Patent JPS59160718A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4571125A Expired / Lapsed US ⏱️ 0.0 years remaining

Floating offshore structure

Assignee: Mitsui Engineering and Shipbuilding Co Ltd
•
Filing: 1985-03-15
•
Granted: 1986-02-18
•
Expires: 2005-03-15
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A floating offshore structure which is moored at a fixed position on the sea by means of mooring hawsers and anchors connected to the ends thereof respectively for conducting a submarine excavating operation from a deck of the structure. The structure includes a moorage hull part provided with a vertical through-hole formed therein for receiving an excavating drill pipe and the mooring hawsers and a movable hull part connected to the moorage hull part so as to be rotatable within a horizontal plane. The movable hull part is constituted as a hull defining the outer wall of the floating offshore structure and connected with the moorage hull part by inserting it into a moorage hull part receiving hole formed at a position closer to the bow thereof. The movable hull part has near its water plane a horizontal section with a substantially oval shape formed by a fore draft part in a substantially circular or polygonal shape with the moorage hull part receiving hole as a center and an after draft part taperingly projecting aft from the fore draft part.

Inventors

  • 👤 Masanao Oshima
  • 👤 Hitoshi Narita
  • 👤 Nobuyoshi Yashima
  • 👤 Hiroshi Tabuchi

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-09 07:12
CPC Classifications
B; B63; B63B; B63B21/00; B63B21/50; B63B21/507; B63B35/00; B63B35/44; B63B35/4413; B63B2211/00; B63B2211/06

Claims Analysis

Total Claims: 5
Claim 1
Independent Claim 165 words
A floating offshore structure for mooring at a fixed position on the sea by means of a mooring hawser having an anchor connected at the end thereof, for conducting a submarine excavating operation by an excavating drill pipe, comprising: a hull; a vertical through-hole formed in said hull; means for preventing floating objects such as broken ice from entering said vertical through-hole, comprising a tubular body projecting downwardly from a bottom of said hull substantially coaxial with said vertical through-hole such that the mooring hawser and the excavating drill pipe can be extended through said vertical through-hole and tubular body to the sea bottom, said tubular body in an operative position projecting below said hull bottom a sufficient distance to prevent said floating objects from entering said vertical through hole, but without reaching said sea bottom; and means for suppressing oscillation of said floating offshore structure, comprising an overhanging member projecting radially outwardly from an outer periphery of a lower end of said tubular body.
Claim 2
Dependent Claim 165 words
A floating offshore structure for mooring at a fixed position on the sea by means of a mooring hawser having an anchor connected at the end thereof, for conducting a submarine excavating operation by an excavating drill pipe, comprising: a hull; a vertical through-hole formed in said hull; means for preventing floating objects such as broken ice from entering said vertical through-hole, comprising a tubular body projecting downwardly from a bottom of said hull substantially coaxial with said vertical through-hole such that the mooring hawser and the excavating drill pipe can be extended through said vertical through-hole and tubular body to the sea bottom, said tubular body in an operative position projecting below said hull bottom a sufficient distance to prevent said floating objects from entering said vertical through hole, but without reaching said sea bottom; and means for suppressing oscillation of said floating offshore structure, comprising an overhanging member projecting radially outwardly from an outer periphery of a lower end of said tubular body.
Claim 3
Dependent Claim 28 words
A floating offshore structure accoridng to claim 1, wherein said tubular body can be withdrawn from its projecting operative position to a withdrawn position substantially within said hull.
Claim 4
Dependent Claim 65 words
A floating offshore structure according to claim 1, wherein said hull has a mooring hull part for mooring at a fixed position on the sea by means of a mooring hawser having an anchor connected to an end thereof, and a movable hull part rotatably fitted about said moorage hull part, said vertical through-hole being formed in a central part of said moorage hull part.
Claim 5
Dependent Claim 23 words
A floating offshore structure according to claim 3, wherein said movable hull part has a substantially oval horizontal cross-section near its water plane.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1989-02-17 1989-08-19 1990-02-18 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1993-02-17 1993-08-19 1994-02-18 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1997-02-17 1997-08-19 1998-02-18 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag