Claims Analysis
Total Claims: 14
Claim 1
Independent Claim
212 words
A forced-air heating system comprising a main furnace, an outlet duct for conveying air from the furnace to a space to be heated, a blower for forcing air through the furnace, an auxiliary electric heater disposed so that air flowing through the main furnace flows thereover, first temperature responsive means responsive to inside air temperature, second temperature responsive means responsive to outside air temperature, and control means operable, when the inside air temperature is below a first predetermined level, to activate only said auxiliary electric heater if the outside air temperature is above a second predetermined level and only said main furnace if the outside air temperature is below said second predetermined level, said second predetermined level being selected taking into account electricity demand-temperature dependency such that above said second predetermined temperature level electricity demand is generally at an off-peak level wherein: said auxiliary heater comprises a housing having opposed apertures forming an inlet and an outlet and defining a flow path therebetween, and a plurality of panels arranged to extend across said housing between said apertures and parallel to said flow path to define uninterrupted channels between said inlet and said outlet such that air flows between said panels directly from said inlet to said outlet without passing through said panels.
Claim 2
Dependent Claim
212 words
A forced-air heating system comprising a main furnace, an outlet duct for conveying air from the furnace to a space to be heated, a blower for forcing air through the furnace, an auxiliary electric heater disposed so that air flowing through the main furnace flows thereover, first temperature responsive means responsive to inside air temperature, second temperature responsive means responsive to outside air temperature, and control means operable, when the inside air temperature is below a first predetermined level, to activate only said auxiliary electric heater if the outside air temperature is above a second predetermined level and only said main furnace if the outside air temperature is below said second predetermined level, said second predetermined level being selected taking into account electricity demand-temperature dependency such that above said second predetermined temperature level electricity demand is generally at an off-peak level wherein: said auxiliary heater comprises a housing having opposed apertures forming an inlet and an outlet and defining a flow path therebetween, and a plurality of panels arranged to extend across said housing between said apertures and parallel to said flow path to define uninterrupted channels between said inlet and said outlet such that air flows between said panels directly from said inlet to said outlet without passing through said panels.
Claim 3
Dependent Claim
20 words
A forced-air heating system as claimed in claim 1, wherein the auxiliary electric heater is mounted in said outlet duct.
Claim 4
Dependent Claim
30 words
A forced-air heating system as claimed in claim 1, wherein said first and second means comprise first and second thermostats respectively which switch at said first and second predetermined levels.
Claim 5
Dependent Claim
62 words
A forced-air heating system as claimed in claim 3, wherein said second thermostat has a first contact in series with a circuit for activating the burner and a second contact in series with a circuit for activating said auxiliary heater, said second thermostat being arranged such that above said second predetermined temperature level said first contact opens and said second contact closes.
Claim 6
Dependent Claim
77 words
A forced-air heating system as claimed in claim 4, wherein said first and second contacts of said second thermostat are in series with a normally closed contact of the first thermostat, which is arranged such that when the inside temperature is below a first predetermined temperature level, either said main furnace or said auxiliary heater is activated according to whether the outside temperature is below said second mentioned predetermined temperature level as determined by said second thermostat.
Claim 7
Dependent Claim
27 words
A forced-air heating system as claimed in claim 4, wherein the second contact is in series with a relay which energizes said electrical heater and said blower.
Claim 8
Dependent Claim
56 words
A forced-air heating system as claimed in claim 6, further comprising means for overriding said second temperature responsive means during certain periods and activating said main furnace instead of the auxiliary heater when the inside temperature is below said first predetermined level and the outside temperature is above the second predetermined level during said certain periods.
Claim 9
Dependent Claim
30 words
A forced-air heating system as claimed in claim 7, wherein said overriding means comprises a clock operative to override said second temperature responsive means during predetermined periods of the day.
Claim 10
Dependent Claim
20 words
A forced-air heating system as claimed in claim 7, wherein said overriding means comprises means for detecting a voltage reduction.
Claim 11
Dependent Claim
23 words
A forced-air heating system as claimed in claim 7, wherein said overriding means comprises means for receiving signals transmitted from a remote location.
Claim 12
Dependent Claim
24 words
A forced-air heating system as claimed in claim 7, wherein said receiving means is adapted to detect signals impressed on the main supply voltage.
Claim 13
Dependent Claim
29 words
A forced-air heating system as claimed in claim 1, wherein said panels are formed by arranging a strip resistive material in a sinuous path between opposed insulating support members.
Claim 14
Dependent Claim
36 words
A forced-air heating system as claimed in claim 12, (any one of claim 34) wherein said panels are formed of a fiber sheet impregnated with a mixture of graphite and carbon to form an area resistor.