Heat recovery method and installation, particularly for cooling ash
Assignee: CREUST-LOIRE
•
Filing: 1982-11-22
•
Granted: 1984-09-18
•
Expires: 2002-11-22
Abstract
Abstract The invention relates to a recovery method and installation for the heat contained in a solid substance, occurring in divided form and more especially in ash produced by a fluidized bed combustion furnace. According to the invention the coarsest ash is removed through a purging outlet from the fluidized bed, the finest ash is separated from the smoke and the ash is cooled in two apparatuses adapted to the granulometry, one to the finest ash and the other to the coarsest ash.
Inventors
- 👤 Gerard Chrysostome
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-01 22:14
CPC Classifications
F; F27; F27D; F27D17/00; F27D17/10; F27D17/15
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
253 words
Installation for the recovery of the heat produced in a fluidized-bed combustion furnace, comprising: (a) a combustion furnace comprising a supply inlet for combustible material, means for forming a fluidized bed for combustion producing coarse ash and fine ash, and a purging outlet for the evacuation of the coarsest ash; (b) a separator connected to said combustion furnace by a circuit for evacuating smoke emerging from said furnace and fine ash entrained with said smoke and recovered in said separator; (c) a heat recovery device connected to said separator by a smoke evacuating conduit; (d) a first cooling means supplied with said coarsest ash evacuated from said fluidized bed through said purging outlet, said first cooling means comprising a counter-current cooler traversed by a gas flowing in reverse direction from the coarsest ash and evacuated after heating through a conduit debouching into said conduit for evacuation of the smoke from said separator, upstream of said recovery device; and (e) a second cooling means supplied with the finest ash recovered at an outlet of said separator, said second cooling means comprising a fluidized-bed cooler supplied by a gas in which said finest ash is fluidized, said gas being evacuated through a conduit at the interior of said heat recovery device in a zone where a mixture of smoke coming from said separator and said gas coming from said first cooling means has already been cooled to a temperature of the same order as the temperature of the gases emerging from said second cooling means.
Claim 2
Dependent Claim
253 words
Installation for the recovery of the heat produced in a fluidized-bed combustion furnace, comprising: (a) a combustion furnace comprising a supply inlet for combustible material, means for forming a fluidized bed for combustion producing coarse ash and fine ash, and a purging outlet for the evacuation of the coarsest ash; (b) a separator connected to said combustion furnace by a circuit for evacuating smoke emerging from said furnace and fine ash entrained with said smoke and recovered in said separator; (c) a heat recovery device connected to said separator by a smoke evacuating conduit; (d) a first cooling means supplied with said coarsest ash evacuated from said fluidized bed through said purging outlet, said first cooling means comprising a counter-current cooler traversed by a gas flowing in reverse direction from the coarsest ash and evacuated after heating through a conduit debouching into said conduit for evacuation of the smoke from said separator, upstream of said recovery device; and (e) a second cooling means supplied with the finest ash recovered at an outlet of said separator, said second cooling means comprising a fluidized-bed cooler supplied by a gas in which said finest ash is fluidized, said gas being evacuated through a conduit at the interior of said heat recovery device in a zone where a mixture of smoke coming from said separator and said gas coming from said first cooling means has already been cooled to a temperature of the same order as the temperature of the gases emerging from said second cooling means.
References Cited (Backward Citations)
US4111158A
Cited
US4159682A
Cited
US4159682B1
Cited
US4196676A
Cited
US4349969A
Cited
US4355601A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1987-09-18 | 1988-03-19 | 1988-09-18 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1991-09-18 | 1992-03-19 | 1992-09-18 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1995-09-18 | 1996-03-19 | 1996-09-18 | $7700.00 | Window Closed / Lapsed |