US4432893A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Precipitation-adsorption process for the decontamination of nuclear waste supernates
Assignee: United States Department of Energy
•
Filing: 1982-05-19
•
Granted: 1984-02-21
•
Expires: 2002-05-19
Abstract
Abstract High-level nuclear waste supernate is decontaminated of cesium by precipitation of the cesium and potassium with sodium tetraphenyl boron. Simultaneously, strontium-90 is removed from the waste supernate sorption of insoluble sodium titanate. The waste solution is then filtered to separate the solution decontaminated of cesium and strontium.
Inventors
- 👤 Lien-Mow Lee
- 👤 Lester L. Kilpatrick
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-04 10:20
CPC Classifications
G; G21; G21F; G21F9/00; G21F9/04; G21F9/06; G21F9/10
Claims Analysis
Total Claims: 25
Claim 1
Independent Claim
53 words
Process for the removal of the residual hazardous soluble values from a nuclear waste solution which comprises simultaneously contacting said solution with sufficient sodium tetraphenylboron and sufficient sodium titanate to form an insoluble slurry including said hazardous values and filtering said solution to separate and substantially decontaminate said solution of said hazardous values.
Claim 2
Dependent Claim
53 words
Process for the removal of the residual hazardous soluble values from a nuclear waste solution which comprises simultaneously contacting said solution with sufficient sodium tetraphenylboron and sufficient sodium titanate to form an insoluble slurry including said hazardous values and filtering said solution to separate and substantially decontaminate said solution of said hazardous values.
Claim 3
Dependent Claim
23 words
Process as claimed in claim 1 wherein said hazardous soluble values are selected from the group consisting essentially of cesium, plutonium and strontium.
Claim 4
Dependent Claim
17 words
Process as claimed in claim 1 wherein said hazardous values are isotopes of cesium, plutonium and strontium.
Claim 5
Dependent Claim
24 words
Process as claimed in claim 1 wherein said waste solution also contains significant quantities of the elements selected from the group sodium and potassium.
Claim 6
Dependent Claim
16 words
Process as claimed in claim 4 wherein said potassium is also removed from said waste solution.
Claim 7
Dependent Claim
93 words
Process for the decontamination of a nuclear waste solution containing cesium, strontium and residual amounts of soluble plutonium which comprises simultaneously contacting said waste solution containing said values with a solution of sodium tetraphenylboron in sufficient quantity to precipitate said cesium and with sufficient insoluble sodium titanate to sorb said strontium and said soluble plutonium from said waste solution to thereby form an insoluble slurry containing said cesium, strontium and plutonium, filtering said solution to separate said insoluble slurry and to provide a waste solution substantially decontaminated of said cesium, strontium and plutonium.
Claim 8
Dependent Claim
93 words
Process for the decontamination of a nuclear waste solution containing cesium, strontium and residual amounts of soluble plutonium which comprises simultaneously contacting said waste solution containing said values with a solution of sodium tetraphenylboron in sufficient quantity to precipitate said cesium and with sufficient insoluble sodium titanate to sorb said strontium and said soluble plutonium from said waste solution to thereby form an insoluble slurry containing said cesium, strontium and plutonium, filtering said solution to separate said insoluble slurry and to provide a waste solution substantially decontaminated of said cesium, strontium and plutonium.
Claim 9
Dependent Claim
55 words
Process for the decontamination of a nuclear waste solution having cesium, plutonium and strontium values which comprises contacting said waste solution with sufficient sodium tetraphenylboron and sufficient insoluble sodium titanate to remove said cesium, plutonium and strontium values from said solution and recovering said solution which has been substantially decontaminated of cesium, plutonium and strontium.
Claim 10
Dependent Claim
55 words
Process for the decontamination of a nuclear waste solution having cesium, plutonium and strontium values which comprises contacting said waste solution with sufficient sodium tetraphenylboron and sufficient insoluble sodium titanate to remove said cesium, plutonium and strontium values from said solution and recovering said solution which has been substantially decontaminated of cesium, plutonium and strontium.
Claim 11
Dependent Claim
17 words
Process as claimed in claim 1 wherein said solution contains up to 8.0 M of sodium ion.
Claim 12
Dependent Claim
18 words
Process as claimed in claim 7 wherein said contacting step is conducted for at least one quarter hour.
Claim 13
Dependent Claim
16 words
Process as claimed in claim 7 wherein an excess of the sodium tetraphenyl boron is used.
Claim 14
Dependent Claim
28 words
Process as claimed in claim 7 wherein said nuclear waste solution also contains potassium values and enough of said sodium tetraphenyl boron to also remove said potassium values.
Claim 15
Dependent Claim
23 words
Process as claimed in claim 7 wherein said nuclear waste is a nuclear waste supernate having hazardous levels of cesium, plutonium and strontium.
Claim 16
Dependent Claim
69 words
Process for the removal of cesium, plutonium and strontium values from a nuclear waste solution contaminated with said values which comprises simultaneously contacting said waste solution with sufficient sodium tetraphenylboron to precipitate said cesium and sufficient insoluble sodium titanate to sorb said plutonium and strontium, respectively, from said waste solution and filtering said waste solution to separate said solution which has been substantially decontaminated of cesium, plutonium and strontium.
Claim 17
Dependent Claim
69 words
Process for the removal of cesium, plutonium and strontium values from a nuclear waste solution contaminated with said values which comprises simultaneously contacting said waste solution with sufficient sodium tetraphenylboron to precipitate said cesium and sufficient insoluble sodium titanate to sorb said plutonium and strontium, respectively, from said waste solution and filtering said waste solution to separate said solution which has been substantially decontaminated of cesium, plutonium and strontium.
Claim 18
Dependent Claim
15 words
Process as claimed in claim 13 wherein said filtration is achieved by cross-flow filtration means.
Claim 19
Dependent Claim
32 words
Process as claimed in claim 13 wherein a stream of wash water, approximately equal to the filtrate withdrawal rate from the filter, is continuously added to said wash solution during said filtration.
Claim 20
Dependent Claim
17 words
Process as claimed in claim 13 wherein said solution contains up to 8.0 M of sodium ion.
Claim 21
Dependent Claim
18 words
Process as claimed in claim 13 wherein said contacting step is conducted for at least one quarter hour.
Claim 22
Dependent Claim
16 words
Process as claimed in claim 13 wherein an excess of the sodium tetraphenyl boron is used.
Claim 23
Dependent Claim
20 words
Process as claimed in claim 18 wherein an excess of at least 0.0005 M of sodium tetraphenyl boron is used.
Claim 24
Dependent Claim
28 words
Process as claimed in claim 13 wherein said nuclear waste solution also contains potassium values and enough of said sodium tetraphenyl boron to also remove said potassium values.
Claim 25
Dependent Claim
22 words
Process as claimed in claim 13 wherein said nuclear waste is a nuclear waste supernate hazardous levels of cesium, plutonium and strontium.
References Cited (Backward Citations)
US2982785A
Cited
US4161513A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1987-02-20 | 1987-08-22 | 1988-02-21 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1991-02-20 | 1991-08-22 | 1992-02-21 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1995-02-20 | 1995-08-22 | 1996-02-21 | $7700.00 | Window Closed / Lapsed |