US4424866A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method for production of hydrocarbons from hydrates
Assignee: United States Department of Energy
•
Filing: 1981-09-08
•
Granted: 1984-01-10
•
Expires: 2001-09-08
Abstract
Abstract A method of recovering natural gas entrapped in frozen subsurface gas hydrate formations in arctic regions. A hot supersaturated solution of CaCl 2 or CaBr 2 , or a mixture thereof, is pumped under pressure down a wellbore and into a subsurface hydrate formation so as to hydrostatically fracture the formation. The CaCl 2 /CaBr 2 solution dissolves the solid hydrates and thereby releases the gas entrapped therein. Additionally, the solution contains a polymeric viscosifier, which operates to maintain in suspension finely divided crystalline CaCl 2 /CaBr 2 that precipitates from the supersaturated solution as it is cooled during injection into the formation.
Inventors
- 👤 Patrick L. McGuire
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-08 19:46
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/16; E21B43/17; C; C09; C09K; C09K8/00; C09K8/60; C09K8/62; E21B41/00; E21B41/0099; E21B43/24; E21B43/2405; E21B43/25; E21B43/26; E21B43/27
Claims Analysis
Total Claims: 6
Claim 1
Independent Claim
138 words
A method of producing hydrocarbons from a hydrate formation after a spearhead as been injected into the formation, said method comprising: (a) mixing a hot, "supersaturated" mixture comprising: (1) water; (2) salt selected from the group consisting of calcium chloride (CaC1 2 ), calcium bromide (CaBr 2 ), and mixtures thereof; and (3) at least one polymer viscosifier which is compatible with said salt and which has a shear thinning rheology; and then (b) injecting a volume of at least about 10,000 gallons of said mixture and at a pressure of at least about 1 psi per foot of depth of said formation below the earth surface into a well-bore having perforations located within a hydrate formation, so as to produce a controlled, massive hydrofracture in the formation extending at least about one hundred feet from said well-bore.
Claim 2
Independent Claim
138 words
A method of producing hydrocarbons from a hydrate formation after a spearhead as been injected into the formation, said method comprising: (a) mixing a hot, "supersaturated" mixture comprising: (1) water; (2) salt selected from the group consisting of calcium chloride (CaC1 2 ), calcium bromide (CaBr 2 ), and mixtures thereof; and (3) at least one polymer viscosifier which is compatible with said salt and which has a shear thinning rheology; and then (b) injecting a volume of at least about 10,000 gallons of said mixture and at a pressure of at least about 1 psi per foot of depth of said formation below the earth surface into a well-bore having perforations located within a hydrate formation, so as to produce a controlled, massive hydrofracture in the formation extending at least about one hundred feet from said well-bore.
Claim 3
Dependent Claim
56 words
A method according to claim 1, wherein said volume of said mixture is within the range from at least about 10,000 gallons to several hundred thousand gallons and wherein said spearhead comprises a brine comprising water and at least one salt selected from the group consisting of CaC1 2 , CaBr 2 , and mixtures thereof.
Claim 4
Dependent Claim
34 words
A method according to claim 2 and including also the step of adding additional amounts of salt to said mixture after an initial portion of said mixture has been introduced into said hydrate formation.
Claim 5
Dependent Claim
34 words
A method according to claim 3, wherein said hydrate upon reduction of pressure dissociates essentially into water and/or ice and a gas selected from the group consisting of methane, ethane, propane, and mixtures thereof.
Claim 6
Dependent Claim
41 words
A method according to claim 1 or claim 3, wherein said mixture is mixed immediately prior to injecting said mixture into said hydrate formation so as to utilize the heat of hydration of the salt in order to heat said hydrates.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1987-01-09 | 1987-07-11 | 1988-01-10 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1991-01-09 | 1991-07-11 | 1992-01-10 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1995-01-09 | 1995-07-11 | 1996-01-10 | $7700.00 | Window Closed / Lapsed |