Method of constructing an artificial island and island constructed by the same
Assignee: AMSTERDAMSE BALLAST BAGGER EN GROND AMSTERDAM BALLAST DREDGING BV
•
Filing: 1980-10-06
•
Granted: 1983-08-09
•
Expires: 2000-10-06
Abstract
Abstract An artificial island is constructed by depositing material such as sand, y or the like on the building site on the bottom and by providing inhibiting means formed by branched, relatively spaced elements positioned on the building site, to reduce the rate of effluence of the material such as sand, clay or the like along the sea bottom.
Inventors
- 👤 Jan Op den Velde
- 👤 Jan B. Elzerman
- 👤 Klaas Oterdoom
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-31 09:35
CPC Classifications
E; E02; E02B; E02B17/00
Claims Analysis
Total Claims: 7
Claim 1
Independent Claim
124 words
A method of constructing an artificial island by depositing material such as sand, clay or the like on the buildiing site on an under water bottom and by providing inhibiting means formed by branched elements positioned on the building site for reducing the rate of effluence of the material such as sand, clay or the like along the under water bottom, wherein before lowering the branched elements, at least some of said branched elements are weighted with a load adjacent their bottom ends, characterized in that in a step (a) the loaded branched elements are dumped in a standing position from a floating barge onto the under water bottom and that in a subsequent step (b) the material is dumped over said branched elements.
Claim 2
Independent Claim
124 words
A method of constructing an artificial island by depositing material such as sand, clay or the like on the buildiing site on an under water bottom and by providing inhibiting means formed by branched elements positioned on the building site for reducing the rate of effluence of the material such as sand, clay or the like along the under water bottom, wherein before lowering the branched elements, at least some of said branched elements are weighted with a load adjacent their bottom ends, characterized in that in a step (a) the loaded branched elements are dumped in a standing position from a floating barge onto the under water bottom and that in a subsequent step (b) the material is dumped over said branched elements.
Claim 3
Dependent Claim
16 words
A method as claimed in claim 1 wherein loaded branched elements are dumped in subsequent rows.
Claim 4
Dependent Claim
27 words
A method as claimed in claim 1 or 2 wherein an artificial island is built up from layers each layer being deposited in steps (a) and (b).
Claim 5
Dependent Claim
32 words
A method as claimed in claim 1, 2 or 3 characterized in that a group of branched elements is connected to a line which is locally loaded at at least two spots.
Claim 6
Independent Claim
189 words
The method of constructing an earth mass from the bottom up, particularly in the open sea, with a minimum amount of material, which comprises the steps of: (a) forming a predetermined array of weighted, branched elements on the sea bottom by dumping such weighted elements overboard at sea level in conformity with such array, said predetermined array being of sufficiently small area as to require a minimum amount of material for the construction; (b) dredging spoil from the sea bottom at a site remote from said array and discharging such spoil to settle downwardly within the area encompassing said array whereby there is minimal spreading of spoil beyond the confines of the array; (c) forming a further array of weighted, branched elements on the spoil deposited in step (b) by dumping such weighted elements overboard at sea level in conformity with such further array, said further array having a boundary just inside the boundary of the previous array; (d) dredging more spoil as in step (b) and discharging it onto the array of step (c); and (e) repeating steps (c) and (d) until the construction reaches a desired level.
Claim 7
Independent Claim
189 words
The method of constructing an earth mass from the bottom up, particularly in the open sea, with a minimum amount of material, which comprises the steps of: (a) forming a predetermined array of weighted, branched elements on the sea bottom by dumping such weighted elements overboard at sea level in conformity with such array, said predetermined array being of sufficiently small area as to require a minimum amount of material for the construction; (b) dredging spoil from the sea bottom at a site remote from said array and discharging such spoil to settle downwardly within the area encompassing said array whereby there is minimal spreading of spoil beyond the confines of the array; (c) forming a further array of weighted, branched elements on the spoil deposited in step (b) by dumping such weighted elements overboard at sea level in conformity with such further array, said further array having a boundary just inside the boundary of the previous array; (d) dredging more spoil as in step (b) and discharging it onto the array of step (c); and (e) repeating steps (c) and (d) until the construction reaches a desired level.
References Cited (Backward Citations)
US219899A
Cited
US465968A
Cited
US864481A
Cited
US1129719A
Cited
US1168547A
Cited
US1146229A
Cited
US1841594A
Cited
US1847043A
Cited
US1973821A
Cited
US3731492A
Cited
US4080793A
Cited
US4080797A
Cited
US4118937A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1986-08-08 | 1987-02-07 | 1987-08-09 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1990-08-08 | 1991-02-07 | 1991-08-09 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1994-08-08 | 1995-02-07 | 1995-08-09 | $7700.00 | Window Closed / Lapsed |