← Back to Patent Explorer
US4498536A Expired / Lapsed US ⏱️ 0.0 years remaining

Method of washing, injecting swabbing or flow testing subterranean wells

Assignee: Baker Hughes Oilfield Operations LLC
•
Filing: 1983-10-03
•
Granted: 1985-02-12
•
Expires: 2003-10-03
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method of chemical injection and of swabbing and/or flow testing a subterranean well by interconnecting a resettable packer and a circulating wash tool so that the packer may be positioned and set in the casing at a plurality of positions above the casing perforations. The introduction of pressurized chemical solution through the tubular work string produces an injection of the chemical solution into the perforations isolated by the vertically spaced annular sealing elements conventionally provided on the wash tool. Following the chemical treatment, the wash tool can be moved to a position above the perforations and a swab test run to measure the productive capabilities of the treated formation, all with a single trip of the wash tool and associated packer into the well.

Inventors

  • 👤 Richard J. Ross
  • 👤 David J. Speller

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-25 14:19
CPC Classifications
E; E21; E21B; E21B49/00; E21B49/08; E21B49/087; E21B33/00; E21B33/10; E21B33/12; E21B33/124; E21B37/00; E21B37/08; E21B43/00; E21B43/25

Claims Analysis

Total Claims: 6
Claim 1
Independent Claim 226 words
The method of chemical treatment and testing of the formation in a production zone adjacent to the well casing perforations by a single trip of a tubing string into the well comprising the steps of: 1. Assembling a circulating washer tool in series relation to a tubing carried resettable packer, said washer having a pair of vertically spaced packing elements expandable by tubing applied fluid pressure into sealing engagement with the casing bore to isolate an axially extending group of perforations; 2. Inserting the assembled washer, packer and tubing string into the well until the expandable packing elements on the washer straddle a selected group of casing perforations and the packer is positioned above all of the casing perforations; 3. Setting the packer to isolate the casing annulus below the packer from the surface; 4. Applying pressurized chemical treatment fluid down the tubing string to expand the expandable packing elements on the washer into sealing engagement with the casing bore and injecting said pressurized chemical treatment fluid into the formation adjacent the isolated casing perforations; 5. Reducing the tubing pressure; 6. Unsetting the packer and moving the washer adjacent a second set of casing perforations; 7. Repeating steps 3 and 4 to successively treat substantially all portions of the formation adjacent the perforations; 8. Reducing the tubing string fluid pressure to retract the washer packing elements;
Claim 2
Independent Claim 226 words
The method of chemical treatment and testing of the formation in a production zone adjacent to the well casing perforations by a single trip of a tubing string into the well comprising the steps of: 1. Assembling a circulating washer tool in series relation to a tubing carried resettable packer, said washer having a pair of vertically spaced packing elements expandable by tubing applied fluid pressure into sealing engagement with the casing bore to isolate an axially extending group of perforations; 2. Inserting the assembled washer, packer and tubing string into the well until the expandable packing elements on the washer straddle a selected group of casing perforations and the packer is positioned above all of the casing perforations; 3. Setting the packer to isolate the casing annulus below the packer from the surface; 4. Applying pressurized chemical treatment fluid down the tubing string to expand the expandable packing elements on the washer into sealing engagement with the casing bore and injecting said pressurized chemical treatment fluid into the formation adjacent the isolated casing perforations; 5. Reducing the tubing pressure; 6. Unsetting the packer and moving the washer adjacent a second set of casing perforations; 7. Repeating steps 3 and 4 to successively treat substantially all portions of the formation adjacent the perforations; 8. Reducing the tubing string fluid pressure to retract the washer packing elements;
Claim 3
Dependent Claim 28 words
Unsetting the packer and moving the entire assembly above the perforations and resetting the packer; and 10. Performing a test to indicate the production flow into the washer.
Claim 4
Dependent Claim 28 words
Unsetting the packer and moving the entire assembly above the perforations and resetting the packer; and 10. Performing a test to indicate the production flow into the washer.
Claim 5
Dependent Claim 21 words
The method of claim 1 wherein the test performed comprises swab testing the production flow into the tubing through the washer.
Claim 6
Dependent Claim 21 words
The method of claim 1 wherein the test performed comprises flow testing the production into the tubing string through the washer.

References Cited (Backward Citations)

US2318167A Cited
US3861465A Cited
US4279306A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1988-02-12 1988-08-13 1989-02-12 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1992-02-12 1992-08-13 1993-02-12 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1996-02-12 1996-08-13 1997-02-12 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag