← Back to Patent Explorer
US4366987A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for forming an in situ oil shale retort with horizontal free faces

Assignee: Occidental Oil Shale Inc
•
Filing: 1980-11-21
•
Granted: 1983-01-04
•
Expires: 2000-11-21
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method for forming a fragmented permeable mass of formation particles in an in situ oil shale retort is provided. A horizontally extending void is excavated in unfragmented formation containing oil shale and a zone of unfragmented formation is left adjacent the void. An array of explosive charges is formed in the zone of unfragmented formation. The array of explosive charges comprises rows of central explosive charges surrounded by a band of outer explosive charges which are adjacent side boundaries of the retort being formed. The powder factor of each outer explosive charge is made about equal to the powder factor of each central explosive charge. The explosive charges are detonated for explosively expanding the zone of unfragmented formation toward the void for forming the fragmented permeable mass of formation particles having a reasonably uniformly distributed void fraction in the in situ oil shale retort.

Inventors

  • 👤 Thomas E. Ricketts
  • 👤 Robert J. Fernandes

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-05 15:27
CPC Classifications
E; E21; E21C; E21C41/00; E21C41/16; E21C41/24; E21B; E21B43/00; E21B43/16; E21B43/24; E21B43/243; E21B43/247; E21B43/248; E21B43/30; E21B43/305

Claims Analysis

Total Claims: 48
Claim 1
Independent Claim 190 words
A method for forming a fragmented permeable mass of formation particles in an in situ oil shale retort in a retort site in a subterranean formation containing oil shale, the in situ oil shale retort site having top, bottom, and side boundaries of unfragmented formation, comprising the steps of: excavating at least one void in the subterranean formation within the boundaries of the retort site, leaving at least one zone of unfragmented formation adjacent such a void; placing an array of spaced apart explosive charges in such a zone of unfragmented formation, the array of explosive charges comprising a plurality of central explosive charges spaced apart from the side boundaries of the retort site and a plurality of outer explosive charges adjacent such a side boundary of the retort site, each such outer explosive charge having a powder factor in the range of from about one-half to less than twice the powder factor of each such central explosive charge; and detonating the explosive charges for explosively expanding the zone of unfragmented formation toward the void for forming a fragmented permeable mass of formation particles in the situ oil shale retort.
Claim 2
Independent Claim 190 words
A method for forming a fragmented permeable mass of formation particles in an in situ oil shale retort in a retort site in a subterranean formation containing oil shale, the in situ oil shale retort site having top, bottom, and side boundaries of unfragmented formation, comprising the steps of: excavating at least one void in the subterranean formation within the boundaries of the retort site, leaving at least one zone of unfragmented formation adjacent such a void; placing an array of spaced apart explosive charges in such a zone of unfragmented formation, the array of explosive charges comprising a plurality of central explosive charges spaced apart from the side boundaries of the retort site and a plurality of outer explosive charges adjacent such a side boundary of the retort site, each such outer explosive charge having a powder factor in the range of from about one-half to less than twice the powder factor of each such central explosive charge; and detonating the explosive charges for explosively expanding the zone of unfragmented formation toward the void for forming a fragmented permeable mass of formation particles in the situ oil shale retort.
Claim 3
Dependent Claim 33 words
The method according to claim 1 wherein the actual depth of burial of such an outer explosive charge is about equal to the actual depth of burial of such a central explosive charge.
Claim 4
Dependent Claim 28 words
The method according to claim 1 wherein each such outer explosive charge has a powder factor about equal to the powder factor of each such central explosive charge.
Claim 5
Dependent Claim 39 words
The method according to claim 1 wherein such outer and central explosive charges are columnar explosive charges and each such outer explosive charge has a column length about equal to the column length of each such central explosive charge.
Claim 6
Dependent Claim 33 words
The method according to claim 4 wherein the column length of each such outer and central explosive charge is about equal to one-half the thickness of the zone of unfragmented formation being expanded.
Claim 7
Dependent Claim 25 words
The method according to claim 1 wherein the distance between adjacent outer explosive charges is about equal to the distance between adjacent central explosive charges.
Claim 8
Dependent Claim 32 words
The method according to claim 6 wherein the distance between such an outer explosive charge and an adjacent central explosive charge is about equal to the distance between adjacent central explosive charges.
Claim 9
Independent Claim 172 words
A method for explosively expanding formation toward a void in a subterranean formation, comprising the steps of: excavating at least one void in the subterranean formation, such a void bounded by generally horizontally extending zones of unfragmented formation above and below the void, the surface of each such zone of unfragmented formation bounding the void forming a free face towards which such formation is to be expanded; placing an array of horizontally spaced apart explosive charges in at least one of the zones of unfragmented formation, the array of explosive charges comprising a plurality of central explosive charges spaced apart from the plane of the side walls of the void and a plurality of outer explosive charges surrounding the central charges, the powder factor of such an outer explosive charge being in the range of from about one-half to about one and one-half times the powder factor of such a central explosive charge; and detonating the explosive charges for explosively expanding such a zone of unfragmented formation toward the horizontally extending void.
Claim 10
Independent Claim 172 words
A method for explosively expanding formation toward a void in a subterranean formation, comprising the steps of: excavating at least one void in the subterranean formation, such a void bounded by generally horizontally extending zones of unfragmented formation above and below the void, the surface of each such zone of unfragmented formation bounding the void forming a free face towards which such formation is to be expanded; placing an array of horizontally spaced apart explosive charges in at least one of the zones of unfragmented formation, the array of explosive charges comprising a plurality of central explosive charges spaced apart from the plane of the side walls of the void and a plurality of outer explosive charges surrounding the central charges, the powder factor of such an outer explosive charge being in the range of from about one-half to about one and one-half times the powder factor of such a central explosive charge; and detonating the explosive charges for explosively expanding such a zone of unfragmented formation toward the horizontally extending void.
Claim 11
Dependent Claim 29 words
The method according to claim 8 wherein the powder factor of each such outer explosive charge is about equal to the powder factor of each such central explosive charge.
Claim 12
Dependent Claim 38 words
The method according to claim 8 wherein the distance from the plane of such a side wall of the void to an outer explosive charge is no greater than about one-half the distance between adjacent outer explosive charges.
Claim 13
Dependent Claim 22 words
The method according to claim 8 wherein the outer explosive charges are adjacent the plane of the side walls of the void.
Claim 14
Dependent Claim 32 words
The method according to claim 11 wherein the distance from such an outer explosive charge to an adjacent central explosive charge is about equal to the distance between adjacent central explosive charges.
Claim 15
Dependent Claim 25 words
The method according to claim 8 wherein the distance between adjacent outer explosive charges is about equal to the distance between adjacent central explosive charges.
Claim 16
Independent Claim 194 words
A method for forming a fragmented permeable mass of formation particles in an in situ oil shale retort in a retort site in a subterranean formation containing oil shale, the in situ oil shale retort site having top, bottom, and side boundaries of unfragmented formation comprising the steps of: excavating at least one horizontally extending void in the subterranean formation within the boundaries of the retort site, leaving zones of unfragmented formation above and below such a void; placing an array of horizontally spaced apart substantially vertical columnar explosive charges in at least one of the zones of unfragmented formation, the array of explosive charges comprising a plurality of central explosive charges spaced apart from the side boundaries of the retort site and a plurality of outer explosive charges adjacent the side boundaries of the retort site surrounding the central charges, such an outer explosive charge having a powder factor about equal to the powder factor of such a central explosive charge; and detonating the explosive charges for explosively expanding the zone of unfragmented formation toward the void for forming a fragmented permeable mass of formation particles in the in situ oil shale retort.
Claim 17
Independent Claim 194 words
A method for forming a fragmented permeable mass of formation particles in an in situ oil shale retort in a retort site in a subterranean formation containing oil shale, the in situ oil shale retort site having top, bottom, and side boundaries of unfragmented formation comprising the steps of: excavating at least one horizontally extending void in the subterranean formation within the boundaries of the retort site, leaving zones of unfragmented formation above and below such a void; placing an array of horizontally spaced apart substantially vertical columnar explosive charges in at least one of the zones of unfragmented formation, the array of explosive charges comprising a plurality of central explosive charges spaced apart from the side boundaries of the retort site and a plurality of outer explosive charges adjacent the side boundaries of the retort site surrounding the central charges, such an outer explosive charge having a powder factor about equal to the powder factor of such a central explosive charge; and detonating the explosive charges for explosively expanding the zone of unfragmented formation toward the void for forming a fragmented permeable mass of formation particles in the in situ oil shale retort.
Claim 18
Dependent Claim 32 words
The method according to claim 14 wherein the distance between such an outer explosive charge and an adjacent central explosive charge is about equal to the distance between adjacent central explosive charges.
Claim 19
Dependent Claim 33 words
The method according to claim 14 wherein the actual depth of burial of such an outer explosive charge is about equal to the actual depth of burial of such a central explosive charge.
Claim 20
Dependent Claim 25 words
The method according to claim 14 wherein the distance between adjacent outer explosive charges is about equal to the distance between adjacent central explosive charges.
Claim 21
Dependent Claim 24 words
The method according to claim 14 wherein the distance between adjacent outer explosive charges is less than the distance between the central explosive charges.
Claim 22
Dependent Claim 29 words
The method according to claim 14 wherein the column length of such an outer explosive charge is about equal to the column length of such a central explosive charge.
Claim 23
Independent Claim 245 words
A method for forming a fragmented permeable mass of formation particles in an in situ oil shale retort in a retort site in a subterranean formation containing oil shale, the in situ oil shale retort site having top, bottom, and side boundaries of unfragmented formation, comprising the steps of: excavating at least one generally horizontally extending void in the subterranean formation, leaving zones of unfragmented formation above and below such a void; forming an array of horizontally spaced apart blastholes in at least one of the zones of unfragmented formation, the array of blastholes comprising a plurality of central blastholes spaced apart from the side boundaries of the retort site and a plurality of outer blastholes adjacent such a side boundary of the retort site; loading the central blastholes with explosive charges to thereby form a plurality of central explosive charges in such central blastholes, each such explosive charge extending across the entire horizontal cross-section of its blasthole; loading the outer blastholes with explosive charges to thereby form a plurality of outer explosive charges in such outer blastholes, each such explosive charge extending across the entire horizontal cross-section of its blasthole, each outer explosive charge having a powder factor about equal to the powder factor of each central explosive charge; and detonating the outer and central explosive charges for explosively expanding the zone of unfragmented formation toward the void for forming a fragmented permeable mass of formation particles in the in situ oil shale retort.
Claim 24
Independent Claim 245 words
A method for forming a fragmented permeable mass of formation particles in an in situ oil shale retort in a retort site in a subterranean formation containing oil shale, the in situ oil shale retort site having top, bottom, and side boundaries of unfragmented formation, comprising the steps of: excavating at least one generally horizontally extending void in the subterranean formation, leaving zones of unfragmented formation above and below such a void; forming an array of horizontally spaced apart blastholes in at least one of the zones of unfragmented formation, the array of blastholes comprising a plurality of central blastholes spaced apart from the side boundaries of the retort site and a plurality of outer blastholes adjacent such a side boundary of the retort site; loading the central blastholes with explosive charges to thereby form a plurality of central explosive charges in such central blastholes, each such explosive charge extending across the entire horizontal cross-section of its blasthole; loading the outer blastholes with explosive charges to thereby form a plurality of outer explosive charges in such outer blastholes, each such explosive charge extending across the entire horizontal cross-section of its blasthole, each outer explosive charge having a powder factor about equal to the powder factor of each central explosive charge; and detonating the outer and central explosive charges for explosively expanding the zone of unfragmented formation toward the void for forming a fragmented permeable mass of formation particles in the in situ oil shale retort.
Claim 25
Dependent Claim 32 words
The method according to claim 20 wherein such an outer explosive charge has an actual depth of burial about equal to the actual depth of burial of such a central explosive charge.
Claim 26
Dependent Claim 29 words
The method according to claim 20 wherein the column length of such an outer explosive charge is about equal to the column length of such a central explosive charge.
Claim 27
Dependent Claim 25 words
The method according to claim 20 wherein the spacing distance between outer explosive charges is about equal to the spacing distance between central explosive charges.
Claim 28
Dependent Claim 32 words
The method according to claim 20 wherein the distance between such an outer explosive charge and an adjacent central explosive charge is about equal to the distance between adjacent central explosive charges.
Claim 29
Dependent Claim 32 words
The method according to claim 20 wherein the column length of the outer and central explosive charges is about equal to one-half the thickness of the zone of unfragmented formation being expanded.
Claim 30
Independent Claim 231 words
A method for forming a fragmented permeable mass of formation particles in an in situ oil shale retort in a retort site in a subterranean formation containing oil shale, the in situ oil shale retort site having top, bottom, and side boundaries of unfragmented formation, comprising the steps of: excavating at least one generally horizontally extending void in the subterranean formation within the boundaries of the retort site, leaving zones of unfragmented formation above and below such a void; forming an array of horizontally spaced apart substantially vertical blastholes in at least one of the zones of unfragmented formation, the array of blastholes comprising a plurality of central blastholes spaced apart from the side boundaries of the retort site and a plurality of outer blastholes adjacent such a side boundary of the retort site; loading the central blastholes with explosive for forming a vertical columnar central explosive charge in each such central blasthole; loading the outer blastholes with explosive for forming a vertical columnar outer explosive charge in each such outer blasthole, each outer explosive charge having a powder factor in the range of from about one-half to less than twice the powder factor of each central explosive charge; and detonating the explosive charges for explosively expanding the zone of unfragmented formation toward the void for forming a fragmented permeable mass of formation particles in the in situ oil shale retort.
Claim 31
Independent Claim 231 words
A method for forming a fragmented permeable mass of formation particles in an in situ oil shale retort in a retort site in a subterranean formation containing oil shale, the in situ oil shale retort site having top, bottom, and side boundaries of unfragmented formation, comprising the steps of: excavating at least one generally horizontally extending void in the subterranean formation within the boundaries of the retort site, leaving zones of unfragmented formation above and below such a void; forming an array of horizontally spaced apart substantially vertical blastholes in at least one of the zones of unfragmented formation, the array of blastholes comprising a plurality of central blastholes spaced apart from the side boundaries of the retort site and a plurality of outer blastholes adjacent such a side boundary of the retort site; loading the central blastholes with explosive for forming a vertical columnar central explosive charge in each such central blasthole; loading the outer blastholes with explosive for forming a vertical columnar outer explosive charge in each such outer blasthole, each outer explosive charge having a powder factor in the range of from about one-half to less than twice the powder factor of each central explosive charge; and detonating the explosive charges for explosively expanding the zone of unfragmented formation toward the void for forming a fragmented permeable mass of formation particles in the in situ oil shale retort.
Claim 32
Dependent Claim 36 words
The method according to claim 26 wherein each such outer explosive charge extends across the entire horizontal cross-section of its blasthole and each such central explosive charge extends across the entire horizontal cross-section of its blasthole.
Claim 33
Dependent Claim 29 words
The method according to claim 26 wherein the distance between such an outer blasthole and an adjacent central blasthole is about equal to the distance between adjacent central blastholes.
Claim 34
Dependent Claim 23 words
The method according to claim 27 wherein the distance between adjacent outer blastholes is about equal to the distance between adjacent central blastholes.
Claim 35
Dependent Claim 27 words
The method according to claim 27 wherein the powder feactor of each outer explosive charge is about equal to the powder factor of each central explosive charge.
Claim 36
Independent Claim 214 words
A method for forming a fragmented permeable mass of formation particles in an in situ oil shale retort in a retort site in a subterranean formation containing oil shale, the in situ oil shale retort site having top, bottom, and side boundaries of unfragmented formation, comprising the steps of: excavating at least one generally horizontally extending void in the subterranean formation within the boundaries of the retort site, leaving zones of unfragmented formation above and below such a void; forming at least one row of horizontally spaced apart central explosive charges remote from the side boundaries of the retort site in at least one of the zones of unfragmented formation; forming a band of horizontally spaced apart outer explosive charges surrounding the central explosive charges in such a zone of unfragmented formation, the band of outer explosive charges comprising a row of outer explosive charges adjacent such a side boundary of the retort site, the powder factor of such a row of outer explosive charges being about equal to the powder factor of such a row of central explosive charges; and detonating the explosive charges for explosively expanding the zone of unfragmented formation toward the horizontally extending void for forming a fragmented permeable mass of formation particles in the in situ oil shale retort.
Claim 37
Independent Claim 214 words
A method for forming a fragmented permeable mass of formation particles in an in situ oil shale retort in a retort site in a subterranean formation containing oil shale, the in situ oil shale retort site having top, bottom, and side boundaries of unfragmented formation, comprising the steps of: excavating at least one generally horizontally extending void in the subterranean formation within the boundaries of the retort site, leaving zones of unfragmented formation above and below such a void; forming at least one row of horizontally spaced apart central explosive charges remote from the side boundaries of the retort site in at least one of the zones of unfragmented formation; forming a band of horizontally spaced apart outer explosive charges surrounding the central explosive charges in such a zone of unfragmented formation, the band of outer explosive charges comprising a row of outer explosive charges adjacent such a side boundary of the retort site, the powder factor of such a row of outer explosive charges being about equal to the powder factor of such a row of central explosive charges; and detonating the explosive charges for explosively expanding the zone of unfragmented formation toward the horizontally extending void for forming a fragmented permeable mass of formation particles in the in situ oil shale retort.
