Claims Analysis
Total Claims: 13
Claim 1
Independent Claim
204 words
A control system for a cooling tower having a source of make-up water having a variable conductivity from a low to a high value, said control system comprising: (1) first means for establishing the maximum conductivity of said low conductivity water in said tower at a predetermined Langelier's Number, (2) second means for establishing a multiplier value based on said variable make-up waters and tower waters conductivities, (3) third means to measure tower water conductivity, (4) fourth means to measure make-up water conductivity, (5) fifth means to calculate the difference between the low conductivity make-up water conductivity and measured make-up water conductivity to establish a baseline value, (6) sixth means to multiply said baseline value by said multiplier to establish a delta value indicative of the required change in tower water conductivity to maintain the predetermined Langelier's number, (7) seventh means to add said delta value to said maximum conductivity of said low conductivity water in the tower at said predetermined Langelier's number to produce a control value for the conductivity of the tower water, thereby maintaining said predetermined Langelier's number, and (8) eighth means responsive to said control value for controlling bleeding and replacement water in said tower to maintain said control value.
Claim 2
Dependent Claim
204 words
A control system for a cooling tower having a source of make-up water having a variable conductivity from a low to a high value, said control system comprising: (1) first means for establishing the maximum conductivity of said low conductivity water in said tower at a predetermined Langelier's Number, (2) second means for establishing a multiplier value based on said variable make-up waters and tower waters conductivities, (3) third means to measure tower water conductivity, (4) fourth means to measure make-up water conductivity, (5) fifth means to calculate the difference between the low conductivity make-up water conductivity and measured make-up water conductivity to establish a baseline value, (6) sixth means to multiply said baseline value by said multiplier to establish a delta value indicative of the required change in tower water conductivity to maintain the predetermined Langelier's number, (7) seventh means to add said delta value to said maximum conductivity of said low conductivity water in the tower at said predetermined Langelier's number to produce a control value for the conductivity of the tower water, thereby maintaining said predetermined Langelier's number, and (8) eighth means responsive to said control value for controlling bleeding and replacement water in said tower to maintain said control value.
Claim 3
Dependent Claim
29 words
The control system of claim 1 wherein said multiplier is based on the maximum conductivity of said low conductivity water and the maximum conductivity of said high conductivity water.
Claim 4
Dependent Claim
61 words
The control system of claim 2 wherein said multiplier is established by subtracting the maximum conductivity of the high conductivity tower water from the maximum conductivity of the low conductivity tower water and dividing that difference by the difference between an initial predetermined conductivity for the low conductivity make-up water and an initial predetermined conductivity for the high conductivity make-up water.
Claim 5
Dependent Claim
25 words
The control system of claim 1 wherein said third means comprises a temperature compensated probe and wherein said fourth means comprises a temperature compensated probe.
Claim 6
Dependent Claim
13 words
The control system of claim 1 including meter means to display conductivity readings.
Claim 7
Dependent Claim
14 words
The control system of claim 1 additionally comprising calibration means to calibrate said meter.
Claim 8
Dependent Claim
31 words
The control system of claim 1 wherein said third and fourth means provide signals indicative of water conditions at all times, whereupon said control value changes as system water conditions change.
Claim 9
Independent Claim
177 words
A method of controlling the bleeding and replacement of make-up water in a cooling tower system having a source of make-up water having a variable conductivity from a low to a high value, said method comprising: (1) establishing the maximum conductivity of said low conductivity water in said tower at a predetermined Langelier's number, (2) establishing a multiplier value based on said variable make-up waters and tower waters conductivities, (3) measuring tower water conductivity, (4) measuring make-up water conductivity, (5) calculating the difference between the low conductivity make-up water conductivity and measured make-up water conductivity to establish a baseline value, (6) multiplying said baseline value by said multiplier to establish a delta value indicative of the required change in tower water conductivity, (7) adding said delta value to said maximum conductivity of said low conductivity water in the tower at said predetermined Langelier's number to produce a control value for the conductivity of the tower water, thereby maintaining said predetermined Langelier's number, and (8) controlling bleeding and replacement water in said tower to maintain said control value.
Claim 10
Independent Claim
177 words
A method of controlling the bleeding and replacement of make-up water in a cooling tower system having a source of make-up water having a variable conductivity from a low to a high value, said method comprising: (1) establishing the maximum conductivity of said low conductivity water in said tower at a predetermined Langelier's number, (2) establishing a multiplier value based on said variable make-up waters and tower waters conductivities, (3) measuring tower water conductivity, (4) measuring make-up water conductivity, (5) calculating the difference between the low conductivity make-up water conductivity and measured make-up water conductivity to establish a baseline value, (6) multiplying said baseline value by said multiplier to establish a delta value indicative of the required change in tower water conductivity, (7) adding said delta value to said maximum conductivity of said low conductivity water in the tower at said predetermined Langelier's number to produce a control value for the conductivity of the tower water, thereby maintaining said predetermined Langelier's number, and (8) controlling bleeding and replacement water in said tower to maintain said control value.
Claim 11
Dependent Claim
60 words
The system of claim 8 wherein said multiplier is established by subtracting the maximum conductivity of the high conductivity tower water from the maximum conductivity of the low conductivity tower water and dividing that difference by the difference between a first predetermined conductivity for the low conductivity make-up water and a second predetermined conductivity for the high conductivity make-up water.
Claim 12
Independent Claim
90 words
A method of controlling the bleeding and replacement make-up water in a cooling tower system having a supply of make-up water which varies in conductivity between a low cooling tower water occurs based upon the sensed water conductivities and the input parameters to maintain a predetermined Langelier's number(s). Means are provided to display system conditions and to effect calibration of the system. The method entails establishing an indexing factor based upon the cooling water parameters and the desired Langelier's number(s) and using that indexing factor for adjusting the trip point.
Claim 13
Independent Claim
90 words
A method of controlling the bleeding and replacement make-up water in a cooling tower system having a supply of make-up water which varies in conductivity between a low cooling tower water occurs based upon the sensed water conductivities and the input parameters to maintain a predetermined Langelier's number(s). Means are provided to display system conditions and to effect calibration of the system. The method entails establishing an indexing factor based upon the cooling water parameters and the desired Langelier's number(s) and using that indexing factor for adjusting the trip point.