← Back to Patent Explorer
US4377208A Expired / Lapsed US ⏱️ 0.0 years remaining

Recovery of natural gas from deep brines

Assignee: Individual
•
Filing: 1980-11-28
•
Granted: 1983-03-22
•
Expires: 2000-11-28
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method is described for circulating hydrostatically pressured or geopressured brines so that dissolved methane in the brines can be recovered within the wellpipe. All processes take place downhole or in the surrounding briny formations, and the circulation is powered wholly or in large part by the pressure on the brine and natural compressive forces in the formation.

Inventors

  • 👤 Guy R. B. Elliott
  • 👤 Nicholas E. Vanderborgh
  • 👤 Milton W. McDaniel

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 20:48
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/34; E21B43/38; E21B43/12; E21B43/121; E21B43/35

Claims Analysis

Total Claims: 8
Claim 1
Independent Claim 100 words
A method of recovering natural gas from solution in hot brines in which circulation of the brine and recovery of the dissolved natural gas is powered by the expansion of natural gas released from solution in the brine comprising: (a) injecting a gas into a wellpipe to displace brine, (b) releasing the injected gas, (c) allowing methane-containing brine to flow into a pumping system thereby releasing the natural gas, (d) maintaining a pressure of natural gas greater than the vapor pressure of saturated steam over the brine at formation temperature, and (e) injecting the spent brine back into a formation.
Claim 2
Independent Claim 100 words
A method of recovering natural gas from solution in hot brines in which circulation of the brine and recovery of the dissolved natural gas is powered by the expansion of natural gas released from solution in the brine comprising: (a) injecting a gas into a wellpipe to displace brine, (b) releasing the injected gas, (c) allowing methane-containing brine to flow into a pumping system thereby releasing the natural gas, (d) maintaining a pressure of natural gas greater than the vapor pressure of saturated steam over the brine at formation temperature, and (e) injecting the spent brine back into a formation.
Claim 3
Dependent Claim 33 words
The method of claim 1 in which solids precipitated by cooling of methane-containing brines are removed through a cap at the top of the wellpipe that allow ready access to the precipitated solids.
Claim 4
Dependent Claim 24 words
The method of claim 1 in which circulation in the said pumping system is stopped by slow release of methane out of the wellpipe.
Claim 5
Dependent Claim 101 words
The method of claim 1 in which the said pumping system comprises two or more coupled pumps of turbines operating within a wellpipe simultaneously, and (a) accepting steam-saturated, methane-containing brine from a porous, subsurface formation, (b) using the said brine as a working fluid in a first pump or turbine, (c) expanding the fluid by releasing dissolved natural gas, (d) causing the expanding fluid to supply all or a portion of the work required to operate a second pump or turbine which reinjects the spent brine into a disposal formation, and (e) delivering the released gas to the surface for recovery.
Claim 6
Dependent Claim 36 words
The method of claim 4 in which two or more pumping systems of coupled pumps or turbines are operated simultaneously, with each system being independently fed methane-containing brine from different regions adjacent to a single wellpipe.
Claim 7
Dependent Claim 23 words
The method of claim 4 in which circulation in the said pumping system is stopped by adding brine to the gas delivery pipe.
Claim 8
Dependent Claim 31 words
The method of claim 4 in which the coupled pumps of turbines injecting the spent brine back into the formation are driven by the release of gas in the geopressured brine.

References Cited (Backward Citations)

US2018700A Cited
US3782468A Cited
US4149596A Cited
US4149598A Cited
US4131161A Cited
US4296810A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1986-03-21 1986-09-20 1987-03-22 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1990-03-21 1990-09-20 1991-03-22 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1994-03-21 1994-09-20 1995-03-22 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag