US4369114A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Adsorption process with resin transfer
Assignee: Bayer AG
•
Filing: 1981-05-26
•
Granted: 1983-01-18
•
Expires: 2001-05-26
Abstract
Abstract Countercurrent process for the treatment of liquids with adsorbents in a adsorption-filter the space of which is divided by trays which are permeable to liquids into at least 2 chambers, in which process before and/or during the charging of the adsorbent in the upward flow, the regeneration of the charged adsorbent in the downward flow and the backwasting in the upward flow particular levels to which the industrial chambers are filled are established by transferring adsorbent from one chamber to the adjacent chamber.
Inventors
- 👤 Gunter Siegers
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-06 17:55
CPC Classifications
B; B01; B01J; B01J47/00; B01J47/10; B01D; B01D15/00; B01D15/02; B01J47/02; B01J47/026; B01J49/00; B01J49/10; B01D15/08; B01D15/10; B01D15/18; B01D15/1892
Claims Analysis
Total Claims: 3
Claim 1
Independent Claim
310 words
In the countercurrent process for the treatment of liquids with an ion exchanger the volume of which decreases on charging and increases on regeneration, by charging this ion exchanger in upward flow, the lower part of the ion exchanger mass being in the form of a fluidized bed and the upper part being in the form of a fixed bed, regenerating the charged ion exchanger in downward flow and backwashing in upward flow, the improvement comprising (a) distributing the ion exchanger within the ion exchange filter between 2 or 3 chambers which are separated from each other by trays which are permeable to liquid, and of which chambers adjacent chambers are connected to one another by a pipeline which permits the transfer of the ion exchanger and has a shut-off organ; (b) conveying the ion exchanger into the individual chambers, or removing it from them, within the filter before and/or during the individual phases of operation, via the pipeline which permit transfer of the ion exchanger, in an amount such that during charging, the chamber through which the liquid to be treated flows last is filled to the extent of 80 to 98% by volume relative to the volume of the chamber, with ion exchanger in the form of a fixed bed, and that during regeneration, this chamber through which the liquid flowed last is uniformly filled to the extent of 80 to 100% by volume, relative to the chamber volume, with ion exchanger and that, during backwashing, the backwashing space in the chamber to be backwashed is 30 to 100% by volume, relative to the volume of the ion exchanger in the chamber to be backwashed; and (c) using for transfer of the ion exchanger from one chamber into the other the liquid to be treated during charging, the regeneration agent during regeneration and the backwashing liquid during backwashing.
Claim 2
Dependent Claim
310 words
In the countercurrent process for the treatment of liquids with an ion exchanger the volume of which decreases on charging and increases on regeneration, by charging this ion exchanger in upward flow, the lower part of the ion exchanger mass being in the form of a fluidized bed and the upper part being in the form of a fixed bed, regenerating the charged ion exchanger in downward flow and backwashing in upward flow, the improvement comprising (a) distributing the ion exchanger within the ion exchange filter between 2 or 3 chambers which are separated from each other by trays which are permeable to liquid, and of which chambers adjacent chambers are connected to one another by a pipeline which permits the transfer of the ion exchanger and has a shut-off organ; (b) conveying the ion exchanger into the individual chambers, or removing it from them, within the filter before and/or during the individual phases of operation, via the pipeline which permit transfer of the ion exchanger, in an amount such that during charging, the chamber through which the liquid to be treated flows last is filled to the extent of 80 to 98% by volume relative to the volume of the chamber, with ion exchanger in the form of a fixed bed, and that during regeneration, this chamber through which the liquid flowed last is uniformly filled to the extent of 80 to 100% by volume, relative to the chamber volume, with ion exchanger and that, during backwashing, the backwashing space in the chamber to be backwashed is 30 to 100% by volume, relative to the volume of the ion exchanger in the chamber to be backwashed; and (c) using for transfer of the ion exchanger from one chamber into the other the liquid to be treated during charging, the regeneration agent during regeneration and the backwashing liquid during backwashing.
Claim 3
Dependent Claim
28 words
The process of claim 1, wherein the backwashing space is 40 to 50% by volume, relative to the volume of ion exchanger in the chamber to be backwashed.
References Cited (Backward Citations)
US2632720A
Cited
US2801966A
Cited
US2855364A
Cited
US3458436A
Cited
DE1442689C3
Cited
US3813333A
Cited
US3846298A
Cited
US3960721A
Cited
US4238325A
Cited
US4233158A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1986-01-17 | 1986-07-19 | 1987-01-18 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1990-01-17 | 1990-07-19 | 1991-01-18 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1994-01-17 | 1994-07-19 | 1995-01-18 | $7700.00 | Window Closed / Lapsed |