Claim 38
Dependent Claim 26 words
The method according to claim 31 wherein each such central explosive charge has about the same actual depth of burial as each such outer explosive charge.
Claim 39
Dependent Claim 40 words
The method according to claim 31 wherein the central and outer explosive charges are substantially vertical columnar explosive charges and each such central explosive charge has a charge length equal to the charge length of each such outer explosive charge.
Claim 40
Dependent Claim 32 words
The method according to claim 31 wherein the distance between such an outer explosive charge and an adjacent central explosive charge is about equal to the distance between adjacent central explosive charges.
Claim 41
Dependent Claim 25 words
The method according to claim 34 wherein the distance between adjacent outer explosive charges is about equal to the distance between adjacent central explosive charges.
Claim 42
Independent Claim 259 words
A method for forming a fragmented permeable mass of formation particles in an in situ oil shale retort in a retort site in a subterranean formation containing oil shale, the in situ oil shale retort site having top, bottom, and side boundaries of unfragmented formation, comprising the steps of: excavating at least one generally horizontally extending void in the subterranean formation within the boundaries of the retort site, leaving zones of unfragmented formation above and below such a void; forming a central array of blastholes comprising rows of spaced apart substantially vertical central blastholes in at least one of the zones of unfragmented formation; forming a band of substantially vertical outer blastholes surrounding the central blastholes in such a zone of unfragmented formation, the band of outer blastholes comprising a row of outer blastholes along such a side boundary of the retort site; loading the central blastholes with explosive for forming a vertical columnar central explosive charge in such a central blasthole extending across the entire horizontal cross-section of the central blasthole; loading the outer blastholes with explosive for forming a vertical columnar outer explosive charge in such an outer blasthole extending across the entire horizontal cross-section of the outer blasthole, the powder factor of each row of outer explosive charges being about equal to the powder factor of each row of central explosive charges; and detonating the explosive charges for explosively expanding the zone of unfragmented formation toward the horizontally extending void for forming a fragmented permeable mass of formation particles in the in situ oil shale retort.
Claim 43
Independent Claim 259 words
A method for forming a fragmented permeable mass of formation particles in an in situ oil shale retort in a retort site in a subterranean formation containing oil shale, the in situ oil shale retort site having top, bottom, and side boundaries of unfragmented formation, comprising the steps of: excavating at least one generally horizontally extending void in the subterranean formation within the boundaries of the retort site, leaving zones of unfragmented formation above and below such a void; forming a central array of blastholes comprising rows of spaced apart substantially vertical central blastholes in at least one of the zones of unfragmented formation; forming a band of substantially vertical outer blastholes surrounding the central blastholes in such a zone of unfragmented formation, the band of outer blastholes comprising a row of outer blastholes along such a side boundary of the retort site; loading the central blastholes with explosive for forming a vertical columnar central explosive charge in such a central blasthole extending across the entire horizontal cross-section of the central blasthole; loading the outer blastholes with explosive for forming a vertical columnar outer explosive charge in such an outer blasthole extending across the entire horizontal cross-section of the outer blasthole, the powder factor of each row of outer explosive charges being about equal to the powder factor of each row of central explosive charges; and detonating the explosive charges for explosively expanding the zone of unfragmented formation toward the horizontally extending void for forming a fragmented permeable mass of formation particles in the in situ oil shale retort.
Claim 44
Dependent Claim 30 words
The method according to claim 36 wherein the spacing distance between an outer blasthole and an adjacent central blasthole is about equal to the spacing distance between the central blastholes.
Claim 45
Dependent Claim 25 words
The method according to claim 36 wherein the spacing distance between the central blastholes is about equal to the spacing distance between the outer blastholes.
Claim 46
Dependent Claim 31 words
The method according to claim 36 wherein the actual depth of burial of each outer explosive charge is about equal to the actual depth of burial of each central explosive charge.
Claim 47
Dependent Claim 32 words
The method according to claim 36 wherein the column length of each outer and central explosive charge is about equal to one-half the thickness of the zone of unfragmented formation being expanded.
Claim 48
Dependent Claim 27 words
The method according to claim 36 wherein the column length of each outer explosive charge is about equal to the column length of each central explosive charge.

References Cited (Backward Citations)

US3466094A Cited
US4025115A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1986-01-03 1986-07-05 1987-01-04 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1990-01-03 1990-07-05 1991-01-04 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1994-01-03 1994-07-05 1995-01-04 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag