Abstract A system is disclosed for increasing the main steam temperature in a boiler/turbine installation to the maximum level consistent with safe operation of the installation. The difference between the main steam temperature and a system parameter is determined and used as an index to adjust the main steam temperature set point upward or downward. The system parameter selected for comparison with the main steam temperature may be the allowable variance between the main steam temperature and the main steam temperature set point or may be a "safety margin" temperature selected so as to be below the maximum allowable temperature for the installation.
Inventors
- 👤 Marion A. Keyes, IV
- 👤 Michael P. Lukas
- 👤 William H. Moss
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-27 13:54
CPC Classifications
F; F22; F22B; F22B35/00; F22G; F22G5/00; F22G5/12
Claims Analysis
Total Claims: 6
Claim 1
Independent Claim
97 words
A system for maximizing the main steam temperature in a power generation boiler/turbine installation comprising means producing an output signal representative of the temperature of the steam entering the turbine, means for comparing said output signal representative of said turbine steam temperature with a maximum safe operating temperature of said boiler/turbine installation, said comparing means producing an output signal representative of the difference between said turbine steam temperature and said maximum safe operating temperature, and means responsive to said difference output signal producing a trim signal to vary a set point for determining said turbine steam temperature.
Claim 2
Independent Claim
97 words
A system for maximizing the main steam temperature in a power generation boiler/turbine installation comprising means producing an output signal representative of the temperature of the steam entering the turbine, means for comparing said output signal representative of said turbine steam temperature with a maximum safe operating temperature of said boiler/turbine installation, said comparing means producing an output signal representative of the difference between said turbine steam temperature and said maximum safe operating temperature, and means responsive to said difference output signal producing a trim signal to vary a set point for determining said turbine steam temperature.
Claim 3
Dependent Claim
37 words
The system as defined in claim 1 wherein said output signal producing means produces a signal representative of the differences between the temperature of the steam entering the turbine and said turbine steam temperature determining set point.
Claim 4
Dependent Claim
35 words
The system as defined in claim 2 wherein said maximum safe operating temperature is representative of the allowable variance between said temperature of the steam entering the turbine and said turbine steam temperature set point.
Claim 5
Dependent Claim
26 words
The system as defined in claim 1 including means to set said trim signal to zero until steady-state operation of the boiler/turbine installation has been achieved.
Claim 6
Dependent Claim
25 words
The system as defined in claim 1 including means to set said trim signal to zero during start-up or load change to the boiler/turbine installation.
References Cited (Backward Citations)
US3172462A
Cited
US3183897A
Cited
US3640250A
Cited
US4144846A
Cited
US4296730A
Cited
US4241701A
Cited
DE3121442A1
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1988-10-28 | 1989-04-29 | 1989-10-29 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1992-10-28 | 1993-04-29 | 1993-10-29 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1996-10-28 | 1997-04-29 | 1997-10-29 | $7700.00 | Window Closed / Lapsed |