US4480753A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Metal detector apparatus and method
Assignee: METAL DETECTORS Inc
•
Filing: 1979-07-12
•
Granted: 1984-11-06
•
Expires: 1999-07-12
Abstract
Abstract A metal detector system which includes an electromagnetic search coil, a gate for diverting portions of a material stream containing metal detected by the search coil to a reject container, and a coupling for isolating vibrations caused by the gate from the search coil. The metal detector system also includes control circuitry for automatically recycling the gate when an obstruction prevents the gate from returning to its normal standby position. A test circuit is provided to test the search coil by closing a conductive loop passing through the electromagnetic field of the search coil.
Inventors
- 👤 Joe P. Thomas
- 👤 Charles D. Rogers
- 👤 Richard R. Noll
- 👤 Harry E. Peltzer
- 👤 Steven P. Perrine
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-08 15:36
CPC Classifications
B; B07; B07C; B07C5/00; B07C5/34; B07C5/344; B07C2501/00; B07C2501/0036
Claims Analysis
Total Claims: 10
Claim 1
Independent Claim
112 words
In a metal detector apparatus including an electromagnetic search coil disposed to detect metal in a material stream falling through said search coil and a reject means responsive to said search coil for cycling a gate from a standby position outside the path of said falling material stream to a reject position wherein said gate diverts said material stream from said path, and subsequently back to said standby position, the improvement comprising: means for sensing the presence of said gate in said standby position; and means, responsive to said gate being absent from said standby position longer than a predetermined period of time, for inducing said reject means to cycle said gate.
Claim 2
Dependent Claim
112 words
In a metal detector apparatus including an electromagnetic search coil disposed to detect metal in a material stream falling through said search coil and a reject means responsive to said search coil for cycling a gate from a standby position outside the path of said falling material stream to a reject position wherein said gate diverts said material stream from said path, and subsequently back to said standby position, the improvement comprising: means for sensing the presence of said gate in said standby position; and means, responsive to said gate being absent from said standby position longer than a predetermined period of time, for inducing said reject means to cycle said gate.
Claim 3
Dependent Claim
36 words
The apparatus of claim 1, wherein said means for inducing said reject means to cycle said gate comprises a means for closing a conductive loop positioned to pass through the electromagnetic field of said search coil.
Claim 4
Dependent Claim
18 words
The apparatus of claim 2 wherein said conductive loop includes a coil mounted adjacent to said search coil.
Claim 5
Dependent Claim
49 words
The apparatus of claim 1 further comprising a conduit means for substantially enclosing said material stream and said gate; and a coupling means in said conduit means located between said search coil and said gate for isolating said search coil from vibrations caused by operation of said reject means.
Claim 6
Dependent Claim
30 words
The apparatus of claim 1 further comprising a means for adjusting the speed at which said reject means moves said gate from said reject position back to said standby position.
Claim 7
Dependent Claim
91 words
In a method of detecting metal in a material stream including passing said stream through an electromagnetic search coil, and, responsive to detection of metal by said search coil cycling a gate from a standby position to a reject position, to divert said material stream to a reject container, and back to said standby position, the improvement comprising the steps of: sensing the presence of said gate in said standby position; and responsive to said gate being absent from standby position longer than a predetermined period of time, cycling said gate.
Claim 8
Dependent Claim
91 words
In a method of detecting metal in a material stream including passing said stream through an electromagnetic search coil, and, responsive to detection of metal by said search coil cycling a gate from a standby position to a reject position, to divert said material stream to a reject container, and back to said standby position, the improvement comprising the steps of: sensing the presence of said gate in said standby position; and responsive to said gate being absent from standby position longer than a predetermined period of time, cycling said gate.
Claim 9
Dependent Claim
111 words
In a metal detector apparatus including an electromagnetic search coil disposed to detect metal in a material stream passing through said search coil and a reject means responsive to said search coil for cycling a gate from a standby position outside the path of said material stream to a reject position wherein said gate diverts said material stream from said path, and subsequently back to said standby position, the improvement comprising: means for sensing the presence of said gate in said standby position; and means, responsive to said gate being absent from said standby position longer than a prdetermined period of time, for inducing said reject means to cycle said gate.
Claim 10
Dependent Claim
111 words
In a metal detector apparatus including an electromagnetic search coil disposed to detect metal in a material stream passing through said search coil and a reject means responsive to said search coil for cycling a gate from a standby position outside the path of said material stream to a reject position wherein said gate diverts said material stream from said path, and subsequently back to said standby position, the improvement comprising: means for sensing the presence of said gate in said standby position; and means, responsive to said gate being absent from said standby position longer than a prdetermined period of time, for inducing said reject means to cycle said gate.
References Cited (Backward Citations)
US833708A
Cited
US1407211A
Cited
US2062545A
Cited
US2237254A
Cited
US2419750A
Cited
US2765894A
Cited
US3006472A
Cited
US3110401A
Cited
US3283899A
Cited
US3276164A
Cited
US3467254A
Cited
US4020973A
Cited
US4142636A
Cited
US4171262A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1987-11-06 | 1988-05-07 | 1988-11-06 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1991-11-06 | 1992-05-07 | 1992-11-06 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1995-11-06 | 1996-05-07 | 1996-11-06 | $7700.00 | Window Closed / Lapsed |