← Back to Patent Explorer
US4466809A Expired / Lapsed US ⏱️ 0.0 years remaining

Fuel supply method for a gasification chamber

Assignee: Creusot Loire SA
•
Filing: 1982-05-03
•
Granted: 1984-08-21
•
Expires: 2002-05-03
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Method for supplying fuel material to a gasification reactor into which a mixture of finely powdered fuel material, in suspension in a liquid phase, is charged inside a pressurized combustion chamber into which the combustion-supporting gas is injected and constituting the reactor, by means of a screw conveyor producing a continuously fluid-tight plug by compression of the driven material. By intermeshing at least two overlapping screws with identical threads rotated in the same direction, a wringing of the mixture introduced through an input orifice is compressed by regulating the flow rate of the mixture supply and the rotary speed of the screws so that, for a given flow rate of material, the plug constituted in a braking zone is at a given pressure and contains a certain proportion of liquid phase. The additional amount of liquid phase is expelled into the braking zone and reascends upstream into a drive zone where it is removed through orifices formed in filtering parts of a sleeve.

Inventors

  • 👤 Rolande Kissel
  • 👤 Pierre Berger
  • 👤 Gerard Chrysostome

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-02 20:11
CPC Classifications
B; B30; B30B; B30B9/00; B30B9/02; B30B9/12; B30B9/16; B30B9/121; B30B9/125; B30B9/127; B65; B65G; B65G33/00; B65G33/08; B65G33/14; B65G33/18; C; C10; C10J; C10J3/00; C10J3/46; C10J3/48; C10J3/50; F; F23; F23K; F23K3/00; C10J2200/00; C10J2200/15; C10J2200/158

Claims Analysis

Total Claims: 6
Claim 1
Independent Claim 255 words
Method of supplying particulate solid fuel material to a pressurized combustion-gasification chamber by means of a screw conveyor comprising at least two screws rotatably driven at the interior of a sleeve debouching at its downstream end into said chamber, said material being charged into said sleeve at its upstream end and being moved by said screws toward said downstream end, said material passing into a compression zone located at said downstream end so as to form a fluid-tight plug of compressed material introduced into said chamber and continuously renewed by material arriving from upstream, characterized in that said material is first mixed outside of said screw conveyor with a liquid phase constituting a moderator combustion fluid so as to form a mixture containing at least 40% by weight of liquid phase, said mixture then being charged by pumping into the inlet of said screw conveyor, said screws having different threading defining a drive zone in the downstream direction and a compression zone in which said fluid-tight plug is formed by expulsion of said liquid phase and compression of said combustible material, the flow rate of feeding said mixture and the speed of rotation of said screws being mutually adjusted in such manner as to maintain at the outlet of said screw conveyor a substantially constant pressure corresponding to a substantially constant proportion of liquid phase of at most 15%, any excess of said liquid phase beyond said proportion being expelled upstream and evacuated by filtering parts arranged in said sleeve upstream of said compression zone.
Claim 2
Dependent Claim 255 words
Method of supplying particulate solid fuel material to a pressurized combustion-gasification chamber by means of a screw conveyor comprising at least two screws rotatably driven at the interior of a sleeve debouching at its downstream end into said chamber, said material being charged into said sleeve at its upstream end and being moved by said screws toward said downstream end, said material passing into a compression zone located at said downstream end so as to form a fluid-tight plug of compressed material introduced into said chamber and continuously renewed by material arriving from upstream, characterized in that said material is first mixed outside of said screw conveyor with a liquid phase constituting a moderator combustion fluid so as to form a mixture containing at least 40% by weight of liquid phase, said mixture then being charged by pumping into the inlet of said screw conveyor, said screws having different threading defining a drive zone in the downstream direction and a compression zone in which said fluid-tight plug is formed by expulsion of said liquid phase and compression of said combustible material, the flow rate of feeding said mixture and the speed of rotation of said screws being mutually adjusted in such manner as to maintain at the outlet of said screw conveyor a substantially constant pressure corresponding to a substantially constant proportion of liquid phase of at most 15%, any excess of said liquid phase beyond said proportion being expelled upstream and evacuated by filtering parts arranged in said sleeve upstream of said compression zone.
Claim 3
Dependent Claim 68 words
Method according to claim 1, wherein said mixture is passed through a wet grinder prior to its charging into said screw conveyor for wet grinding sufficiently light to allow the subsistence within the mixture of particles larger than 2 mm, supplemental grinding being effected inside said screw conveyor during the formation of said fluid-tight plug, to the point where said plug contains no particle larger than 0.5 mm.
Claim 4
Dependent Claim 47 words
Process according to claim 2, wherein said fluid-tight plug and said supplemental grinding are effected by passing said mixture into said compression zone of said screw conveyor, the latter having threads of reversed pitches provided with windows enabling selective passage downstream of said material after sufficient grinding.
Claim 5
Dependent Claim 34 words
Process according to claim 2, wherein, after wet grinding, said mixture is passed into a hydrocyclone allowing retention of large particles which are then recycled upstream of said wet grinder for further wet grinding.
Claim 6
Dependent Claim 68 words
Process according to claim 1, wherein said mixture is charged in suspended form from the outlet of a coal pipe directly to the inlet of said screw conveyor, where there is effected wringing of said mixture and formation of a plug having a water content lower than a preselected limit for proper operation of said reactor, supplemental grinding of said fuel material being performed simultaneously with said charging.

References Cited (Backward Citations)

US2560807A Cited
US2735787A Cited
US2184248A Cited
US3035306A Cited
US4088528A Cited
US4302353A Cited
US4284247A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1987-08-21 1988-02-20 1988-08-21 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1991-08-21 1992-02-20 1992-08-21 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1995-08-21 1996-02-20 1996-08-21 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag