US4452160A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method of manufacturing a cut pile carpet
Assignee: Teijin Ltd
•
Filing: 1982-11-12
•
Granted: 1984-06-05
•
Expires: 2002-11-12
Abstract
Abstract A pile yarn for a carpet and a cut pile carpet. A bulky yarn of a polyamide multifilament is fed to a false twisting and heat setting device where filaments in the yarn are thermally and partially adhered to each other while the yarn is false twisted. A bulky cohesive continuous multifilament yarn thus obtained has alternate twists therein along the lengthwise direction thereof and a latent torque therein, and after it is heat treated under a constrained condition, preferably by means of saturated or superheated steam, so that the torque in the yarn is lowered, it is tufted on a substrate of a carpet as a pile yarn and the piles are cut.
Inventors
- 👤 Koji Tajiri
- 👤 Mikio Oohara
- 👤 Kiyoshi Maruo
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-09 23:15
CPC Classifications
D; D02; D02G; D02G1/00; D02G1/02; D02G1/0206; D02G1/0266; D02G3/00; D02G3/22; D02G3/26; D02G3/28; D02G3/286; D02G3/44; D02G3/445
Claims Analysis
Total Claims: 3
Claim 1
Independent Claim
249 words
A process for manufacturing a cut pile carpet, comprising the steps of: (a) feeding a bulky polyamide multifilament yarn to a device for false twisting and heat setting, so that (i) false twists between 100 twists per meter and 1000 twists per meter are imparted into said bulky yarn, and (ii) while said false twists are maintained in said yarn, said bulky yarn is heat set so that filaments composing said yarn are thermally and partially adhered to each other, said heat set bulky yarn including S twist portions and Z twist portions; (b) taking up said false twisted and heat set yarn while thermal and partial adhesions remain therein, to provide a cohesive bulky synthetic multifilament yarn having alternate twists with S twist portions and z twist portions being distributed randomly along the lengthwise direction of the yarn, with said yarn having a total crimp between 3% and 15%, a coherent factor between 5 and 100, and a latent torque index between 60 twists per meter and 300 twists per meter, and an adherent ratio between 0.5% and 40%; (c) heat relaxation treating said cohesive bulky synthetic multifilament yarn under a constrained condition so that said latent torque index of said cohesive bulky synthetic multifilament yarn is decreased to less than 60 twists per meter; (d) tufting said heat relaxation treated cohesive bulky synthetic multifilament yarn as a pile yarn on a substrate; and (e) cutting the loops of said pile yarn so as to create cut piles.
Claim 2
Dependent Claim
249 words
A process for manufacturing a cut pile carpet, comprising the steps of: (a) feeding a bulky polyamide multifilament yarn to a device for false twisting and heat setting, so that (i) false twists between 100 twists per meter and 1000 twists per meter are imparted into said bulky yarn, and (ii) while said false twists are maintained in said yarn, said bulky yarn is heat set so that filaments composing said yarn are thermally and partially adhered to each other, said heat set bulky yarn including S twist portions and Z twist portions; (b) taking up said false twisted and heat set yarn while thermal and partial adhesions remain therein, to provide a cohesive bulky synthetic multifilament yarn having alternate twists with S twist portions and z twist portions being distributed randomly along the lengthwise direction of the yarn, with said yarn having a total crimp between 3% and 15%, a coherent factor between 5 and 100, and a latent torque index between 60 twists per meter and 300 twists per meter, and an adherent ratio between 0.5% and 40%; (c) heat relaxation treating said cohesive bulky synthetic multifilament yarn under a constrained condition so that said latent torque index of said cohesive bulky synthetic multifilament yarn is decreased to less than 60 twists per meter; (d) tufting said heat relaxation treated cohesive bulky synthetic multifilament yarn as a pile yarn on a substrate; and (e) cutting the loops of said pile yarn so as to create cut piles.
Claim 3
Dependent Claim
23 words
The process according to claim 1 further comprising dyeing said cohesive bulky synthetic multifilament yarn simultaneously with the step of heat relaxation treating.
References Cited (Backward Citations)
US2815559A
Cited
US2961010A
Cited
US3058291A
Cited
US3576702A
Cited
US3553953A
Cited
US3611698A
Cited
US3828542A
Cited
US3967441A
Cited
US3916651A
Cited
US3971200A
Cited
US3968638A
Cited
US4114549A
Cited
US4355592A
Cited
US4290378A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1987-06-05 | 1987-12-05 | 1988-06-05 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1991-06-05 | 1991-12-05 | 1992-06-05 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1995-06-05 | 1995-12-05 | 1996-06-05 | $7700.00 | Window Closed / Lapsed |