Abstract

Abstract A process and apparatus for the batch-wise filtering of a sludge-like material in which the discharge period of the filter press is used for filling a pressure vessel containing air with a pump being also used during this period. During the filtration period the pump can operate solely for feeding the filter press to thereby increase the filtration capacity and reduce the required filtration period. During the discharge period the pump also operates exclusively for feeding the pressure vessel to further speed up the process. The pump can operate continuously and the different steps of the process can be controlled by only opening and closing control valves.

Inventors

  • 👤 Oswald Busse
  • 👤 Hugo Klesper

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-25 22:12
CPC Classifications
B; B01; B01D; B01D25/00; B01D25/30; B01D25/302

Claims Analysis

Total Claims: 3
Claim 1
Independent Claim 257 words
A process for the batch-wise filtering of a sludge-like material in a filter press having a pump connected to the filter press for feeding the sludge-like material from a sludge-like material source into the filter press for filtration therein, and having a pressure vessel with an air cushion therein with said vessel being connected selectively to the filter press and to the pump and being periodically filled by the pump with sludge-like material under the pressure of said air cushion, with this sludge-material being stored in said vessel and fed into the filter press at the beginning of a filtering batch, each batch comprising the following steps in the sequence named: (a) loading said filter press with at least a portion of said sludge-like material being stored under pressure in said pressure vessel, (b) conveying sludge-like material by said pump from said sludge-like material source into the filter press for filtration therein, with the connection between said filter press and said pressure vessel being closed at least during the final stage of the filtration step, (c) closing the connection between said pump and said filter press and opening the connection between said pump and said pressure vessel while continuously running said pump to convey sludge-like material directly from said source into said pressure vessel, and (d) opening said filter press and discharging filter cake therefrom while continuing to supply sludge-like material to said pressure vessel with the connection between said pump and said filter press closed and the connection between said pump and said pressure vessel open.
Claim 2
Dependent Claim 257 words
A process for the batch-wise filtering of a sludge-like material in a filter press having a pump connected to the filter press for feeding the sludge-like material from a sludge-like material source into the filter press for filtration therein, and having a pressure vessel with an air cushion therein with said vessel being connected selectively to the filter press and to the pump and being periodically filled by the pump with sludge-like material under the pressure of said air cushion, with this sludge-material being stored in said vessel and fed into the filter press at the beginning of a filtering batch, each batch comprising the following steps in the sequence named: (a) loading said filter press with at least a portion of said sludge-like material being stored under pressure in said pressure vessel, (b) conveying sludge-like material by said pump from said sludge-like material source into the filter press for filtration therein, with the connection between said filter press and said pressure vessel being closed at least during the final stage of the filtration step, (c) closing the connection between said pump and said filter press and opening the connection between said pump and said pressure vessel while continuously running said pump to convey sludge-like material directly from said source into said pressure vessel, and (d) opening said filter press and discharging filter cake therefrom while continuing to supply sludge-like material to said pressure vessel with the connection between said pump and said filter press closed and the connection between said pump and said pressure vessel open.
Claim 3
Dependent Claim 38 words
The process as defined in claim 1 in which the continuously running pump is connected alternately with the filter press during said loading and filtration steps and with the pressure vessel during said discharging of said filter cake.

References Cited (Backward Citations)

US459326A Cited
US3502210A Cited
GB1151028A Cited
US3559809A Cited
US3938434A Cited
DE2530550A1 Cited
US4067807A Cited
US4151080A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1985-10-18 1986-04-19 1986-10-19 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1989-10-18 1990-04-19 1990-10-19 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1993-10-18 1994-04-19 1994-10-19 $7700.00 Window Closed / Lapsed