Claims Analysis
Total Claims: 45
Claim 1
Independent Claim
119 words
In a method for in situ determination of permeability in a borehole extending through an underground formation of interest, the steps comprising defining an isolated test interval along the borehole between spaced-apart primary packers, defining additional isolated guard regions respectively at opposite ends of the test interval by means of guard packers respectively spaced-apart from the primary packers, developing a pressure differential between the test interval and the surrounding formation for inducing fluid flow therebetween, and simultaneously and separately monitoring selected flow conditions in the test interval and in the separate guard regions in order to permit determination of multidimensional formation characteristics and possible leakage of fluid past the primary packers in an axial direction relative to the borehole.
Claim 2
Dependent Claim
119 words
In a method for in situ determination of permeability in a borehole extending through an underground formation of interest, the steps comprising defining an isolated test interval along the borehole between spaced-apart primary packers, defining additional isolated guard regions respectively at opposite ends of the test interval by means of guard packers respectively spaced-apart from the primary packers, developing a pressure differential between the test interval and the surrounding formation for inducing fluid flow therebetween, and simultaneously and separately monitoring selected flow conditions in the test interval and in the separate guard regions in order to permit determination of multidimensional formation characteristics and possible leakage of fluid past the primary packers in an axial direction relative to the borehole.
Claim 3
Dependent Claim
74 words
The method of claim 1 wherein selected flow conditions are monitored within the test interval for detecting composite flow between the test interval and the surrounding formation and between the test interval and the separate guard regions, selected flow conditions also being simultaneously and separately monitored within each of the guard regions in order to detect flow between the test interval and the respective guard regions in an axial direction relative to the borehole.
Claim 4
Dependent Claim
47 words
The method of claim 2 wherein the test interval is pressurized above the ambient pressure of the surrounding formation in order to induce fluid flow from the test interval radially outwardly into the surrounding formation in relation to the borehole and axially toward the separate guard regions.
Claim 5
Dependent Claim
55 words
The method of claim 2 wherein pressure is developed within the test interval at a level lower than the ambient pressure of the surrounding formation in order to induce fluid flow from the surrounding formation into the test interval and also to induce vertical fluid flow from the separate guard regions toward the test interval.
Claim 6
Dependent Claim
31 words
The method of claim 1 wherein the pressure differential between the test interval and the surrounding formation is maintained at a substantially constant value while monitoring test interval flow and pressure.
Claim 7
Dependent Claim
24 words
The method of claim 1 wherein pressure changes resulting from flow into or out of the test interval are monitored within the test interval.
Claim 8
Dependent Claim
61 words
The method of claim 1 further comprising the step of introducing a tracer material on a high pressure side of a selected packer and monitoring arrival time of the tracer material on a low pressure side of the selected packer in order to provide an indication of axial flow between the high pressure and low pressure sides of the selected packer.
Claim 9
Dependent Claim
29 words
The method of claim 7 further comprising the step of quantitatively monitoring the rate of accumulation of the tracer material on the low pressure side of the selected packer.
Claim 10
Dependent Claim
29 words
The method of claim 1 wherein the primary packers are arranged within the borehole to define a test interval of predetermined length at a predetermined location in the borehole.
Claim 11
Dependent Claim
17 words
The method of claim 9 wherein both the length and location of the test interval are variable.
Claim 12
Dependent Claim
37 words
The method of claim 1 wherein flow conditions simultaneously and separately monitored in the test interval and in the separate isolated guard regions include one or more of the combination of fluid flow volume, pressure and temperature.
Claim 13
Dependent Claim
50 words
The method of claim 11 wherein a tracer material is introduced on the high pressure side of a selected packer, the flow conditions being monitored on the low pressure side of the selected packer including initial arrival of the tracer material on the low pressure side of the selected packer.
Claim 14
Dependent Claim
28 words
The method of claim 12 wherein the flow conditions monitored on the low pressure side of the selected packer include the rate of accumulation for the tracer material.
Claim 15
Dependent Claim
28 words
The method of claim 1 wherein the test interval is of substantially greater length than the respective guard regions in order to facilitate measurement of axial flow therebetween.
Claim 16
Dependent Claim
42 words
The method of claim 14 wherein the test interval is pressurized above the ambient pressure of the surrounding formation in order to induce fluid flow from the test interval radially outwardly into the surrounding formation and axially toward the separate guard regions.
Claim 17
Dependent Claim
130 words
A guarded straddle packer assembly for in situ determination of permeability in a borehole extending through an underground formation of interest, comprising a pair of spaced-apart primary packers defining an isolated test interval along the borehole, an additional pair of guard packers being respectively spaced apart from the primary packers in order to define additional isolated guard regions separately formed at opposite ends of the test interval, means for developing a pressure differential between the test interval and the surrounding formation for causing fluid flow therebetween, and means for simultaneously and separately monitoring selected flow conditions in the test interval and in the separate guard regions in order to permit determination of multi-directional formation characteristics and possible leakage past the primary packers in an axial direction relative to the borehole.
Claim 18
Dependent Claim
130 words
A guarded straddle packer assembly for in situ determination of permeability in a borehole extending through an underground formation of interest, comprising a pair of spaced-apart primary packers defining an isolated test interval along the borehole, an additional pair of guard packers being respectively spaced apart from the primary packers in order to define additional isolated guard regions separately formed at opposite ends of the test interval, means for developing a pressure differential between the test interval and the surrounding formation for causing fluid flow therebetween, and means for simultaneously and separately monitoring selected flow conditions in the test interval and in the separate guard regions in order to permit determination of multi-directional formation characteristics and possible leakage past the primary packers in an axial direction relative to the borehole.
Claim 19
Dependent Claim
76 words
The guarded straddle packer assembly of claim 16 wherein the monitoring means includes means in communication with the test interval for detecting composite flow between the test interval and the surrounding formation and between the test interval and the separate guard regions, and further comprising means for simultaneously and separately monitoring selected flow conditions within each of the separate guard regions in order to detect axial flow between the test interval and the respective guard regions.
Claim 20
Dependent Claim
50 words
The guarded straddle packer assembly of claim 17 wherein the pressure differential means includes means for pressurizing the test interval above the ambient pressure of the surrounding formation in order to induce fluid flow from the test interval outwardly into the surrounding formation and axially toward the separate guard regions.
Claim 21
Dependent Claim
61 words
The guarded straddle packer assembly of claim 17 wherein the pressure differential means includes means for developing a pressure within the test interval lower than the ambient pressure of the surrounding formation in order to induce fluid flow from the surrounding formation into the test interval while also inducing axial fluid flow from the separate guard regions toward the test interval.
Claim 22
Dependent Claim
24 words
The guarded straddle packer assembly of claim 16 wherein the pressure differential means includes means for monitoring flow and pressure in the test interval.
Claim 23
Dependent Claim
22 words
The guarded straddle packer assembly of claim 16 wherein the pressure differential means includes means for monitoring pressure within the test interval.
Claim 24
Dependent Claim
65 words
The guarded straddle packer assembly of claim 16 further comprising means for introducing a tracer material on a high pressure side of a selected packer and means for monitoring arrival time of the tracer material on a low pressure side of the selected packer in order to provide an indication of axial flow between the high pressure and low pressure sides of the selected packer.
Claim 25
Dependent Claim
51 words
The guarded straddle packer assembly of claim 22 further comprising means for monitoring both initial arrival time of the tracer material on the low pressure side of the selected packer and also for quantitatively monitoring the rate of accumulation of tracer material on the low pressure side of the selected packer.
Claim 26
Dependent Claim
31 words
The guarded straddle packer of claim 16 wherein the primary packers are arranged within the borehole to define a test interval of predetermined length at a predetermined location in the borehole.
Claim 27
Dependent Claim
25 words
The guarded straddle packer assembly of claim 24 wherein the packers are movable relative to each other for adjusting the length of the test interval.
Claim 28
Dependent Claim
42 words
The guarded straddle packer assembly of claim 16 wherein the monitoring means include means for simultaneously and separately monitoring one or more of the combination of fluid flow, pressure and temperature respectively within the test interval and in the separate guard regions.
Claim 29
Dependent Claim
46 words
The guarded straddle packer assembly of claim 26 further comprising means for introducing tracer material on the high pressure side of a selected packer, the monitoring means including means for monitoring initial arrival of the tracer material on the low pressure side of the selected packer.
Claim 30
Dependent Claim
30 words
The guarded straddle packer assembly of claim 27 further comprising monitoring means for measuring the rate of accumulation of tracer material on the low pressure side of the selected packer.
Claim 31
Dependent Claim
37 words
The guarded straddle packer assembly of claim 16 wherein the spacing between the primary packers defining the test interval is substantially greater than the spacing between the respective primary packers and guard packers defining the guard regions.
