← Back to Patent Explorer
US4552099A Expired / Lapsed US ⏱️ 0.0 years remaining

Anticipatory boiler feedpump suction head controller system

Assignee: Westinghouse Electric Corp
•
Filing: 1984-10-25
•
Granted: 1985-11-12
•
Expires: 2004-10-25
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Boiler feedpump net positive suction head (NPSH) control is performed in a heat recovery steam generator including a deaerator inserted between steam turbine condensate and steam boiler. To this effect apparatus is provided responsive to temperature at the output of the deaerator, to fluid flow therefrom, and to temperature at the input of the boiler feedpump for providing a signal representative of the anticipated suction head pressure, and the NPSH margin is derived by comparison with actual pressure to control the pegging valve, or other heat source control to the deaerator.

Inventors

  • 👤 Alan Martens
  • 👤 Milton M. Hobbs
  • 👤 Bennie E. Snow

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-07 11:24
CPC Classifications
F; F01; F01K; F01K23/00; F01K23/02; F01K23/06; F01K23/10; F01K23/106; F01K23/108; Y; Y02; Y02E; Y02E20/00; Y02E20/16

Claims Analysis

Total Claims: 8
Claim 1
Independent Claim 163 words
In a steam boiler system including: boiler means having a deaerator comprising a vapor phase section and a liquid phase section for degassing feedwater for said boiler means; a boiler feedpump having an inlet and a suction head associated thereto for pumping degassed feedwater from an outlet of said liquid phase section to said boiler means, the combination of: means for deriving a first signal indicative of the temperature at the inlet of said feedpump; means for deriving a second signal indicative of the temperature at the outlet of said liquid phase section; means for deriving a third signal indicative of water flow from said outlet to said inlet; means for combining said third signal with one of said first and second signals for generating an anticipatory signal representative of the desired pressure in said suction head of said feedpump; and control means responsive to actual pressure in said suction head and to said anticipatory signal for controlling pressure in said suction head.
Claim 2
Dependent Claim 163 words
In a steam boiler system including: boiler means having a deaerator comprising a vapor phase section and a liquid phase section for degassing feedwater for said boiler means; a boiler feedpump having an inlet and a suction head associated thereto for pumping degassed feedwater from an outlet of said liquid phase section to said boiler means, the combination of: means for deriving a first signal indicative of the temperature at the inlet of said feedpump; means for deriving a second signal indicative of the temperature at the outlet of said liquid phase section; means for deriving a third signal indicative of water flow from said outlet to said inlet; means for combining said third signal with one of said first and second signals for generating an anticipatory signal representative of the desired pressure in said suction head of said feedpump; and control means responsive to actual pressure in said suction head and to said anticipatory signal for controlling pressure in said suction head.
Claim 3
Dependent Claim 100 words
The system of claim 1 with said combining means including: high select means for selecting the larger of said first and second signals, first function generator means responsive to said high select means for providing a signal representative of pressure of saturation in relation to temperature indicative signal derived by said high select means; means responsive to said third signal for converting said signal into a signal representative of the net positive suction head (NPSH) characteristic of said feedpump; and summing means for adding said pressure of saturation representative signal and said NPSH characteristic signal to derive said anticipatory signal.
Claim 4
Dependent Claim 19 words
The system of claim 2 with said control means being operative on the supply of heat to said deaerator.
Claim 5
Dependent Claim 54 words
The system of claim 3 with said boiler means including a high pressure evaporator with a steam drum connected thereto and a superheater tubing connected to said steam drum, steam being derived from said steam drum and fed through a pegging valve to said deaerator; said control means being operative on said pegging valve.
Claim 6
Dependent Claim 60 words
The system of claim 2 with subtractor means responsive to actual pressure in said suction head and desired pressure represented by said anticipatory signal for generating a differential pressure characteristic of error; said control means including a second function generator for generating a control signal ramping from maximum control to a predetermined minimum value as a function of increasing error.
Claim 7
Dependent Claim 26 words
The system of claim 5 with said control means being operative to cut back the supply of feedwater to said deaerator when the error is maximum.
Claim 8
Dependent Claim 23 words
The system of claim 5 with said control means being operative to adjust reheat supply to said deaerator when the error is minimum.

References Cited (Backward Citations)

US3166910A Cited
US4207842A Cited
US4290390A Cited
US4497283A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1988-11-11 1989-05-13 1989-11-12 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1992-11-11 1993-05-13 1993-11-12 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1996-11-11 1997-05-13 1997-11-12 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag