Method of measuring the distance of a fault on a line taking account of distributed capacitances
Assignee: Safran Data Systems SAS
•
Filing: 1983-05-24
•
Granted: 1986-02-04
•
Expires: 2003-05-24
Abstract
Abstract The invention concerns a method of direct measurement of a parameter characterizing a fault on an electricity line 1, such as the distance x or the resistance R d of the fault, the method being based on Ohm's Law including the line inductance L and the resistances R, R d . The signals respectively associated with the variation of current i(t) and of voltage v(t) at the measuring point M are operated upon by transfer functions the ratio of which is equal to: (2/τ) tan ωτ/2, τ corresponding to the propagation time of a wave over double the distance between the measuring point M and a zone boundary P. The method thus takes into account the distributed capacitances C of the line.
Inventors
- 👤 Isabelle Heller
- 👤 Paul Loewenstein
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-31 10:23
CPC Classifications
G; G01; G01R; G01R31/00; G01R31/08; G01R31/081; G01R31/085; H; H02; H02H; H02H7/00; H02H7/26; H02H7/265
Claims Analysis
Total Claims: 7
Claim 1
Independent Claim
230 words
A method of determining at least the distance between a measuring point and a fault on a line of an electrical transmission network or the resistance of the fault, where the resistance, R, and inductance, L, per unit length of the network are known, comprising the steps of: (a) measuring the voltage and current on the line at the measurement point and generating signals indicative thereof; (b) generating a voltage processing signal related to the voltage indicative signal by a first transfer function, and generating first and second current processing signals respectively related to the current indicative signal by second and third transfer functions, wherein the ratio of the second to the first transfer function is substantially equal to 1 and wherein the ratio of the third to the first transfer function is substantially equal to (2/τ) tan ωτ/2, where τ corresponds to the propagation time of an electric wave over twice the distance separating the measuring point and a reference point on the line, and where ω is the angular frequency of the voltage and current indicative signals; and (c) calculating at least the resistance R d of the fault, or the distance x of the fault from the measurement point, according to the equation: E=(x·R+R.sub.d)·I.sub.1 +(x·L)·I.sub.2 where E is the voltage processing signal, and I 1 and I 2 are respectively the first and second current processing signals.
Claim 2
Independent Claim
230 words
A method of determining at least the distance between a measuring point and a fault on a line of an electrical transmission network or the resistance of the fault, where the resistance, R, and inductance, L, per unit length of the network are known, comprising the steps of: (a) measuring the voltage and current on the line at the measurement point and generating signals indicative thereof; (b) generating a voltage processing signal related to the voltage indicative signal by a first transfer function, and generating first and second current processing signals respectively related to the current indicative signal by second and third transfer functions, wherein the ratio of the second to the first transfer function is substantially equal to 1 and wherein the ratio of the third to the first transfer function is substantially equal to (2/τ) tan ωτ/2, where τ corresponds to the propagation time of an electric wave over twice the distance separating the measuring point and a reference point on the line, and where ω is the angular frequency of the voltage and current indicative signals; and (c) calculating at least the resistance R d of the fault, or the distance x of the fault from the measurement point, according to the equation: E=(x·R+R.sub.d)·I.sub.1 +(x·L)·I.sub.2 where E is the voltage processing signal, and I 1 and I 2 are respectively the first and second current processing signals.
Claim 3
Dependent Claim
69 words
Method according to claim 1, wherein each group of processing signals comprises a pair of voltage processing signals and a first and a second pair of current processing signals, the first respective signals of each pair corresponding to a first measuring instant, the second signals of each pair corresponding to a second measuring instant, and the time interval between the first and second instants corresponding to said propagation time.
Claim 4
Dependent Claim
40 words
Method according to claim 2, wherein said signals of said pair of voltage processing signals are combined as an arithmetic mean to form a signal which is representative of the term of said equation which is equivalent to a voltage.
Claim 5
Dependent Claim
53 words
Method according to claim 2, wherein said signals of said first pair of current processing signals are combined as a difference divided by said propagation time to form a signal which is representative of the term of said equation, equivalent to the time derivation of a current, which is associated with the inductance.
Claim 6
Dependent Claim
44 words
Method according to claim 2, wherein said signals of said second pair of current signals are combined as an arithmetic mean to form a signal which is representative of the term of said equation, equivalent to a current, which is associated with the resistance.
Claim 7
Dependent Claim
35 words
Method according to claim 1, applied to a line divided into zones, wherein said distance separating the measuring point from said reference point on the line is substantially equal to the length of a zone.
References Cited (Backward Citations)
FR1376746A
Cited
US3369156A
Cited
US3593124A
Cited
US3612989A
Cited
FR2057232A5
Cited
US3931502A
Cited
US3983377A
Cited
US4063162A
Cited
US4251766A
Cited
US4325098A
Cited
US4313169A
Cited
EP0053069A1
Cited
US4371907A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1989-02-03 | 1989-08-05 | 1990-02-04 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1993-02-03 | 1993-08-05 | 1994-02-04 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1997-02-03 | 1997-08-05 | 1998-02-04 | $7700.00 | Window Closed / Lapsed |