Claims Analysis
Total Claims: 5
Claim 1
Independent Claim
378 words
In an electric generating system of the type to be connected to a power grid carrying current of preselected frequency and phase, and to supply power to and receive power from the grid, and designed to operate with a wind turbine prime mover having negligible starting torque, the combination of (a) a support on which the turbine can be mounted; (b) a clutch having an input shaft for connection to the turbine shaft and an output shaft, and having an overriding mode permitting the transfer of torque from the input shaft to the output shaft and preventing the transfer of torque from the output shaft to the input shaft, said clutch entering its overriding mode responsive to a first level of a clutch control signal, said clutch also having a lockup mode wherein torque from the output shaft can be transferred to the input shaft, said clutch entering its lockup mode responsive to a second level of the clutch control signal; (c) A generator mounted on the support and whose rotor is connected to rotate with the clutch output shaft, and having output terminals for providing electric power to the grid when torque is applied to the rotor, said generator also functioning as a motor and supplying torque to the clutch output shaft responsive to the combination of absence of torque to the rotor from the clutch output shaft and current input to the generator output terminals; (d) an anemometer mounted adjacent the wind turbine support and producing a wind strength signal having a first level indicative of wind below a predetermined threshold speed, and a second level indicative of wind at or above the threshold speed; (e) turbine operating condition indicating means sensing whether the turbine is rotating, for supplying a turbine speed signal having a first level responsive to the turbine having rotational speed above a predetermined level, and a second level otherwise; and (f) start-up control means receiving the turbine speed signal and the wind strength signals, for supplying a clutch control signal having its second level for at least a predetermined interval responsive to the wind strength signal falling within its second level when the turbine speed signal is at its second level, and supplying a clutch control signal having its first level otherwise.
Claim 2
Dependent Claim
378 words
In an electric generating system of the type to be connected to a power grid carrying current of preselected frequency and phase, and to supply power to and receive power from the grid, and designed to operate with a wind turbine prime mover having negligible starting torque, the combination of (a) a support on which the turbine can be mounted; (b) a clutch having an input shaft for connection to the turbine shaft and an output shaft, and having an overriding mode permitting the transfer of torque from the input shaft to the output shaft and preventing the transfer of torque from the output shaft to the input shaft, said clutch entering its overriding mode responsive to a first level of a clutch control signal, said clutch also having a lockup mode wherein torque from the output shaft can be transferred to the input shaft, said clutch entering its lockup mode responsive to a second level of the clutch control signal; (c) A generator mounted on the support and whose rotor is connected to rotate with the clutch output shaft, and having output terminals for providing electric power to the grid when torque is applied to the rotor, said generator also functioning as a motor and supplying torque to the clutch output shaft responsive to the combination of absence of torque to the rotor from the clutch output shaft and current input to the generator output terminals; (d) an anemometer mounted adjacent the wind turbine support and producing a wind strength signal having a first level indicative of wind below a predetermined threshold speed, and a second level indicative of wind at or above the threshold speed; (e) turbine operating condition indicating means sensing whether the turbine is rotating, for supplying a turbine speed signal having a first level responsive to the turbine having rotational speed above a predetermined level, and a second level otherwise; and (f) start-up control means receiving the turbine speed signal and the wind strength signals, for supplying a clutch control signal having its second level for at least a predetermined interval responsive to the wind strength signal falling within its second level when the turbine speed signal is at its second level, and supplying a clutch control signal having its first level otherwise.
Claim 3
Dependent Claim
66 words
The apparatus of claim 1, wherein the control means includes (a) a timer receiving the wind strength signal and responsive to the wind strength signal's second level generating a restart signal at a preselected interval thereafter; and (b) means receiving the restart signal and responsive to the restart signal coinciding with the wind strength signal's second level setting the clutch control signal to its second level.
Claim 4
Dependent Claim
89 words
The apparatus of claim 1, wherein the start-up control means includes means for generating a start-up signal indicative of the wind strength signal falling within its second range for at least portions of a preselected interval length, and a one-shot receiving the start-up signal and the turbine speed signal and having a predetermined set time interval, and responsive to the coincidence of the start-up signal and the second level of the turbine speed signal, supplying a first level clutch control signal for the set time interval of the one-shot.
Claim 5
Dependent Claim
116 words
The apparatus of claim 3, wherein the start-up control means further comprises a delay circuit receiving the wind strength signal and supplying said wind strength signal delayed by a predetermined time interval, a first AND gate receiving the wind strength signal and the delayed wind strength signal, and supplying a logical 1 signal responsive to each signal reaching its second level simultaneously, and a logical 0 otherwise, and a second AND gate receiving as inputs the turbine speed signal and the output of the first AND gate, and supplying a start-up signal to the one-shot responsive to coincidence of the second level of the turbine speed signal and a logical 1 from the first AND gate.