Patent EP0592151A1 successfully refreshed from Google Patents.
← Back to Patent Explorer
US4545945A Expired / Lapsed US ⏱️ 0.0 years remaining

Process for improving the gas distribution in air-lift loop reactors

Assignee: Hoechst AG
•
Filing: 1981-12-11
•
Granted: 1985-10-08
•
Expires: 2001-12-11
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract In a process for improving the gas distribution in air-lift loop reactors, the back-flowing, partially degassed liquid is divided into part streams prior to, during or after entry into the rising part of the loop. In this process, the cross-section of the sum of the part streams is intended to be smaller than the free cross-section of the rising part. The gas is passed into the part streams.

Inventors

  • 👤 Paul Prave
  • 👤 Wolfgang Sittig

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-02 22:25
CPC Classifications
C; C12; C12M; C12M29/00; C12M29/06; C12M29/08; F; F27; F27D; F27D99/00; F27D99/0001; F27D99/0006; F27D2099/0025; F27D2099/0031; F27D99/0033; F27D2099/0038; F27D27/00

Claims Analysis

Total Claims: 7
Claim 1
Independent Claim 220 words
A process for improving the gas distribution in air-lift loop reactors of the type in which gas is supplied to a reactor vessel through multiple-outlet gas nozzle means disposed in a lower portion of the vessel and having a predetermined plurality of gas outlets, and a guide device disposed above the gas nozzle means separates liquid in the vessel into an upflow space in which gassed liquid rises to a degassing zone and a downflow space in which partially degassed liquid flows down to below the guide device, the guide device defining a free cross section for the rising gassed liquid in the upflow space; comprising the steps of damming said free cross section of said upflow space with damming means at the location of said gas nozzle means; providing a corresponding predetermined plurality of apertures in said damming means to define part streams at said damming means flowing therethrough into said upflow space, said liquid entering said upflow space only through said apertures with each aperture being associated with a respective one of said gas outlets disposed thereat, and the part streams having cross sections such that the sum of the cross sections of the part streams is less than the free cross section of the upflow space; and introducing gas through said gas outlets into said part streams.
Claim 2
Dependent Claim 220 words
A process for improving the gas distribution in air-lift loop reactors of the type in which gas is supplied to a reactor vessel through multiple-outlet gas nozzle means disposed in a lower portion of the vessel and having a predetermined plurality of gas outlets, and a guide device disposed above the gas nozzle means separates liquid in the vessel into an upflow space in which gassed liquid rises to a degassing zone and a downflow space in which partially degassed liquid flows down to below the guide device, the guide device defining a free cross section for the rising gassed liquid in the upflow space; comprising the steps of damming said free cross section of said upflow space with damming means at the location of said gas nozzle means; providing a corresponding predetermined plurality of apertures in said damming means to define part streams at said damming means flowing therethrough into said upflow space, said liquid entering said upflow space only through said apertures with each aperture being associated with a respective one of said gas outlets disposed thereat, and the part streams having cross sections such that the sum of the cross sections of the part streams is less than the free cross section of the upflow space; and introducing gas through said gas outlets into said part streams.
Claim 3
Dependent Claim 29 words
A process as claimed in claim 1, wherein the sum of the cross-sections of the part streams is 0.05 to 0.8 times the free cross-section of the upflow space.
Claim 4
Dependent Claim 36 words
A process as claimed in either claim 1 or 2, wherein the velocities of the part streams which can be achieved by the effect of the air-lift pump are increased by means supplying additional external energy.
Claim 5
Dependent Claim 23 words
A process as claimed in claims 1 or 2, wherein further components are passed into the part streams at the gas inlet points.
Claim 6
Dependent Claim 33 words
A process as claimed in claim 4, wherein the velocities of the part streams which can be achieved by the effect of the nozzle means are increased by means supplying additional external energy.
Claim 7
Dependent Claim 39 words
A process as claimed in claim 1, wherein said step of passing gas through said gas outlets into said part streams includes introducing the gas into the liquid at a point where the part streams attain their maximum velocity.

References Cited (Backward Citations)

US642460A Cited
US1404701A Cited
FR720884A Cited
US2188192A Cited
US2715521A Cited
US3630848A Cited
US3790141A Cited
US3910826A Cited
US3931370A Cited
SU680753A1 Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1988-10-07 1989-04-08 1989-10-08 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1992-10-07 1993-04-08 1993-10-08 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1996-10-07 1997-04-08 1997-10-08 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag