US4578944A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Heat recovery steam generator outlet temperature control system for a combined cycle power plant
Assignee: Westinghouse Electric Corp
•
Filing: 1984-10-25
•
Granted: 1986-04-01
•
Expires: 2004-10-25
Abstract
Abstract In a combined cycle plant boiler an inlet temperature is adjusted or controlled while concurrently modulating the IGV's and the load of the gas turbine and the attemperator of the boiler, and concurrent modulation of the IGV's, the gas turbine load, the attemperator is effected as upon three independent control variables to adjust and/or maintain the boiler outlet temperature independently of steam turbine operation and to maximize gas turbine load control range. Control of the output temperature of one boiler is also managed in relation with the mixed temperature of steam from other boilers fluidly connected to the steam turbines.
Inventors
- 👤 Alan Martens
- 👤 Gerald A. Myers
- 👤 William L. McCarty
- 👤 Kermit R. Wescott
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-29 22:56
CPC Classifications
F; F01; F01K; F01K23/00; F01K23/02; F01K23/06; F01K23/10; F01K23/103; F01K23/105; Y; Y02; Y02E; Y02E20/00; Y02E20/14; Y02E20/16
Claims Analysis
Total Claims: 16
Claim 1
Independent Claim
188 words
In a command cycle electrical power plant including: a steam turbine and at least one set comprising a gas turbine, an afterburner and a heat recovery steam generator having an attemperator for supplying from an outlet thereof to said steam turbine superheated steam under steam turbine operating conditions requiring predetermined superheated steam temperature, flow and pressure; with said gas turbine and steam turbine each generating megawatts in accordance with a plant load demand; master control means being provided for controlling said steam turbine and said heat recovery steam generator so as to establish said steam operating conditions; the combination of: first control means responsive to the gas inlet temperature of said heat recovery steam generator and to the plant load demand for controlling the firing of said afterburner; second control means responsive to said superheated steam predetermined temperature and to superheated steam temperature from said outlet for controlling the attemperator between a closed and an open position; said first and second control means being operated concurrently to maintain said superheated steam outlet temperature while controlling the load of said gas turbine independently of said steam turbine operating conditions.
Claim 2
Dependent Claim
188 words
In a command cycle electrical power plant including: a steam turbine and at least one set comprising a gas turbine, an afterburner and a heat recovery steam generator having an attemperator for supplying from an outlet thereof to said steam turbine superheated steam under steam turbine operating conditions requiring predetermined superheated steam temperature, flow and pressure; with said gas turbine and steam turbine each generating megawatts in accordance with a plant load demand; master control means being provided for controlling said steam turbine and said heat recovery steam generator so as to establish said steam operating conditions; the combination of: first control means responsive to the gas inlet temperature of said heat recovery steam generator and to the plant load demand for controlling the firing of said afterburner; second control means responsive to said superheated steam predetermined temperature and to superheated steam temperature from said outlet for controlling the attemperator between a closed and an open position; said first and second control means being operated concurrently to maintain said superheated steam outlet temperature while controlling the load of said gas turbine independently of said steam turbine operating conditions.
Claim 3
Dependent Claim
64 words
The power plant of claim 1 with said gas turbine having inlet guide vanes (IGV's) operable between an open and a closed position and means for concurrently controlling said IGV's in response to the load of said gas turbine for changing the inlet temperature of gasses to said heat recovery steam generator, thereby to minimize changes on said operating conditions of said steam turbine.
Claim 4
Dependent Claim
134 words
The power plant of claim 2 with said IGV's controlling means including: a first function generator responsive to a signal representative of the gas turbine load demand for generating a first setpoint signal representative of IGV positions within a predetermined range of said gas turbine load demand; a second function generator responsive to a signal representative of the difference between said gas inlet temperature of said heat recovery steam generator plant and the steam turbine rotor temperature for generating a second IGV position setpoint signal; and a third function generator responsive to a signal representative of the gas exhaust temperature into said afterburner for generating a third IGV position setpoint signal; the highest signal in magnitude of said first, second and third IGV position setpoint signals being used to control said IGV's in position.
Claim 5
Dependent Claim
35 words
The plant of claim 3 with said first, second and third IGV position setpoint signals being operative linearly in a range extending from the closed position to a small fraction away from fully open position.
Claim 6
Dependent Claim
80 words
The plant of claim 4 with said IGV controlling means further including a fourth function generator responsive to the gas inlet temperature of said gas turbine for generating a fourth IGV position setpoint signal, said fourth IGV position setpoint signal being operative in magnitude in a range corresponding to between partially open and fully open IGV; the lowest signal in magnitude between said highest signal and said fourth IGV position setpoint signal being used to control said IGV's in position.
Claim 7
Dependent Claim
29 words
The plant of claim 5 with ramping means responsive to said lowest signal for applying ramp signal at a selected rate of change to move said IGV's into position.
Claim 8
Dependent Claim
39 words
The plant of claim 6 with feedback loop means for deriving a ramp feedback signal from said ramping means, the difference between said position feedback signal and said ramp feedback signal being used to move said IGV's into position.
Claim 9
Dependent Claim
79 words
The plant of claim 7 with said first control means being responsive to a plant load demand error representative signal generating an afterburner ramping setpoint signal for said afterburner in accordance with an afterburner ramping function and in relation to said load demand error representative signal; with controller means being provided responsive to the gas inlet temperature of said heat recovery steam generator and to said afterburner ramping setpoint signal for applying an afterburner control signal to said afterburner.
Claim 10
Dependent Claim
26 words
The plant of claim 8 with said afterburner controller means being operative concurrently with a signal which is the derivative of said afterburner ramping setpoint signal.
Claim 11
Dependent Claim
28 words
The plant of claim 9 with said afterburner control signal being applied at a rate which is substantially larger toward the open position than toward the closed position.
Claim 12
Dependent Claim
104 words
The plant of claim 10 with the plant including at least two of said sets of a gas turbine, an afterburner and a heat recovery steam generator having an attemperator, said steam turbine operating conditions involving predetermined superheated steam temperature, flow and pressure for mixed superheated steam from said sets, with said second control means including (a) an attemperator controller responsive to said predetermined temperature in relation to mixed superheated steam and to a targeted predetermined temperature, and (b) an attemperator ramp generator responsive to said attemperator controller for generating an attemperator ramping setpoint signal to position said attemperator between open and closed positions.
Claim 13
Dependent Claim
45 words
The plant of claim 11 with said attemperator controller being responsive to the outlet temperature of the attemperator of said one set, means being provided for giving priority upon said attemperator controller to the lower between said mixed steam predetermined temperature and said outlet temperature.
Claim 14
Dependent Claim
99 words
The plant of claim 11 with said second control means further including limiter means responsive to gas inlet temperature of the heat recovery steam generator of said one set for establishing a limited gas inlet temperature thereof, a comparator being provided responsive to the outlet temperature of the attemperator of said one set and to said limited gas inlet temperature for establishing a temperature error, and an override controller being provided responsive to said temperature error for generating an overriding command signal operative upon said attemperator controller to match the gas inlet temperature with the superheated steam outlet temperature.
Claim 15
Dependent Claim
37 words
The plant of claim 12 with means responsive to the difference between the steam turbine rotor temperature and said mixed superheated steam predetermined temperature exceeding predetermined amount for modifying the ramping rate of said attemperator setpoint signal.
Claim 16
Dependent Claim
36 words
The plant of claim 12 with means responsive to the difference between the superheated steam outlet temperature and said superheated steam predetermined temperature exceeding a predetermined amount for modifying the ramping rate of said attemperator setpoint.
References Cited (Backward Citations)
US2594818A
Cited
US3183897A
Cited
US3807364A
Cited
US3879616A
Cited
US3939328A
Cited
US3953966A
Cited
US3948043A
Cited
US3973391A
Cited
US4010605A
Cited
US4031404A
Cited
US4168608A
Cited
US4184324A
Cited
US4333310A
Cited
US4081956A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1989-03-31 | 1989-09-30 | 1990-04-01 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1993-03-31 | 1993-09-30 | 1994-04-01 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1997-03-31 | 1997-09-30 | 1998-04-01 | $7700.00 | Window Closed / Lapsed |