US4475386A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Borehole gravimetry system
Assignee: Mobil Oil AS
•
Filing: 1983-06-06
•
Granted: 1984-10-09
•
Expires: 2003-06-06
Abstract
Abstract A borehole gravimety system employs a pair of pressure transducers for lowering into a borehole along with a borehole gravity meter. The pressure transducers are spaced apart vertically within a pressure sonde for producing a pressure differential measurement of the wellbore fluid. A pressure differential measurement and a gravity reading is taken for each of a plurality of vertical locations within the borehole as the borehole gravimetry system is advanced through the borehole.
Inventors
- 👤 John L. Fitch
- 👤 W. D. Lyle
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-29 04:57
CPC Classifications
E; E21; E21B; E21B49/00; E21B47/00; E21B47/06; G; G01; G01V; G01V7/00; G01V7/16
Claims Analysis
Total Claims: 11
Claim 1
Independent Claim
133 words
A method for conducting a gravimetry survey of subsurface formations surrounding a borehole comprising the steps of: (a) traversing a borehole with a borehole gravity meter, (b) simultaneously traversing the borehole with a pair of pressure transducers located at spaced apart positions along the axis of said borehole and in fixed axial relationship with said borehole gravity meter, (c) periodically stopping the traverse of said borehole gravity meter and said pair of pressure transducers to take borehole gravity and borehole fluid pressure measurements at a plurality of measurement locations within the borehole, (d) utilizing the pair of pressure measurements at a first of said measurement locations and the pair of pressure measurements at a second of said measurement locations to determine the distance along the borehole between said first and second measurement locations.
Claim 2
Independent Claim
133 words
A method for conducting a gravimetry survey of subsurface formations surrounding a borehole comprising the steps of: (a) traversing a borehole with a borehole gravity meter, (b) simultaneously traversing the borehole with a pair of pressure transducers located at spaced apart positions along the axis of said borehole and in fixed axial relationship with said borehole gravity meter, (c) periodically stopping the traverse of said borehole gravity meter and said pair of pressure transducers to take borehole gravity and borehole fluid pressure measurements at a plurality of measurement locations within the borehole, (d) utilizing the pair of pressure measurements at a first of said measurement locations and the pair of pressure measurements at a second of said measurement locations to determine the distance along the borehole between said first and second measurement locations.
Claim 3
Dependent Claim
89 words
The method of claim 1 wherein the step of utilizing the pair of pressure measurements taken at each measurement location to determine the distance along the borehole between measurement locations is carried out in accordance with the following expression: ##EQU34## where, ΔZ=distance between measurement locations, D=distance between the pair of pressure transducers, P 0 and P 1 =pressure measurements from the pair of pressure transducers at a first measurement location; and P 2 and P 3 =pressure measurements from the pair of pressure transducers at a second measurement location.
Claim 4
Dependent Claim
27 words
The method of claim 1 further including the step of clamping said pressure transducers to the borehole wall during the taking of said borehole fluid pressure measurements.
Claim 5
Dependent Claim
29 words
The method of claim 1 further comprising the steps of carrying out second borehole fluid pressure measurements at each of said measurement locations with said pair of pressure transducers.
Claim 6
Dependent Claim
76 words
The method of claim 4 wherein the step of utilizing the pair of pressure measurements taken at each measurement location to determine the distance along the borehole between measurement locations is carried out in accordance with the following expression: ##EQU35## where, ΔZ=distance between measurement locations, D=distance between the pair of pressure transducers, and M ij =the jth pressure reading at vertical position i, for example M 12 is the second pressure measurement at vertical position 1.
Claim 7
Dependent Claim
76 words
The method of claim 4 wherein the step of utilizing the pair of pressure measurements taken at each measurement location to determine the distance along the borehole between measurement locations is carried out in accordance with the following expression: ##EQU36## where, ΔZ=distance between measurement locations, D=distance between the pair of pressure transducers, and M ij =the jth pressure reading at vertical position i, for example M 12 is the second pressure measurement at vertical position 1.
Claim 8
Dependent Claim
42 words
The method of claim 1 further comprising the step of: determining the bulk density of the formation surrounding the borehole from the plurality of gravity measurements and the distances traveled by said gravimetric logging tool between the taking of successive gravity measurements.
Claim 9
Dependent Claim
77 words
A borehole gravimetry system comprising: (a) a logging cable, (b) a borehole gravity meter affixed to said cable, (c) a first pressure transducer affixed to said logging cable, (d) a second pressure transducer affixed to said logging cable in spaced relation to said first pressure transducer, and (e) means for moving said logging cable through the borehole and stopping at successive measurement locations within the borehole to permit the taking of gravity and borehole fluid pressure measurements.
Claim 10
Dependent Claim
77 words
A borehole gravimetry system comprising: (a) a logging cable, (b) a borehole gravity meter affixed to said cable, (c) a first pressure transducer affixed to said logging cable, (d) a second pressure transducer affixed to said logging cable in spaced relation to said first pressure transducer, and (e) means for moving said logging cable through the borehole and stopping at successive measurement locations within the borehole to permit the taking of gravity and borehole fluid pressure measurements.
Claim 11
Dependent Claim
29 words
The system of claim 8 further including means for clamping said first and second pressure transducers to the borehole wall during the taking of said borehole fluid pressure measurements.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1987-10-09 | 1988-04-09 | 1988-10-09 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1991-10-09 | 1992-04-09 | 1992-10-09 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1995-10-09 | 1996-04-09 | 1996-10-09 | $7700.00 | Window Closed / Lapsed |