← Back to Patent Explorer
US4507860A Expired / Lapsed US ⏱️ 0.0 years remaining

Production line for graphite nipples

Assignee: SGL Carbon SE
•
Filing: 1982-12-02
•
Granted: 1985-04-02
•
Expires: 2002-12-02
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Manufacture of tapered thread nipples of cylindrical graphite sections in a production line with a rotary-cycle machine with stations and a turntable rotated at a predetermined period to move from one station to another. Prismatic guides radially connected to turntable to receive sections. A boring mill above the second station for drilling blind holes into the sections. Filing nozzles above the third station for filling the blind holes with binder. A tie-rod to remove the section from the fourth station. A turning machine for cutting free the binder filled holes.

Inventors

  • 👤 Adolf Sigmund

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-03 06:46
CPC Classifications
H; H05; H05B; H05B7/00; H05B7/02; H05B7/14; Y; Y02; Y02P; Y02P10/00; Y02P10/25; Y10; Y10T; Y10T29/00; Y10T29/49; Y10T29/49002; Y10T29/49117; Y10T408/00; Y10T408/36; Y10T408/38; Y10T408/3806; Y10T408/3809; Y10T408/381

Claims Analysis

Total Claims: 11
Claim 1
Independent Claim 469 words
Production line for manufacturing tapered thread nipples of cylindrical graphite sections, through which the graphite sections are moved, comprising a support means, cutting means located on said support means for cutting to length a graphite rod into cylindrical graphite sections, means on said support means located downstream from said cutting means, for facing off a curved surface layer of each of the graphite sections for cutting free binder filled holes, drilling means located on said support means and downstream from said facing off means to form storage holes in the graphite section, thermoplastic binder means located on said support means and operatively connected to said storage holes for filling the storage holes with thermoplastic binder, and threading means located downstream from said thermoplastic binder means for forming a screw thread in the surface of the graphite section, in combination with a rotary-cycle machine located on said support and having a plurality of stations and a turntable rotatable at a predetermined rate movable from one station to another station, prismatic guides radially connected to the turntable for receiving the graphite sections and respective stops movable in the radial direction of said turntable, a push rod located on said support means and operatively associated with a first station of said rotary-cycle machine, said rod periodically acting in the radial direction of said machine to transfer a graphite section onto one of the prismatic guides at the first station, clamping levers linked to the turntable to act on graphite sections supported in the prismatic guides in a region of a second station and a third station of said machine, a boring mill supported on said support means and operatively associated with the second station, said boring mill having at least two drilling spindles which can be moved relative to one another and can be moved in a vertical direction for drilling blind holes into the graphite sections, at least two filling nozzles supported on said support means and located above a third station of said machine, movable relative to each other and in a vertical direction for filling the blind holes with the binder each of said nozzles being connectable to a heatable pipe line with said pipe line being controllable by a control dosing pump with said dosing pump being operatively associated with a heatable binder supply tank, a tie rod supported on said support means and operatively associated with a fourth station of said machine which periodically engages said fourth and is movable in the radial direction of said machine to remove the graphite section from the prismatic guide at the fourth station of the turntable, a turning means supported on support means operatively associated with said machine and located in the production line after removal of the graphite section from the turntable for cutting free the binder filled holes.
Claim 2
Dependent Claim 469 words
Production line for manufacturing tapered thread nipples of cylindrical graphite sections, through which the graphite sections are moved, comprising a support means, cutting means located on said support means for cutting to length a graphite rod into cylindrical graphite sections, means on said support means located downstream from said cutting means, for facing off a curved surface layer of each of the graphite sections for cutting free binder filled holes, drilling means located on said support means and downstream from said facing off means to form storage holes in the graphite section, thermoplastic binder means located on said support means and operatively connected to said storage holes for filling the storage holes with thermoplastic binder, and threading means located downstream from said thermoplastic binder means for forming a screw thread in the surface of the graphite section, in combination with a rotary-cycle machine located on said support and having a plurality of stations and a turntable rotatable at a predetermined rate movable from one station to another station, prismatic guides radially connected to the turntable for receiving the graphite sections and respective stops movable in the radial direction of said turntable, a push rod located on said support means and operatively associated with a first station of said rotary-cycle machine, said rod periodically acting in the radial direction of said machine to transfer a graphite section onto one of the prismatic guides at the first station, clamping levers linked to the turntable to act on graphite sections supported in the prismatic guides in a region of a second station and a third station of said machine, a boring mill supported on said support means and operatively associated with the second station, said boring mill having at least two drilling spindles which can be moved relative to one another and can be moved in a vertical direction for drilling blind holes into the graphite sections, at least two filling nozzles supported on said support means and located above a third station of said machine, movable relative to each other and in a vertical direction for filling the blind holes with the binder each of said nozzles being connectable to a heatable pipe line with said pipe line being controllable by a control dosing pump with said dosing pump being operatively associated with a heatable binder supply tank, a tie rod supported on said support means and operatively associated with a fourth station of said machine which periodically engages said fourth and is movable in the radial direction of said machine to remove the graphite section from the prismatic guide at the fourth station of the turntable, a turning means supported on support means operatively associated with said machine and located in the production line after removal of the graphite section from the turntable for cutting free the binder filled holes.
Claim 3
Dependent Claim 15 words
Production line according to claim 1, wherein the drilling spindles have a tooth-like cutting edge.
Claim 4
Dependent Claim 19 words
Production line according to claim 1, wherein the drilling spindles are tubular and are connected to a compressed-gas supply.
Claim 5
Dependent Claim 19 words
Production line according to claim 2, wherein the drilling spindles are tubular and are connected to a compressed-gas supply.
Claim 6
Dependent Claim 15 words
Production line according to claim 1, wherein the dosing pumps are piston pumps without valves.
Claim 7
Dependent Claim 15 words
Production line according to claim 3, wherein the dosing pumps are piston pumps without valves.
Claim 8
Dependent Claim 30 words
Production line according to claim 1 including means operatively associated with the spindles and is used for stopping the spindles and then drawing the spindles out of the blind holes.
Claim 9
Dependent Claim 30 words
Production line according to claim 2, including means operatively associated with the spindles and is used for stopping the spindles and then drawing the spindles out of the blind holes.
Claim 10
Dependent Claim 35 words
Production line according to claim 7, including means operatively associated with the graphite sections and is used for filling the blind holes with binder and, after the latter has cooled down, replenishing any shrinkage loss.
Claim 11
Dependent Claim 35 words
Production line according to claim 8, including means operatively associated with the graphite sections and is used for filling the blind holes with binder and, after the latter has cooled down, replenishing any shrinkage loss.

References Cited (Backward Citations)

US3084419A Cited
US3550270A Cited
US3618204A Cited
US3761191A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1988-04-01 1988-10-01 1989-04-02 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1992-04-01 1992-10-01 1993-04-02 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1996-04-01 1996-10-01 1997-04-02 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag