Three-stage hydrocracking process

Assignee: Chevron USA Inc
•
Filing: 1981-10-02
•
Granted: 1983-09-13
•
Expires: 2001-10-02
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A hydrocracking process of improved flexibility comprises three hydroprocessing stages and a fractionating zone such that the effluent from the first hydroprocessing stage is fractionated into a first fraction consisting of gasoline and lower boiling components, a second fraction, the residuum, having a normal boiling point greater than about 700° F. (370° C.), and a third fraction, the middle and heavy distillate, consisting of the remainder of the effluent of the first hydroprocessing stage. The second fraction undergoes hydrocracking in a second hydroprocessing stage with recycle of the effluent from said second hydroprocessing stage to the fractionation zone, and the third fraction undergoes hydrocracking in a third hydrocracking stage.

Inventors

  • 👤 Robert W. Bachtel
  • 👤 Dennis R. Cash

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-04 18:10
CPC Classifications
C; C10; C10G; C10G65/00; C10G65/02; C10G65/10; C10G2300/00; C10G2300/10; C10G2300/107

Claims Analysis

Total Claims: 5
Claim 1
Independent Claim 288 words
A three-stage hydrocracking process adapted for maximizing the yield of naphtha, or of maximizing the yield of certain other distillate fractions from a feedstock containing hydrocarbons boiling at temperatures greater than about 360° F. (180° C.), comprising the steps of: (a) contacting said feedstock in a first hydroprocessing zone with a first hydroprocessing catalyst under conditions comprising a temperature of about 650°-850° F., a total pressure of about 1000-3000 psig, a hydrogen supply of about 500-2000 SCF per barrel of feedstock and a LHSV of 0.3-2.5, (b) fractionating the effluent from said first hydroprocessing zone in a fractionating zone into a first fraction consisting of naphtha and lower boiling components, a second fraction, the residuum, consisting of components having a normal boiling point greater than about 700° F., and a third fraction, the middle and heavy distillate, consisting of the remainder of the effluent of said first hydroprocessing zone, (c) contacting said second fraction in a second hydroprocessing zone with a hydrocracking catalyst under hydrocracking conditions comprising a temperature of about 600°-850° F., a total pressure of about 1000-3000 psig, a hydrogen supply of about 500-1500 SCF per barrel of feed and a total LHSV of about 0.8-3.0, (d) recycling the effluent of said second hydroprocessing zone to said fractionation zone, (e) contacting said third fraction in a third hydroprocessing zone with a zeolite-containing hydrocracking catalyst of higher cracking activity than the catalysts of said first and second hydroprocessing zones, under hydrocracking conditions comprising a temperature of about 550°-850° F., a total pressure of about 800-2500 psig and a hydrogen supply of about 300-1000 SCF per barrel of feedstock, and (f) recycling at least a portion of the effluent from said third hydroprocessing zone to said fractionation zone.
Claim 2
Dependent Claim 288 words
A three-stage hydrocracking process adapted for maximizing the yield of naphtha, or of maximizing the yield of certain other distillate fractions from a feedstock containing hydrocarbons boiling at temperatures greater than about 360° F. (180° C.), comprising the steps of: (a) contacting said feedstock in a first hydroprocessing zone with a first hydroprocessing catalyst under conditions comprising a temperature of about 650°-850° F., a total pressure of about 1000-3000 psig, a hydrogen supply of about 500-2000 SCF per barrel of feedstock and a LHSV of 0.3-2.5, (b) fractionating the effluent from said first hydroprocessing zone in a fractionating zone into a first fraction consisting of naphtha and lower boiling components, a second fraction, the residuum, consisting of components having a normal boiling point greater than about 700° F., and a third fraction, the middle and heavy distillate, consisting of the remainder of the effluent of said first hydroprocessing zone, (c) contacting said second fraction in a second hydroprocessing zone with a hydrocracking catalyst under hydrocracking conditions comprising a temperature of about 600°-850° F., a total pressure of about 1000-3000 psig, a hydrogen supply of about 500-1500 SCF per barrel of feed and a total LHSV of about 0.8-3.0, (d) recycling the effluent of said second hydroprocessing zone to said fractionation zone, (e) contacting said third fraction in a third hydroprocessing zone with a zeolite-containing hydrocracking catalyst of higher cracking activity than the catalysts of said first and second hydroprocessing zones, under hydrocracking conditions comprising a temperature of about 550°-850° F., a total pressure of about 800-2500 psig and a hydrogen supply of about 300-1000 SCF per barrel of feedstock, and (f) recycling at least a portion of the effluent from said third hydroprocessing zone to said fractionation zone.
Claim 3
Dependent Claim 33 words
A process according to claim 1 wherein the effluent from said first hydroprocessing zone is combined with the second fraction of said fractionating zone before both are hydrocracked in said second hydroprocessing zone.
Claim 4
Dependent Claim 32 words
A process according to claim 1 wherein said third fraction comprises a middle distillate fraction and a heavy distillate fraction and only said heavy fraction is treated in said third hydrocracking zone.
Claim 5
Dependent Claim 39 words
A process according to claim 3 wherein said mid-distillate fraction has a normal boiling point in the range of about 360°-480° F. and said heavy distillate fraction has a nornal boiling point in the range of about 480°-700° F.

References Cited (Backward Citations)

US2945800A Cited
US2945801A Cited
US3549515A Cited
US3702818A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1986-09-12 1987-03-14 1987-09-13 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1990-09-12 1991-03-14 1991-09-13 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1994-09-12 1995-03-14 1995-09-13 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag