← Back to Patent Explorer
US4526311A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for carrying out repair, maintenance or testing apparatus, components and the like in hot cells

Assignee: DEUTSCHE GESELLSCHAFT ETC
•
Filing: 1982-09-22
•
Granted: 1985-07-02
•
Expires: 2002-09-22
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method and apparatus are disclosed for carrying out repair, maintenance or testing of apparatus, components and the like in hot cells, more particularly hot cells of reprocessing plants for spent nuclear fuels. The position of damage zones is detected and ascertained with the use of coordinates. Replacement parts and tools are moved into the maintenance and work position in dependence upon the coordinate data, and the repair or maintenance work is automatically carried out under computer control, with remote operation and remote monitoring. For carrying out the work, computer-controlled handling machines and manipulators are used which are adapted to travel in controllable manner in the hot cell. The monitoring and detecting, using coordinates, of damage zones and defects may be carried out with the use of cameras and/or leak detectors.

Inventors

  • 👤 Gunter Schroder

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-25 07:10
CPC Classifications
B; B25; B25J; B25J5/00; B25J5/02; B25J5/04; B25J21/00; B25J9/00; B25J9/0084; G; G21; G21F; G21F7/00; G21F7/06; Y; Y10; Y10S; Y10S29/00; Y10S29/048; Y10T; Y10T29/00; Y10T29/49; Y10T29/49718; Y10T29/49721; Y10T29/4973; Y10T29/49732; Y10T29/49734; Y10T29/49737; Y10T29/49764; Y10T29/49769; Y10T29/53; Y10T29/531

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 201 words
A method of carrying out repair, maintenance or testing of conduit in a hot cell using a handling machine, machine tool, general tool, replacement part, working material or testing device, provided for such a purpose in the hot cell, comprising the following steps in combination: a. substantially continuously remotely monitoring the conduit for damage or a defect using remotely operable television cameras and/or leak detectors to detect the damage or defect, b. ascertaining the coordinates of the damage or defect by means of a computer, c. selecting an appropriate handling machine, machine tool, general tool, replacement part, working material or testing device; d. moving the selected handling machine, machine tool, general tool, replacement part, working material or testing device into a servicing position determined by the ascertained coordinates; and e. remotely operating and monitoring by means of the computer the selected handling machine, machine tool, general tool, replacement part, working material or testing device wherein said operating step comprises the following sub-steps: i. detaching the defective conduit part; ii. aligning the remaining two free conduit ends with one another; iii. aligning a replacement conduit part with the two free ends; and iv. welding the replacement conduit part to the free ends.
Claim 2
Independent Claim 201 words
A method of carrying out repair, maintenance or testing of conduit in a hot cell using a handling machine, machine tool, general tool, replacement part, working material or testing device, provided for such a purpose in the hot cell, comprising the following steps in combination: a. substantially continuously remotely monitoring the conduit for damage or a defect using remotely operable television cameras and/or leak detectors to detect the damage or defect, b. ascertaining the coordinates of the damage or defect by means of a computer, c. selecting an appropriate handling machine, machine tool, general tool, replacement part, working material or testing device; d. moving the selected handling machine, machine tool, general tool, replacement part, working material or testing device into a servicing position determined by the ascertained coordinates; and e. remotely operating and monitoring by means of the computer the selected handling machine, machine tool, general tool, replacement part, working material or testing device wherein said operating step comprises the following sub-steps: i. detaching the defective conduit part; ii. aligning the remaining two free conduit ends with one another; iii. aligning a replacement conduit part with the two free ends; and iv. welding the replacement conduit part to the free ends.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1988-07-01 1988-12-31 1989-07-02 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1992-07-01 1992-12-31 1993-07-02 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1996-07-01 1996-12-31 1997-07-02 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag