Claims Analysis
Total Claims: 10
Claim 1
Independent Claim
132 words
An apparatus for controlling the supply of a product to a pooling unit from a supply device, comprising: a sensor for sensing whether the product has been supplied to a preset level of the pooling unit; first timing means for measuring a first time period from the start of supply of the product to the pooling unit until the sensor senses that the preset level is attained; calculating and measuring means for calculating a second time period, based on the first time period, while the product continues to be supplied to the pooling unit; and means, operatively connected to said calculating and measuring means, for halting the supply of the product to the pooling unit in response to the expiration of the second time period calculated by said calculating and measuring means.
Claim 2
Independent Claim
132 words
An apparatus for controlling the supply of a product to a pooling unit from a supply device, comprising: a sensor for sensing whether the product has been supplied to a preset level of the pooling unit; first timing means for measuring a first time period from the start of supply of the product to the pooling unit until the sensor senses that the preset level is attained; calculating and measuring means for calculating a second time period, based on the first time period, while the product continues to be supplied to the pooling unit; and means, operatively connected to said calculating and measuring means, for halting the supply of the product to the pooling unit in response to the expiration of the second time period calculated by said calculating and measuring means.
Claim 3
Dependent Claim
56 words
An apparatus according to claim 1, wherein said sensor includes means for sensing the product as it passes into the pooling unit, the time for passage into the pooling unit being measured cumulatively by said first timing means, the first time period being equal to the total time for passage until the preset level is attained.
Claim 4
Dependent Claim
65 words
An apparatus according to claim 1, wherein said sensor includes means for sensing the product as it passes into the pooling unit, the time intervals in which the product does not pass into the pooling unit being measured cumulatively by said first timing means, the total duration of the first time period being equal to the time intervals measured until the preset level is attained.
Claim 5
Dependent Claim
101 words
An apparatus according to claim 1, wherein said first timing means outputs a signal when the preset level has been attained, and wherein said calculating and measuring means comprises: a function generator for producing the second time period; second timing means, operatively connected to said first timing means, for measuring elapsed time following the generation of the signal indicating attainment of the preset level; and a comparator, operatively connected to said first timing means and said function generator, for comparing the second time period and the elapsed time and determining whether the elapsed time is equal to the second time period.
Claim 6
Independent Claim
107 words
A method of controlling the supply of a product to a pooling unit from a supply device, comprising steps of: (a) sensing whether the product has been supplied to a preset level of the pooling unit; (b) measuring a first time period from the start of supply of the product to the pooling unit until the preset level is sensed as being attained; (c) calculating and measuring a second time period, based on the first time period, while the product is supplied to the pooling unit; and (d) halting supply of the product to the pooling unit in response to the expiration of the second time period.
Claim 7
Independent Claim
107 words
A method of controlling the supply of a product to a pooling unit from a supply device, comprising steps of: (a) sensing whether the product has been supplied to a preset level of the pooling unit; (b) measuring a first time period from the start of supply of the product to the pooling unit until the preset level is sensed as being attained; (c) calculating and measuring a second time period, based on the first time period, while the product is supplied to the pooling unit; and (d) halting supply of the product to the pooling unit in response to the expiration of the second time period.
Claim 8
Dependent Claim
56 words
A method according to claim 5, in which said step (b) comprises the substeps of: (i) sensing when the product is passing into the pooling unit and cumulatively measuring the time for passage through the pooling unit; and (ii) obtaining, as the first time period, a total time for passage until the preset level is attained.
Claim 9
Dependent Claim
75 words
A method according to claim 5, in which said step (b) comprises the substeps of: (i) sensing when the product is passing into the pooling unit and cumulatively measuring the time intervals during which the product does not pass into the pooling unit; and (ii) obtaining, as the first time period, the total duration of the time intervals during which the product does not pass into the pooling unit until the preset level is attained.
Claim 10
Dependent Claim
47 words
A method according to claim 5, wherein said step (c) comprises the substep of calculating the second time period by performing the operation T2=f(T1), where T2 is the second time period, T1 is the first time period and f(T1) is a function which increases when T1 increases.