Abstract

Abstract The present invention is directed to a method of installing an erosion-preventing lightweight, semi-permeable, semi-flexible structure in the form of a dike for erosion control of a bank along a body of water. The method comprises the excavation of hydraulically placed silty or clay-containing sand fill or existing silty or clay-containing beach sands to form a trench and the placing of a synthetic woven fabric at the base of the excavation. A mixture of shell, sand and cement is then formed and placed in the excavated trench and compacted therein in layers to construct a dike. After covering the dike with a porous synthetic fabric, rock-filled gabions are then placed on the water-side face and crest of the dike.

Inventors

  • 👤 Samlal Nandlal

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-03 14:22
CPC Classifications
E; E02; E02B; E02B3/00; E02B3/04; E02B3/10; Y; Y02; Y02A; Y02A10/00; Y02A10/11

Claims Analysis

Total Claims: 15
Claim 1
Independent Claim 219 words
A method of installing an erosion-preventing lightweight, semi-permeable, semi-flexible structure in the form of a dike for erosion control of a bank along a body of water, excavating a trench on the land forming a bank along a body of water, covering the trench and at least the trench wall toward the water with a first woven synthetic permeable flexible fabric to form a trench cover to separate dike building material from the trench subsoil and to inhibit the migration of fines into the underlying soils, mixing shells, sand and cement together to form the necessary volume of dike construction material, spreading a series of shallow layers of said shell-sand-cement mixture of dike material in the trench, compacting the shell-sand-cement mixture between layers above the water level prior to adding another layer, repeating the steps of adding and compacting additional layers of dike material until the crest elevation and at least the selected water-side slope of the dike has been attained, covering the crest and the water-side slope of the dike with a second synthetic flexible fabric to form a dike cover permeable to water and impermeable to substantially all of the fine solid material in the shell-sand-cement mixture, and anchoring to at least the top and water-side slope of the dike said second synthetic flexible fabric dike cover.
Claim 2
Independent Claim 219 words
A method of installing an erosion-preventing lightweight, semi-permeable, semi-flexible structure in the form of a dike for erosion control of a bank along a body of water, excavating a trench on the land forming a bank along a body of water, covering the trench and at least the trench wall toward the water with a first woven synthetic permeable flexible fabric to form a trench cover to separate dike building material from the trench subsoil and to inhibit the migration of fines into the underlying soils, mixing shells, sand and cement together to form the necessary volume of dike construction material, spreading a series of shallow layers of said shell-sand-cement mixture of dike material in the trench, compacting the shell-sand-cement mixture between layers above the water level prior to adding another layer, repeating the steps of adding and compacting additional layers of dike material until the crest elevation and at least the selected water-side slope of the dike has been attained, covering the crest and the water-side slope of the dike with a second synthetic flexible fabric to form a dike cover permeable to water and impermeable to substantially all of the fine solid material in the shell-sand-cement mixture, and anchoring to at least the top and water-side slope of the dike said second synthetic flexible fabric dike cover.
Claim 3
Dependent Claim 28 words
The method of claim 1 wherein the step of anchoring the second synthetic fabric cover to the dike includes covering the fabric cover with a layer of rock.
Claim 4
Dependent Claim 37 words
The method of claim 1 wherein the step of anchoring the second synthetic fabric cover includes weighting the fabric cover with a layer of rock-filled gabions on at least the top and water-side slope of the dike.
Claim 5
Dependent Claim 28 words
The method of claim 3 including positioning at least a row of rock-filled gabions at the base of and in front of the dike on the water side.
Claim 6
Dependent Claim 27 words
The method of claim 1 wherein the trench being excavated has a width of from between 2 and 5 times the height of the dike being constructed.
Claim 7
Dependent Claim 45 words
The method of claim 1 including the step of removing the material from the trench during the excavating step and piling it on the water side and away from the trench to form a temporary breakwater in the water along the length of the trench.
Claim 8
Dependent Claim 88 words
The method of claim 1 wherein covering the trench and trench wall with said first woven synthetic permeable flexible fabric includes the steps of cutting strips of the fabric in lengths sufficient to cover the width of the trench and the trench wall, placing each strip across the trench and up the wall, repeating the operation with successive strips of fabric to cover the entire length of the trench, and overlapping the edges of adjacent strips of fabric throughout their length when they are in a side-by-side manner.
Claim 9
Dependent Claim 54 words
The method of claim 7 including the step of extending said first fabric out of said trench on the water-side thereof to cover a strip of earth along the water side of said trench and anchoring the leading edge of the fabric to the ground on the water side of and outside said trench.
Claim 10
Dependent Claim 97 words
The method of claim 1 including the steps of forming a pair of shallow anchor trenches in the bottom of the excavated trench, said anchor trenches being spaced apart and being formed on opposite sides of the excavated trench substantially at the side walls thereof extending said trench cover fabric into said anchor trenches and out of the anchor trench on the water side and up the slope of the side of the trench on the water side, and anchoring said trench cover fabric in said shallow anchor trenches prior to building the dike in the trench.
Claim 11
Dependent Claim 75 words
The method of claim 1 wherein the step of mixing shells, sand and cement together to form a dike construction mixture comprises the steps of mixing a cubic yard of shell and sand comprising 0.75 cubic yard plus or minus 10% of shell with 0.25 cubic yard minus or plus 10% sand, and admixing 1.5 to 2.5 sacks of cement with each cubic yard of shell-sand mixture to form a substantially dry flowable shell-sand-cement mixture.
Claim 12
Dependent Claim 28 words
The method of claim 1 including the step of excavating the trench to a depth of from mean water level to about five feet below mean water level.
Claim 13
Dependent Claim 29 words
The method of claim 3 including the step of connecting the gabions to any adjacent gabions to form a layer of rock anchored against movement in metallic mesh containers.
Claim 14
Dependent Claim 80 words
The method of claim 1 wherein covering the crest and water-side slope of the dike comprises the steps of cutting strips of the second fabric in lengths sufficient to extend up the water-side slope and across the crest of the dike, placing the strips on and across the dike in side-by-side arrangement, repeating the operation with successive strips of fabric to cover the entire length of compacted material forming the dike, and connecting the adjacent edges of the strips together.
Claim 15
Dependent Claim 79 words
The method of claim 1 wherein the anchoring operation comprises the steps of covering at least the top and water-side slope of the dike with open-topped gabions of metal mesh arranged in side-by-side relationship, connecting all of the gabions together at abutting surfaces to form a unitary gabion structure covering the fabric dike cover, filling the gabions with rock of a size larger than the mesh of the gabions, and closing the tops of the gabions with metal mesh.

References Cited (Backward Citations)

US1879430A Cited
US3680319A Cited
CA968726A Cited
US4184786A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1988-06-03 1988-12-03 1989-06-04 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1992-06-03 1992-12-03 1993-06-04 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1996-06-03 1996-12-03 1997-06-04 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag