Method of protecting the surfaces of concrete structures
Assignee: Philipp Holzmann AG
•
Filing: 1980-11-14
•
Granted: 1982-10-26
•
Expires: 2000-11-14
Abstract
Abstract A method of constructing a poured concrete structure protected from corrosive agents includes applying large-surface sealing elements to one surface of the structure before pouring the concrete. The sealing elements are attached to anchoring elements extending into a region into which concrete is to be poured. When the concrete is poured inside the sealing elements, the sealing elements are anchored in place by the anchoring elements which become set in the concrete. The sealing elements may have a high modulus of elasticity and be relatively rigidly affixed to the structure of may have a low modulus of elasticity and thus require overlapping perimeter areas for sealing of adjacent sealing elements.
Inventors
- 👤 Hans Pause
- 👤 Walter Stiller
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-06 11:02
CPC Classifications
E; E04; E04G; E04G11/00; E04G11/06; E04G11/20; E04G11/28; E04B; E04B1/00; E04B1/62; E04B1/66; Y; Y10; Y10T; Y10T29/00; Y10T29/49; Y10T29/49826; Y10T29/49888
Claims Analysis
Total Claims: 11
Claim 1
Independent Claim
162 words
A method of constructing a poured concrete structure protected from corrosive agents comprising the steps of: applying large surface sealing elements supported by a formwork and defining at least one surface having a component in an upright direction of said concrete structure before pouring said concrete; overlapping perimeter areas of adjacent sealing elements to provide protection to the concrete from liquids flowing under gravity forces; providing anchoring elements on said sealing elements extending into a region into which concrete for said structure is to be poured; attaching climbing rails for a climbing formwork to said anchoring elements; applying a sealing strip having a high modulus of elasticity and great resistance to corrosion in a region of said climbing rails; pouring said concrete inside said sealing elements and said formwork; and setting said concrete whereby said sealing elements become anchored to said structure by said anchoring elements in set concrete whereby said climbing formwork is movable on said rails to another higher position.
Claim 2
Independent Claim
162 words
A method of constructing a poured concrete structure protected from corrosive agents comprising the steps of: applying large surface sealing elements supported by a formwork and defining at least one surface having a component in an upright direction of said concrete structure before pouring said concrete; overlapping perimeter areas of adjacent sealing elements to provide protection to the concrete from liquids flowing under gravity forces; providing anchoring elements on said sealing elements extending into a region into which concrete for said structure is to be poured; attaching climbing rails for a climbing formwork to said anchoring elements; applying a sealing strip having a high modulus of elasticity and great resistance to corrosion in a region of said climbing rails; pouring said concrete inside said sealing elements and said formwork; and setting said concrete whereby said sealing elements become anchored to said structure by said anchoring elements in set concrete whereby said climbing formwork is movable on said rails to another higher position.
Claim 3
Dependent Claim
19 words
A method according to claim 1, wherein said sealing elements are generally planar elements having low modulus of elasticity.
Claim 4
Dependent Claim
13 words
A method according to claim 1, wherein said anchoring elements are parallel webs.
Claim 5
Dependent Claim
13 words
A method according to claim 1, wherein said anchoring elements are pin-type device.
Claim 6
Dependent Claim
14 words
A method according to claim 1, wherein said anchoring elements include a widened end.
Claim 7
Dependent Claim
15 words
A method according to claim 1, wherein said sealing elements have high modulus of elasticity.
Claim 8
Dependent Claim
21 words
A method according to claim 1, further comprising folding said sealing elements to form folds which become anchored in said concrete.
Claim 9
Dependent Claim
26 words
A method according to claim 1, wherein the step of applying employs a sliding apparatus and includes coating a wall of said sliding apparatus with Teflon.
Claim 10
Dependent Claim
41 words
A method according to claim 1, wherein the step of applying includes sealing adjacent sealing elements with a diffusion resistant seal and relieving vapor pressure from a vicinity of said at least one surface toward a second surface of said structure.
Claim 11
Dependent Claim
20 words
A method according to claim 1, further comprising stepping adjacent edges of said sealing elements and overlapping the stepped edges.
References Cited (Backward Citations)
US1242039A
Cited
US1956354A
Cited
US1915896A
Cited
US2273699A
Cited
US2496616A
Cited
AT184709B
Cited
US2764516A
Cited
FR1213564A
Cited
US3497579A
Cited
US3654018A
Cited
US3754066A
Cited
US3793795A
Cited
US4128610A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1985-10-25 | 1986-04-26 | 1986-10-26 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1989-10-25 | 1990-04-26 | 1990-10-26 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1993-10-25 | 1994-04-26 | 1994-10-26 | $7700.00 | Window Closed / Lapsed |