Claims Analysis
Total Claims: 22
Claim 1
Independent Claim
162 words
A process for the controlled addition of dewatering conditioning polymer material to a sewage sludge to produce a mixture thereof comprising the steps of: (a) measuring with a viscometer in a quantity of the sludge/material mixture the value of the shear stress in the said quantity of the mixture to determine the existence or not of a predetermined maximum in the value of the measured shear stress representing a measured shear stress yield value; (b) in the absence of detection of such a predetermined maximum value increasing the rate of addition of conditioning polymer material to the mixture; (c) upon the detection of such a predetermined maximum value, measuring the rate of subsequent decrease of the measured shear stress immediately following the maximum value; and (d) increasing or decreasing or maintaining the rate of addition of conditioning polymer material respectively as the rate of decrease is less than, or more than, or about equal to a predetermined rate of said subsequent decrease.
Claim 2
Dependent Claim
162 words
A process for the controlled addition of dewatering conditioning polymer material to a sewage sludge to produce a mixture thereof comprising the steps of: (a) measuring with a viscometer in a quantity of the sludge/material mixture the value of the shear stress in the said quantity of the mixture to determine the existence or not of a predetermined maximum in the value of the measured shear stress representing a measured shear stress yield value; (b) in the absence of detection of such a predetermined maximum value increasing the rate of addition of conditioning polymer material to the mixture; (c) upon the detection of such a predetermined maximum value, measuring the rate of subsequent decrease of the measured shear stress immediately following the maximum value; and (d) increasing or decreasing or maintaining the rate of addition of conditioning polymer material respectively as the rate of decrease is less than, or more than, or about equal to a predetermined rate of said subsequent decrease.
Claim 3
Dependent Claim
28 words
Process as claimed in claim 1, wherein the viscometer is of the rotational cylinder type and measures the shear stress at increasing rate of rotation of the cylinder.
Claim 4
Dependent Claim
31 words
Process as claimed in claim 1, wherein the viscometer is of the rotational cylinder type and measures the shear stress at a constant speed of rotation over a period of time.
Claim 5
Dependent Claim
44 words
Process as claimed in claim 1, wherein the incremental rate of increase or decrease of the addition of the conditioning polymer material is adjusted to decrease as the measured shear stress maximum value and the measured rate of subsequent decrease approach the predetermined values.
Claim 6
Dependent Claim
51 words
Process as claimed in claim 1, wherein the time interval between successive viscometer measurements is adjustable to decrease with the incremental rate of decrease of the rate of feed of conditioning polymer material and to increase with the incremental rate of increase of the rate of feed of conditioning polymer material.
Claim 7
Dependent Claim
41 words
Process as claimed in claim 3, wherein the viscometer is of spring loaded rotational cylinder type and the initial portion of the signal obtained therefrom is ignored to avoid variation in the signal caused by loading and unloading of the spring.
Claim 8
Dependent Claim
57 words
Process as claimed in claim 1, including the steps of: (a) obtaining the said quantity of the mixture by withdrawing a sample of mixed sludge and conditioning polymer material to a separate vessel; (b) measuring the shear stress of the sample in the vessel; and (c) thereafter returning the mixture sample to the mixture for subsequent dewatering.
Claim 9
Dependent Claim
143 words
Process as claimed in claim 1, including the steps of: (a) establishing for the measured shear stress of the mixture a set point maximum yield value and a set point slope value; (b) measuring the yield value and the slope value for the said mixture; (c) determining the yield ratio of measured yield value to set point yield value and the slope ratio of measured slope value to set point slope value; (d) increasing the dosage rate of conditioning polymer material if the measured yield value is less than the set point yield value and the measured slope value is less than the set point slope value; or (e) decreasing the dosage rate of conditioning polymer material if the measured yield value is greater than the set point yield value or if the measured slope is greater than the set point slope value.
Claim 10
Dependent Claim
50 words
Process as claimed in claim 8, wherein the incremental rate of increase or decrease of the addition of the conditioning polymer material to the mixture is adjusted to decrease as the measured shear stress maximum value and the measured value of the rate of subsequent decrease approach the predetermined values.
Claim 11
Dependent Claim
73 words
Process as claimed in claim 9, wherein when the yield ratio is less than one the reciprocal of the yield is employed to determine the incremental rate of change of addition of the conditioning polymer material to the mixture, and when the slope ratio is less than one the reciprocal of the slope ratio is employed to determine the incremental rate of change of addition of the conditioning polymer material to the mixture.
Claim 12
Dependent Claim
310 words
Apparatus for the controlled addition of dewatering conditioning polymer material to a sewage sludge to produce a mixture thereof including: (a) pump means including conduit means for supplying a flow of sewage sludge at predetermined rate of flow to a container therefor; (b) controllable pump means including conduit means for supplying a flow of conditioning polymer material at a controlled rate of flow to said container; (c) means for mixing the said flows of sewage sludge and conditioning material to produce a sludge/polymer material mixture; (d) a viscometer insertable into a quantity of the sludge/polymer material mixture for measuring the shear stress of the sludge/material mixture and producing an output electric signal representative thereof; (e) means operative to examine the viscometer output electric signal for the detection of a predetermined maximum value therein representing a measured shear stress yield value; (f) control means responsive to the absence of such detection of a predetermined maximum value signal to control the said controllable pump means to increase the supply of conditioning polymer material to the sludge/polymer material mixture; (g) means operative to examine the viscometer output electric signal upon the detection of said predetermined maximum output value to determine the value of the rate of subsequent decrease of the measured shear stress immediately following the maximum output value; (h) the control means being responsive to the said value of the rate of subsequent decrease of the measured shear stress to control the controllable pump means to increase the supply of conditioning polymer material to the mixture, or to decrease the supply of conditioning polymer material to the mixture, or to maintain the supply of the conditioning polymer material to the mixture at its previous value as the value of the rate of decrease is less than, or more than, or about equal to a predetermined value of the rate of said decrease.
Claim 13
Dependent Claim
310 words
Apparatus for the controlled addition of dewatering conditioning polymer material to a sewage sludge to produce a mixture thereof including: (a) pump means including conduit means for supplying a flow of sewage sludge at predetermined rate of flow to a container therefor; (b) controllable pump means including conduit means for supplying a flow of conditioning polymer material at a controlled rate of flow to said container; (c) means for mixing the said flows of sewage sludge and conditioning material to produce a sludge/polymer material mixture; (d) a viscometer insertable into a quantity of the sludge/polymer material mixture for measuring the shear stress of the sludge/material mixture and producing an output electric signal representative thereof; (e) means operative to examine the viscometer output electric signal for the detection of a predetermined maximum value therein representing a measured shear stress yield value; (f) control means responsive to the absence of such detection of a predetermined maximum value signal to control the said controllable pump means to increase the supply of conditioning polymer material to the sludge/polymer material mixture; (g) means operative to examine the viscometer output electric signal upon the detection of said predetermined maximum output value to determine the value of the rate of subsequent decrease of the measured shear stress immediately following the maximum output value; (h) the control means being responsive to the said value of the rate of subsequent decrease of the measured shear stress to control the controllable pump means to increase the supply of conditioning polymer material to the mixture, or to decrease the supply of conditioning polymer material to the mixture, or to maintain the supply of the conditioning polymer material to the mixture at its previous value as the value of the rate of decrease is less than, or more than, or about equal to a predetermined value of the rate of said decrease.
Claim 14
Dependent Claim
28 words
Apparatus as claimed in claim 11, wherein the viscometer is of the rotational cylinder type and measures the shear stress at increasing rate of rotation of the cylinder.
Claim 15
Dependent Claim
31 words
Apparatus as claimed in claim 11, wherein the viscometer is of the rotational cylinder type and measures the shear stress at a constant speed of rotation over a period of time.
Claim 16
Dependent Claim
60 words
Apparatus as claimed in claim 11, wherein the control means is operative so that the value of the incremental rate of increase or decrease of the addition of the conditioning polymer material to the mixture is adjusted to decrease as the measured shear stress maximum value and the measured value of the rate of subsequent decrease approach the predetermined values.
Claim 17
Dependent Claim
70 words
Apparatus as claimed in claim 11, wherein the control means is operative so that the time interval between successive viscometer measurements is adjustable to decrease with the value of the incremental rate of decrease of the rate of feed of conditioning polymer material to the mixture and to increase with the value of the incremental rate of increase of the rate of feed of conditioning polymer material to the mixture.
Claim 18
Dependent Claim
41 words
Apparatus as claimed in claim 13, wherein the viscometer is of spring loaded rotational cylinder type and the initial portion of the signal obtained therefrom is ignored to avoid variation in the signal caused by loading and unloading of the spring.
Claim 19
Dependent Claim
71 words
Apparatus as claimed in claim 11, including: (a) a sample vessel, and (b) conduit means for withdrawing a sample of mixed sludge and polymer material from the mixture thereof to the sample vessel and for returning the sample to the mixture; the apparatus including means for measuring the shear stress value of the sample in the sample vessel; and means for thereafter returning the sample to the mixture for subsequent dewatering.
Claim 20
Dependent Claim
154 words
Apparatus as claimed in claim 11, further comprising (a) means for establishing for the measured shear stress of the mixture a set point maximum yield value and a set point slope value; (b) means for measuring the yield value and the slope value for the said quantity of mixture; (c) means for determining the yield ratio of measured yield value to set point yield value and the slope ratio of measured slope value to set point slope value; (d) means for increasing the dosage rate of conditioning polymer material if the measured yield value is less than the set point yield value and the measured slope value is less than the set point slope value; or (e) means for decreasing the dosage rate of conditioning polymer material if the measured yield value is greater than the set point yield value or if the measured slope value is greater than the set point slope value.
Claim 21
Dependent Claim
58 words
Apparatus as claimed in claim 18, wherein the control means includes means operative so that the incremental rate of increase or decrease of the addition of the conditioning polymer material to the mixture is adjusted to decrease as the measured shear stress maximum value and the measured value of the rate of subsequent decrease approach the predetermined values.
Claim 22
Dependent Claim
74 words
Apparatus as claimed in claim 19, wherein when the yield ratio is less than one the reciprocal of the yield ratio is employed to determine the incremental rate of change of addition of the conditioning polymer material to the mixture, and when the slope ratio is less than one the reciprocal of the slope ratio is employed to determine the incremental rate of change of addition of the conditioning polymer material to the mixture.