← Back to Patent Explorer
US4473328A Expired / Lapsed US ⏱️ 0.0 years remaining

Aspirator probe for sand blasting apparatus

Assignee: Individual
•
Filing: 1982-06-14
•
Granted: 1984-09-25
•
Expires: 2002-06-14
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract An aspirator probe for a sand blasting apparatus and the like has a tube-within-a-tube construction wherein the inner tube is a delivery tube for supplying a mixture of sand and air to a delivery hose, and the outer tube is an air supply tube which surrounds the majority of the length of the delivery tube. The delivery tube has a lower end which may be coextensive with the lower end of the air supply tube, or recessed within the lower end region of the air supply tube. The delivery tube has an upper end portion which projects upwardly beyond the upper end of the air supply tube for connection with the delivery hose. A communicating formation provides a passage for communicating both tubes to introduce, as by aspiration, a flow of air into the flow of sand which is being drawn into and through the delivery tube. In one embodiment the communicating formation takes the form a non-coextensive arrangement of the lower ends of the delivery and air supply tubes. In another embodiment the communicating formation takes the form of a hole, slot or notch provided in a side wall portion of the delivery tube at a location in proximity to the lower end of the delivery tube. In still another embodiment the communicating formation takes the form of a notch or relief provided on the lower end of the delivery tube.

Inventors

  • 👤 Robert W. Hengesbach

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-23 19:36
CPC Classifications
B; B24; B24C; B24C7/00; B24C7/0084; B24C3/00; B24C3/02; B24C3/06; B65; B65G; B65G53/00; B65G53/34; B65G53/40; B65G53/42

Claims Analysis

Total Claims: 24
Claim 1
Independent Claim 274 words
An aspirator probe for insertion into a reservoir of flowable material for delivering a mixture of (1) the flowable material, and (2) air into a vacuum line connected between the said probe and a discharge device, as a sandblast nozzle, comprising: a first upstanding inside structure defining an elongated upwardly extending generally tubular delivery passage, said passage having an opening at its lower end to receive therein the flowable material from a reservoir when the said probe is inserted into the reservoir, said upstanding structure having means at the upper end thereof for facilitating connection of a vacuum line thereto, said passage in said structure having an opening at its upper end for delivering a mixture of flowable material and air therefrom and into a vacuum line connected to said structure, a second upstanding outside structure substantially surrounding said first structure in non-coaxial relation thereto and attached thereto at one side thereof, with said second structure of lesser height than said first structure, confronting walls of said non-coaxial first and second structures defining an elongated upwardly extending tubular air supply passage which is open at its upper end to receive ambient air, and air communicating means located within said second structure and in proximity to the lower end of said first inside structure for communicating said first tubular structure delivery passage with said second tubular structure air supply passage for permitting a restricted flow of air to pass from the air supply passage to the delivery passage under the influence of an aspiration effect created as material from the reservoir flows in a direction established by the delivery passage past the air communicating means.
Claim 2
Dependent Claim 274 words
An aspirator probe for insertion into a reservoir of flowable material for delivering a mixture of (1) the flowable material, and (2) air into a vacuum line connected between the said probe and a discharge device, as a sandblast nozzle, comprising: a first upstanding inside structure defining an elongated upwardly extending generally tubular delivery passage, said passage having an opening at its lower end to receive therein the flowable material from a reservoir when the said probe is inserted into the reservoir, said upstanding structure having means at the upper end thereof for facilitating connection of a vacuum line thereto, said passage in said structure having an opening at its upper end for delivering a mixture of flowable material and air therefrom and into a vacuum line connected to said structure, a second upstanding outside structure substantially surrounding said first structure in non-coaxial relation thereto and attached thereto at one side thereof, with said second structure of lesser height than said first structure, confronting walls of said non-coaxial first and second structures defining an elongated upwardly extending tubular air supply passage which is open at its upper end to receive ambient air, and air communicating means located within said second structure and in proximity to the lower end of said first inside structure for communicating said first tubular structure delivery passage with said second tubular structure air supply passage for permitting a restricted flow of air to pass from the air supply passage to the delivery passage under the influence of an aspiration effect created as material from the reservoir flows in a direction established by the delivery passage past the air communicating means.
Claim 3
Dependent Claim 21 words
The aspirator probe of claim 1 wherein the first and second structures are formed from a single piece of elongate tubing.
Claim 4
Dependent Claim 74 words
The aspirator probe of claim 2 wherein the single piece of tubing has been deformed as by folding a portion of its longitudinally-extending sidewall inwardly to define the delivery passage, and by utilizing the remainder of the sidewall in cooperation with the inwardly-folded sidewall portion to define the air supply passage such that it has a generally horseshoe-shaped cross section surrounding the delivery passage along a majority of the length of the delivery passage.
Claim 5
Dependent Claim 29 words
The aspirator probe of claim 1 wherein the ratio of the cross-sectional area of the delivery passage to the cross-sectional area of the air supply passage is about 1:3.
Claim 6
Dependent Claim 24 words
The aspirator probe of claim 1 wherein the first and second structures comprise first and second elongate tubes of unequal diameter and unequal length.
Claim 7
Dependent Claim 41 words
The aspirator probe of claim 5 wherein the communicating formation means includes at least one opening formed through a sidewall portion of the first structure at a location spaced from but in proximity to the lower end of the first structure.
Claim 8
Dependent Claim 15 words
The aspirator probe of claim 1 wherein the second structure has an open lower end.
Claim 9
Dependent Claim 23 words
The aspirator probe of claim 7 wherein the communicating formation means includes a relief formed on the lower end of the first structure.
Claim 10
Dependent Claim 44 words
The aspirator of claim 8 wherein the relief includes an end surface formed on the delivery tube and extending in a first plane, the second structure has a lower end surface which extends in a second plane which is non-coextensive with the first plane.
Claim 11
Dependent Claim 19 words
The aspirator of claim 9 wherein the first and second planes intersect at an angle of about 30 degrees.
Claim 12
Dependent Claim 16 words
The aspirator of claim 9 wherein the first and second planes extend parallel to each other.
Claim 13
Dependent Claim 17 words
The aspirator of claim 7 wherein the lower ends of the first and second structures are coextensive.
Claim 14
Dependent Claim 17 words
The aspirator of claim 7 wherein the lower ends of the first and second structures are non-coextensive.
Claim 15
Dependent Claim 164 words
An aspirator probe for insertion into a reservoir of flowable material for delivering a mixture of the material and air, the probe comprising: (a) structure defining a delivery tube and an air supply tube arranged one within the other in non-coaxial and eccentric relation, with the delivery tube defining an upwardly-extending delivery passage and being of smaller diameter than the air supply tube, and with the air supply tube surrounding the delivery tube along a majority of the length of the delivery tube and cooperating with portions of the delivery tube to define an elongate, upwardly-extending generally arcuate air supply passage which is open at its upper end to receive ambient air; and (b) the structure additionally defining communicating formation means for communicating the delivery passage with the air supply passage for establishing an aspiration effect to draw air from the air supply passage to the delivery passage as material flowing in a direction established by the delivery passage passes by the formation means.
Claim 16
Dependent Claim 164 words
An aspirator probe for insertion into a reservoir of flowable material for delivering a mixture of the material and air, the probe comprising: (a) structure defining a delivery tube and an air supply tube arranged one within the other in non-coaxial and eccentric relation, with the delivery tube defining an upwardly-extending delivery passage and being of smaller diameter than the air supply tube, and with the air supply tube surrounding the delivery tube along a majority of the length of the delivery tube and cooperating with portions of the delivery tube to define an elongate, upwardly-extending generally arcuate air supply passage which is open at its upper end to receive ambient air; and (b) the structure additionally defining communicating formation means for communicating the delivery passage with the air supply passage for establishing an aspiration effect to draw air from the air supply passage to the delivery passage as material flowing in a direction established by the delivery passage passes by the formation means.
Claim 17
Dependent Claim 21 words
The aspirator probe of claim 14 wherein the first and second structures are formed from a single piece of elongate tubing.
Claim 18
Dependent Claim 74 words
The aspirator probe of claim 15 wherein the single piece of tubing has been deformed as by folding a portion of its longitudinally-extending sidewall inwardly to define the delivery passage, and by utilizing the remainder of the sidewall in cooperation with the inwardly-folded sidewall portion to define the air supply passage such that it has a generally horseshoe-shaped cross section surrounding the delivery passage along a majority of the length of the delivery passage.
Claim 19
Dependent Claim 29 words
The aspirator probe of claim 14 wherein the ratio of the cross-sectional area of the delivery passage to the cross-sectional area of the air supply passage is about 1:3.
Claim 20
Dependent Claim 24 words
The aspirator probe of claim 14 wherein the first and second structures comprise first and second elongate tubes of unequal diameter and unequal length.
Claim 21
Dependent Claim 41 words
The aspirator probe of claim 18 wherein the communicating formation means includes at least one opening formed through a sidewall portion of the first structure at a location spaced from but in proximity to the lower end of the first structure.
Claim 22
Dependent Claim 24 words
The aspirator probe of claim 18 wherein the communicating formation means includes a relief formed on the lower end portion of the first structure.
Claim 23
Dependent Claim 44 words
The aspirator of claim 20 wherein the relief includes an end surface formed on the delivery tube and extending in a plane which is inclined relative to the plane of the lower end of the second structure at an angle of about 30 degrees.
Claim 24
Dependent Claim 25 words
The aspirator of claim 18 wherein the communicating formation includes a non-coextensive arrangement of lower ends of the delivery tube and the air supply tube.

References Cited (Backward Citations)

US1180960A Cited
US1605617A Cited
US1948533A Cited
US2072555A Cited
US2133149A Cited
US2176577A Cited
US3032929A Cited
US3416844A Cited
US3632046A Cited
US3577681A Cited
US3756273A Cited
US4131319A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1987-09-25 1988-03-26 1988-09-25 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1991-09-25 1992-03-26 1992-09-25 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1995-09-25 1996-03-26 1996-09-25 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag