Claims Analysis
Total Claims: 8
Claim 1
Independent Claim
261 words
Ore leaching structure including a base portion, a shelter portion, a transfer portion and a treatment portion; said base portion including a peripheral concrete foundation, concrete wall sections extending upwardly therefrom, a crushed ore supporting concrete floor section extending between said wall sections, said floor section including at least one drain opening adjacent one wall section, said floor section being sloped from the other of said wall sections toward said drain opening; said shelter portion including vertical sections extending upwardly from said wall sections, said vertical sections and said wall sections together forming the sidewalls of said structure, a roof section extending between and joining the upper edges of said sidewalls; said transfer portion including a first group of crushed ore supplying doorways in a sidewall adjoining the sidewall along which said drain opening is located, said doorways of said first group being spaced along the length of said sidewall, a second group of leached ore removing doorways along a sidewall opposite to said first group of doorways, said doorways of said second group being aligned with said doorways of said first group, means for selectively covering said doorways; said treatment portion including conduit means disposed below said roof section, a plurality of spray means associated with said conduit means, said spray means being arranged substantially uniformly above crushed ore piled on said floor section to a depth of at least several feet, means for spraying liquid from said spray means to saturate said ore pile, and means for collecting liquid that has leached said ore pile from said drain opening.
Claim 2
Dependent Claim
261 words
Ore leaching structure including a base portion, a shelter portion, a transfer portion and a treatment portion; said base portion including a peripheral concrete foundation, concrete wall sections extending upwardly therefrom, a crushed ore supporting concrete floor section extending between said wall sections, said floor section including at least one drain opening adjacent one wall section, said floor section being sloped from the other of said wall sections toward said drain opening; said shelter portion including vertical sections extending upwardly from said wall sections, said vertical sections and said wall sections together forming the sidewalls of said structure, a roof section extending between and joining the upper edges of said sidewalls; said transfer portion including a first group of crushed ore supplying doorways in a sidewall adjoining the sidewall along which said drain opening is located, said doorways of said first group being spaced along the length of said sidewall, a second group of leached ore removing doorways along a sidewall opposite to said first group of doorways, said doorways of said second group being aligned with said doorways of said first group, means for selectively covering said doorways; said treatment portion including conduit means disposed below said roof section, a plurality of spray means associated with said conduit means, said spray means being arranged substantially uniformly above crushed ore piled on said floor section to a depth of at least several feet, means for spraying liquid from said spray means to saturate said ore pile, and means for collecting liquid that has leached said ore pile from said drain opening.
Claim 3
Dependent Claim
16 words
Ore leaching structure according to claim 1 wherein said base portion has a generally rectangular configuration.
Claim 4
Dependent Claim
16 words
Ore leaching structure according to claim 1 including means for controlling the atmosphere in said structure.
Claim 5
Dependent Claim
16 words
Ore leaching structure according to claim 3 wherein said controlling means includes heating or cooling means.
Claim 6
Dependent Claim
13 words
Ore leaching structure according to claim 1 wherein said shelter portion is insulated.
Claim 7
Dependent Claim
15 words
Ore leaching structure according to claim 1 wherein said shelter portion is formed of metal.
Claim 8
Dependent Claim
20 words
Ore leaching structure according to claim 1 wherein said spray means are spaced sprayheads arranged in a series of rows.