← Back to Patent Explorer
US4453590A Expired / Lapsed US ⏱️ 0.0 years remaining

Duty cycle controller

Assignee: SUN WEST SOLAR SYSTEMS INC A CORP OF AZ
•
Filing: 1982-07-12
•
Granted: 1984-06-12
•
Expires: 2002-07-12
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A duty cycle controller for an air conditioning system. Solid state switches are connected in series with the heating and cooling switches of a thermostat in circuits for energizing the cooling and heating subsystems, respectively, of an air conditioner. A switch control circuit, when enabled, causes the solid state switches to be conductive when set and nonconductive when reset. Timing signals from a counter applied to the switch control circuit determine the state of the switch control circuit and thus the duty cycles for the heating and cooling subsystem. The controller is provided with a safety circuit which disables the switch control circuit to render the solid state switches nonconductive for a predetermined period of time after a power interruption or after a cooling or heating switch of the thermostat opens. The controller assures that each heating and cooling duty cycle begins with a full energization period. The length of the heating and cooling duty cycles can be readily varied.

Inventors

  • 👤 Robert A. Holliday
  • 👤 Warren L. Williamson

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-26 21:58
CPC Classifications
F; F24; F24F; F24F11/00; F24F11/30; F24F11/46; F24F11/62; F24F11/63; F24F11/65; F24F11/67; F24F11/88; G; G05; G05D; G05D23/00; G05D23/19; F24F2110/00; F24F2110/10; F25; F25B; F25B2600/00; F25B2600/02; F25B2600/025; F25B2600/0251

Claims Analysis

Total Claims: 12
Claim 1
Independent Claim 277 words
A duty cycle controller for an air conditioning system including cooling means, heating means, and a thermostat having a cooling switch and a heating switch comprising: a first solid state switch means adapted to be connected in series with the cooling switch of the thermostat in a circuit, said first switch means for energizing the cooling means of the air conditioner when conductive during a cooling cycle of operation; a second solid state switch means adapted to be connected in series with the heating switch of the thermostat in a circuit said second switch means for energizing the heating means of an air conditioner when conductive during a heating cycle of operation; switch control circuit means for causing said first and second switch means to be conductive when set and nonconductive when reset; timing means including means for producing clock pulses at a single frequency and digital counter means to which the clock pulses are applied for producing timing pulses at predetermined time intervals during each cycle of operation for setting the switch control circuit means to render each of the switch means conductive for different periods of time which periods differ by amounts equal to an integer times the period of the clock pulses, and for resetting the switch control means to render each of said switch means nonconductive for different periods of time; safety means for preventing the switch control means from rendering said switch means conductive for a predetermined delay period after a power interruption or after a thermostat switch opens after having been closed; and control means for initiating the conductive period for the switch means at the time a thermostat switch closes.
Claim 2
Dependent Claim 277 words
A duty cycle controller for an air conditioning system including cooling means, heating means, and a thermostat having a cooling switch and a heating switch comprising: a first solid state switch means adapted to be connected in series with the cooling switch of the thermostat in a circuit, said first switch means for energizing the cooling means of the air conditioner when conductive during a cooling cycle of operation; a second solid state switch means adapted to be connected in series with the heating switch of the thermostat in a circuit said second switch means for energizing the heating means of an air conditioner when conductive during a heating cycle of operation; switch control circuit means for causing said first and second switch means to be conductive when set and nonconductive when reset; timing means including means for producing clock pulses at a single frequency and digital counter means to which the clock pulses are applied for producing timing pulses at predetermined time intervals during each cycle of operation for setting the switch control circuit means to render each of the switch means conductive for different periods of time which periods differ by amounts equal to an integer times the period of the clock pulses, and for resetting the switch control means to render each of said switch means nonconductive for different periods of time; safety means for preventing the switch control means from rendering said switch means conductive for a predetermined delay period after a power interruption or after a thermostat switch opens after having been closed; and control means for initiating the conductive period for the switch means at the time a thermostat switch closes.
Claim 3
Dependent Claim 23 words
A duty cycle controller as defined in claim 1 in which the frequency of the clock pulses is substantially one cycle per minute.
Claim 4
Dependent Claim 18 words
A duty cycle controller as defined in claim 1, in which the solid state switch means are triacs.
Claim 5
Dependent Claim 22 words
A duty cycle controller as defined in claim 3, in which the switch control circuit means includes a three state R-S latch.
Claim 6
Dependent Claim 26 words
A duty cycle controller as defined in claim 4, in which the timing means includes switch means for varying the on/off periods of the duty cycles.
Claim 7
Dependent Claim 233 words
A duty cycle controller for controlling the energization of heating and cooling means of an air conditioner in response to heating or cooling signals produced by a thermostat, said controller adapted to be connected to a source of electrical power, comprising: resetable clock means for producing clock pulses at a constant frequency; resetable counter means to which the clock pulses are applied to produce timing pulses; cooling switch means adapted to be connected in series in the cooling energization circuit for the cooling means of the air conditioner; heating switch means adapted to be connected in series in the heating energization circuit of the heating means of the air conditioner; switch control means to which said timing pulses are selectively applied to render the cooling and heating switch means conductive for a conductive period and nonconductive for a nonconductive period; safety means for preventing the switch control means from permitting the switch means to become conductive for a predetermined safety period after the occurrence of a power interruption or after the termination of a heating or cooling signal by the thermostat; means for resetting the clock means and counter means when the heating or cooling signal is first produced by the thermostat; and means for resetting the clock and counter means at the end of the safety period if a heating or cooling signal is produced by the thermostat during such safety period.
Claim 8
Dependent Claim 233 words
A duty cycle controller for controlling the energization of heating and cooling means of an air conditioner in response to heating or cooling signals produced by a thermostat, said controller adapted to be connected to a source of electrical power, comprising: resetable clock means for producing clock pulses at a constant frequency; resetable counter means to which the clock pulses are applied to produce timing pulses; cooling switch means adapted to be connected in series in the cooling energization circuit for the cooling means of the air conditioner; heating switch means adapted to be connected in series in the heating energization circuit of the heating means of the air conditioner; switch control means to which said timing pulses are selectively applied to render the cooling and heating switch means conductive for a conductive period and nonconductive for a nonconductive period; safety means for preventing the switch control means from permitting the switch means to become conductive for a predetermined safety period after the occurrence of a power interruption or after the termination of a heating or cooling signal by the thermostat; means for resetting the clock means and counter means when the heating or cooling signal is first produced by the thermostat; and means for resetting the clock and counter means at the end of the safety period if a heating or cooling signal is produced by the thermostat during such safety period.
Claim 9
Dependent Claim 21 words
A duty cycle controller as defined in claim 6, in which the cooling and heating switch means are solid state switches.
Claim 10
Dependent Claim 21 words
A duty cycle controller as defined in claim 7, in which the switch control means includes a three state R.S. latch.
Claim 11
Dependent Claim 23 words
A duty cycle controller as defined in claim 6, in which rotary switch means apply the timing pulses to the switch control means.
Claim 12
Dependent Claim 29 words
A duty cycle controller as defined in claim 6 in which the frequency of the clock pulses is a function of the frequency of its source of electrical power.

References Cited (Backward Citations)

US3636369A Cited
US4045973A Cited
US4102389A Cited
US4142375A Cited
US4094166A Cited
US4320316A Cited
US4356962A Cited
US4384461A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1987-06-12 1987-12-12 1988-06-12 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1991-06-12 1991-12-12 1992-06-12 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1995-06-12 1995-12-12 1996-06-12 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag