US4459257A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Process for producing a shaped article by injection moulding
Assignee: Cibie Projecteurs SA
•
Filing: 1983-06-29
•
Granted: 1984-07-10
•
Expires: 2003-06-29
Abstract
Abstract The process for producing a shaped article comprising a polythene terephthalate (PETP) core containing from 0 to 50% of mineral fillers and a covering layer of a second thermoplastics material having a softening point below that of the PETP. The second material and the PETP are injected one after the other into a mould which is maintained at a temperature below the crystallization point of the PETP having regard to its fillers. The second material injected in the first phase acts as a thermal buffer slowing down temperature equalization between the PETP injected in the second injection phase and the mould, thus ensuring the required properties in the PETP core.
Inventors
- 👤 Antoine Baciu
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-25 22:48
CPC Classifications
B; B29; B29C; B29C45/00; B29C45/16; B29C45/1642; B29K; B29K2105/00; B29K2105/06; B29K2105/16; B29L; B29L2011/00; B29L2011/0083
Claims Analysis
Total Claims: 9
Claim 1
Independent Claim
251 words
A process for the production of a shaped article of the type comprising a core of a first thermoplastics material and a covering layer of a second thermoplastics material, said process comprising: in a first step pressure-injecting said second material into a mould defining at least one impression of said article, while said second material is at an injection temperature above the softening point of said first material; then in a second step pressure-injecting into said mould said first material at an injection temperature between its softening point and said injection temperature of said second material, said first and second materials being injected in the requisite quantities for forming said covering layer and said core respectively; cooling said materials until at least the outer layer is solidified; then removing the finished article from said mould; and in which process said first material is a polythene terephthalate containing from 0 to 50% mineral fillers and said second material is a different thermoplastics material having a lower softening point than that of said polythene terephthalate; said two injection steps are performed immediately consecutively while said mould is maintained at a temperature below said softening point of said second material and below the crystallization temperature of said polythene terephthalate containing its proportion of fillers to provide a semi-crystalline core structure; and in which process in said second step said second material which was injected in said first step acts as a heat buffer slowing down temperature equilisation between said polythene terephthalate and said mould.
Claim 2
Dependent Claim
251 words
A process for the production of a shaped article of the type comprising a core of a first thermoplastics material and a covering layer of a second thermoplastics material, said process comprising: in a first step pressure-injecting said second material into a mould defining at least one impression of said article, while said second material is at an injection temperature above the softening point of said first material; then in a second step pressure-injecting into said mould said first material at an injection temperature between its softening point and said injection temperature of said second material, said first and second materials being injected in the requisite quantities for forming said covering layer and said core respectively; cooling said materials until at least the outer layer is solidified; then removing the finished article from said mould; and in which process said first material is a polythene terephthalate containing from 0 to 50% mineral fillers and said second material is a different thermoplastics material having a lower softening point than that of said polythene terephthalate; said two injection steps are performed immediately consecutively while said mould is maintained at a temperature below said softening point of said second material and below the crystallization temperature of said polythene terephthalate containing its proportion of fillers to provide a semi-crystalline core structure; and in which process in said second step said second material which was injected in said first step acts as a heat buffer slowing down temperature equilisation between said polythene terephthalate and said mould.
Claim 3
Dependent Claim
28 words
A process according to claim 1, wherein said finished article is removed from said mould after said second material has rigidified but before said polythene terephthalate has rigidified.
Claim 4
Dependent Claim
27 words
A process according to claim 1 wherein said second thermoplastics material is a material selected from the group consisting of polybutylene terephthalate, polycarbonate, ABS, polystyrene and methacrylate.
Claim 5
Dependent Claim
40 words
A process according to claim 1 wherein said second material is injected at an injection temperature of the order of 240° C. and said polythene terephthalate is injected at a temperature of the order of from 210° to 220° C.
Claim 6
Dependent Claim
31 words
A process according to claim 1 wherein said second material and said polythene terephthalate are injected in proportions of one-third and two-thirds, respectively, of the total volume of said mould impression.
Claim 7
Dependent Claim
22 words
A process according to claim 1 wherein the combined duration of said two injection steps is of the order to two seconds.
Claim 8
Dependent Claim
31 words
A process according to claim 1 which further includes an auxiliary injection step of said second thermoplastics material between said injection step and the removal of said article from said mould.
Claim 9
Dependent Claim
17 words
A process according to claim 1 wherein said mould temperature is maintained at approximately sixty degrees celcius.
References Cited (Backward Citations)
US3187072A
Cited
US3263013A
Cited
GB1156217A
Cited
GB1247911A
Cited
GB1339445A
Cited
US3878282A
Cited
GB1370075A
Cited
US3785217A
Cited
GB1420948A
Cited
US3966870A
Cited
US4048361A
Cited
US4092391A
Cited
US4155972A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1987-07-10 | 1988-01-09 | 1988-07-10 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1991-07-10 | 1992-01-09 | 1992-07-10 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1995-07-10 | 1996-01-09 | 1996-07-10 | $7700.00 | Window Closed / Lapsed |