← Back to Patent Explorer
US4528968A Expired / Lapsed US ⏱️ 0.0 years remaining

Duty ratio control method for on-off type solenoid valves

Assignee: Honda Motor Co Ltd
•
Filing: 1984-06-22
•
Granted: 1985-07-16
•
Expires: 2004-06-22
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A valve opening duty ratio determining the valve opening period of an on-off type solenoid valve is calculated as a function of at least one control parameter, each time a pulse of a predetermined timing signal is generated. A valve closing duty ratio determining the valve closing period of the solenoid valve is calculated when the calculated valve opening duty ratio is larger than a predetermined value. A pulse of a reference control signal is generated after completion of the calculation of the valve opening duty ratio or the valve closing duty ratio. Time elapsed after generation of the reference control signal pulse is measured. When the calculated valve opening duty ratio is smaller than a predetermined value, the solenoid valve is opened for a period of time after generation of the above reference control signal pulse and until the elapsed time measured reaches a value corresponding to the calculated valve opening duty ratio. When the calculated valve opening duty ratio is larger than the predetermined value, the valve is closed for a period of time after generation of the reference control signal pulse and until the elapsed time measured reaches a value corresponding to the calculated valve closing duty ratio.

Inventors

  • 👤 Yutaka Otobe

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-31 06:21
CPC Classifications
F; F02; F02D; F02D41/00; F02D41/0025; F02D41/0047; F02D41/0077; F02D41/20; G; G05; G05D; G05D7/00; G05D7/06; F02D11/00; F02D11/06; F02D11/10; F02D2011/101; F02D2011/102; F02D2041/2017; F02D2041/202; F02D2041/2024; F02D2041/2027; Y; Y02; Y02T; Y02T10/00; Y02T10/10; Y02T10/40

Claims Analysis

Total Claims: 7
Claim 1
Independent Claim 266 words
A method for controlling an on-off type solenoid valve, comprising the steps of: (1) calculating a valve opening duty ratio determining the valve opening period of said solenoid valve, as a function of at least one control parameter, each time a pulse of a predetermined timing signal is generated; (2) comparing the valve opening duty ratio calculated in said step (1) with a predetermined value; (3) calculating a valve closing duty ratio determining the valve closing period of said solenoid valve when the calculated valve opening duty ratio is larger than said predetermined value; (4) generating a pulse of a reference control signal after completion of either said calculation of the valve opening duty ratio in said step (1) or said calculation of the valve closing duty ratio in said step (3); (5) measuring time elapsed after generation of said pulse of said reference control signal; (6) causing said solenoid valve to open for a period of time after generation of said pulse of said reference control signal and until the elapsed time measured in said step (5) reaches a value corresponding to the valve opening duty ratio calculated in said step (1), when the calculated valve opening duty ratio is smaller than said predetermined value; (7) causing said solenoid valve to close for a period of time after generation of said pulse of said reference control signal and until the elapsed time measured in said step (5) reaches a value corresponding to the valve closing duty ratio calculated in said step (3), when the calculated valve opening duty ratio is larger than said predetermined value.
Claim 2
Independent Claim 266 words
A method for controlling an on-off type solenoid valve, comprising the steps of: (1) calculating a valve opening duty ratio determining the valve opening period of said solenoid valve, as a function of at least one control parameter, each time a pulse of a predetermined timing signal is generated; (2) comparing the valve opening duty ratio calculated in said step (1) with a predetermined value; (3) calculating a valve closing duty ratio determining the valve closing period of said solenoid valve when the calculated valve opening duty ratio is larger than said predetermined value; (4) generating a pulse of a reference control signal after completion of either said calculation of the valve opening duty ratio in said step (1) or said calculation of the valve closing duty ratio in said step (3); (5) measuring time elapsed after generation of said pulse of said reference control signal; (6) causing said solenoid valve to open for a period of time after generation of said pulse of said reference control signal and until the elapsed time measured in said step (5) reaches a value corresponding to the valve opening duty ratio calculated in said step (1), when the calculated valve opening duty ratio is smaller than said predetermined value; (7) causing said solenoid valve to close for a period of time after generation of said pulse of said reference control signal and until the elapsed time measured in said step (5) reaches a value corresponding to the valve closing duty ratio calculated in said step (3), when the calculated valve opening duty ratio is larger than said predetermined value.
Claim 3
Dependent Claim 60 words
A method as claimed in claim 1, wherein said step (6) includes causing said solenoid valve to close for a period of time after the elapsed time measured in the step (5) reaches said value corresponding to said calculated valve opening duty ratio and until a pulse of said reference control signal immediately following said first-mentioned pulse thereof is generated.
Claim 4
Dependent Claim 60 words
A method as claimed in claim 1, wherein said step (7) includes causing said solenoid valve to open for a period of time after the elapsed time measured in the step (5) reaches said value corresponding to said calculated valve closing duty ratio and until a pulse of said reference control signal immediately following said first-mentioned pulse thereof is generated.
Claim 5
Dependent Claim 36 words
A method as claimed in claim 1, wherein said calculation of the valve closing duty ratio of the step (3) is effected on the basis of the valve opening duty ratio calculated in the step (1).
Claim 6
Dependent Claim 100 words
A method as claimed in claim 1, further including the step of executing a process for control of a controlling means other than said on-off type solenoid valve, in synchronism with generation of a predetermined interrupt signal, and wherein if said interrupt signal is generated to command execution of the process for control of said other controlling means when said calculation of the valve opening duty ratio of the step (1) is to be executed, the process for control of said other controlling means is executed preferentially to said calculation of the valve opening duty ratio of the step (1).
Claim 7
Independent Claim 43 words
A method as claimed in any of claims 1 through 5, wherein said on-off type solenoid valve includes a solenoid valve used in a control means for controlling the amount of exhaust gas recirculated to an intake pipe of an internal combustion engine.

References Cited (Backward Citations)

US4173205A Cited
US4164206A Cited
US4233947A Cited
JPS5582302A Cited
US4462378A Cited
US4380988A Cited
US4452217A Cited
US4448177A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1988-07-15 1989-01-14 1989-07-16 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1992-07-15 1993-01-14 1993-07-16 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1996-07-15 1997-01-14 1997-07-16 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag