottom part, said at least one plasma burner being directed towards said bottom electrode and forming a plasma torch therebetween, said bottom part comprising an upper surface in the form of an upwardly extending cone, said bottom electrode extending through said bottom part to the top of said cone, the downwardly diverging surface of said cone meeting said side walls to provide a groove for molten stock surrounding said bottom electrode, and means for supplying said burden components into said melting space through said opening in the vault part to said bottom part in the region of said plasma torch to be melted and reduced thereby to produce CaC 2 and CO, the CO produced by the reaction of said components in the region of the plasma torch flowing through the unreacted portions of said burden components before they reach said region.
Claim 2
Dependent Claim
213 words
A plant for producing calcium by melting and reducing a burden including as components, coal and one or both of CaO and CaCo 3 comprising: a melting furnace having a melting space defined by a bottom part, side walls and a vault part carried by side walls and having an opening therein, at least one plasma burner penetrating said melting furnace into said melting space, a bottom electrode disposed in said bottom part, said at least one plasma burner being directed towards said bottom electrode and forming a plasma torch therebetween, said bottom part comprising an upper surface in the form of an upwardly extending cone, said bottom electrode extending through said bottom part to the top of said cone, the downwardly diverging surface of said cone meeting said side walls to provide a groove for molten stock surrounding said bottom electrode, and means for supplying said burden components into said melting space through said opening in the vault part to said bottom part in the region of said plasma torch to be melted and reduced thereby to produce CaC 2 and CO, the CO produced by the reaction of said components in the region of the plasma torch flowing through the unreacted portions of said burden components before they reach said region.
Claim 3
Dependent Claim
19 words
A plant as set forth in claim 1, wherein said at least one plasma burner penetrates said side walls.
Claim 4
Dependent Claim
19 words
A plant as set forth in claim 1, wherein said at least one plasma burner penetrates said vault part.
Claim 5
Dependent Claim
27 words
A plant as set forth in claim 1, further comprising an additional supply means provided in said vault part of said melting space for supplying fine-particle coal.
Claim 6
Dependent Claim
238 words
A plant for producing calcium carbide by melting and reducing a burden including as components, coal and one or both of CaO and CaCO 3 comprising: a melting furnace having a melting space defined by a bottom part, side walls and a vault part carried by said side walls and having an opening therein, at least one plasma burner penetrating said melting furnace into said melting space, a bottom electrode disposed in said bottom part, said at least one plasma burner being directed towards said bottom electrode and forming a plasma torch therebetween, a shaft part with an upper portion having an upper end, said shaft having a diameter that is smaller than the diameter of said melting space and being superposed on the vault part of said melting space, a gas vent provided in said upper portion of said shaft part, and means on said upper end of said shaft part for continuously charging burden components through said shaft part to the bottom of said melting space, whereby during the continuous supply of said burden components a cone of solid burden components extending from said bottom of said melting space to said gas vent is formed, the lower part of said burden cone in the region of said plasma torch being melted and the upper part of said burden cone being pre-reduced by CO forming in said melting space and flowing upwardly through said cone upper part.
Claim 7
Dependent Claim
238 words
A plant for producing calcium carbide by melting and reducing a burden including as components, coal and one or both of CaO and CaCO 3 comprising: a melting furnace having a melting space defined by a bottom part, side walls and a vault part carried by said side walls and having an opening therein, at least one plasma burner penetrating said melting furnace into said melting space, a bottom electrode disposed in said bottom part, said at least one plasma burner being directed towards said bottom electrode and forming a plasma torch therebetween, a shaft part with an upper portion having an upper end, said shaft having a diameter that is smaller than the diameter of said melting space and being superposed on the vault part of said melting space, a gas vent provided in said upper portion of said shaft part, and means on said upper end of said shaft part for continuously charging burden components through said shaft part to the bottom of said melting space, whereby during the continuous supply of said burden components a cone of solid burden components extending from said bottom of said melting space to said gas vent is formed, the lower part of said burden cone in the region of said plasma torch being melted and the upper part of said burden cone being pre-reduced by CO forming in said melting space and flowing upwardly through said cone upper part.
Claim 8
Dependent Claim
185 words
A plant for producing calcium carbide by melting and reducing a burden including as components, coal and one or both of CaO and CaCO 3 , comprising: a melting furnace having a melting space defined by a bottom part, side walls, and a vault part carried by said side walls and having an opening therein, at least one plasma burner penetrating said melting furnace into said melting space, a bottom electrode disposed in said bottom part, said at least one plasma burner being directed towards said bottom electrode and forming a plasma torch therebetween, a shaft furnace having a filling opening at its upper end and conically diverging downwardly towards its bottom end, said shaft furnace being positioned above said melting space, a connecting channel extending upwardly from said melting space, conveying means provided in said bottom end of said shaft furnace for conveying burden components from said bottom end to said connecting channel, and a gas vent adjacent the upper end of the shaft furnace, and means for supplying said burden components comprising charging means provided at the upper end of said shaft furnace.
Claim 9
Dependent Claim
185 words
A plant for producing calcium carbide by melting and reducing a burden including as components, coal and one or both of CaO and CaCO 3 , comprising: a melting furnace having a melting space defined by a bottom part, side walls, and a vault part carried by said side walls and having an opening therein, at least one plasma burner penetrating said melting furnace into said melting space, a bottom electrode disposed in said bottom part, said at least one plasma burner being directed towards said bottom electrode and forming a plasma torch therebetween, a shaft furnace having a filling opening at its upper end and conically diverging downwardly towards its bottom end, said shaft furnace being positioned above said melting space, a connecting channel extending upwardly from said melting space, conveying means provided in said bottom end of said shaft furnace for conveying burden components from said bottom end to said connecting channel, and a gas vent adjacent the upper end of the shaft furnace, and means for supplying said burden components comprising charging means provided at the upper end of said shaft furnace.
Claim 10
Dependent Claim
16 words
A plant as set forth in claim 6, wherein said conveying means is a chain conveyor.
References Cited (Backward Citations)
DE105386C
Cited
DE386482C
Cited
DE480540C
Cited
DE526626C
Cited
US1880012A
Cited
FR1036208A
Cited
GB1068174A
Cited
US3404078A
Cited
US3979500A
Cited
US4022872A
Cited
US4154972A
Cited
US4309170A
Cited
US4390773A
Cited
US4396421A
Cited
US4425659A
Cited
US4423512A
Cited
US4493088A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1989-08-11 | 1990-02-10 | 1990-08-12 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1993-08-11 | 1994-02-10 | 1994-08-12 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1997-08-11 | 1998-02-10 | 1998-08-12 | $7700.00 | Window Closed / Lapsed |