Claim 32
Dependent Claim
54 words
The guarded straddle packer assembly of claim 29 wherein the pressure differential means includes means for pressurizing the test interval at a pressure above the ambient pressure of the surrounding formation in order to induce fluid flow from the test interval radially outwardly into the surrounding formation and axially toward the separate guard regions.
Claim 33
Dependent Claim
136 words
In a method for in situ determination of formation characteristics in a borehole extending through an underground formation of interest by means of whole hole testing, the steps comprising defining an isolated test interval between the end of the borehole and a primary packer arranged in spaced-apart relation from the end of the borehole, defining an additional isolated guard region adjacent the test interval by means of a guard packer spaced-apart from the primary packer, developing a pressure differential between the test interval and the surrounding formation for inducing fluid flow therebetween, and simultaneously and separately monitoring selected flow conditions in the test interval and in the separate guard region in order to permit determination of multi-dimensional formation characteristics and possible leakage of fluid past the primary packers in an axial direction relative to the borehole.
Claim 34
Dependent Claim
136 words
In a method for in situ determination of formation characteristics in a borehole extending through an underground formation of interest by means of whole hole testing, the steps comprising defining an isolated test interval between the end of the borehole and a primary packer arranged in spaced-apart relation from the end of the borehole, defining an additional isolated guard region adjacent the test interval by means of a guard packer spaced-apart from the primary packer, developing a pressure differential between the test interval and the surrounding formation for inducing fluid flow therebetween, and simultaneously and separately monitoring selected flow conditions in the test interval and in the separate guard region in order to permit determination of multi-dimensional formation characteristics and possible leakage of fluid past the primary packers in an axial direction relative to the borehole.
Claim 35
Dependent Claim
71 words
The method of claim 31 wherein selected flow conditions are monitored within the test interval for detecting composite flow between the test interval and the surrounding formation and between the test interval and the separate guard region, selected flow conditions also being simultaneously and separately monitored within the guard region in order to detect flow between the test interval and the guard region in an axial direction relative to the borehole.
Claim 36
Dependent Claim
61 words
The method of claim 31 further comprising the step of introducing a tracer material on a high pressure side of a selected packer and monitoring arrival time of the tracer material on a low pressure side of the selected packer in order to provide an indication of axial flow between the high pressure and low pressure sides of the selected packer.
Claim 37
Dependent Claim
29 words
The method of claim 33 further comprising the step of quantitatively monitoring the rate of accumulation of the tracer material on the low pressure side of the selected packer.
Claim 38
Dependent Claim
36 words
The method of claim 31 wherein flow conditions simultaneously and separately monitored in the test interval and in the separate guard region include one or more of the combination of fluid flow volume, pressure and temperature.
Claim 39
Dependent Claim
50 words
The method of claim 35 wherein a tracer material is introduced on the high pressure side of a selected packer, the flow conditions being monitored on the low pressure side of the selected packer including initial arrival of the tracer material on the low pressure side of the selected packer.
Claim 40
Dependent Claim
29 words
The method of claim 36 wherein the flow conditions monitored on the low pressure side of the selected packer further include the rate of accumulation for the tracer material.
Claim 41
Dependent Claim
134 words
A guarded straddle packer assembly adapted for in situ whole hole testing and determination of permeability in a borehole extending through an underground formation of interest, comprising a primary packer being spaced apart from the end of the borehole for defining an isolated test interval therebetween, an additional guard packer being spaced apart from the primary packer in order to define an isolated guard region separately formed adjacent the test interval, means for developing a pressure differential between the test interval and the surrounding formation for causing fluid flow therebetween, and means for simultaneously and separately monitoring selected flow conditions in the test interval and in the separate guard region in order to permit determination of multi-dimensional formation characteristics and possible leakage past the primary packer in an axial direction relative to the borehole.
Claim 42
Dependent Claim
134 words
A guarded straddle packer assembly adapted for in situ whole hole testing and determination of permeability in a borehole extending through an underground formation of interest, comprising a primary packer being spaced apart from the end of the borehole for defining an isolated test interval therebetween, an additional guard packer being spaced apart from the primary packer in order to define an isolated guard region separately formed adjacent the test interval, means for developing a pressure differential between the test interval and the surrounding formation for causing fluid flow therebetween, and means for simultaneously and separately monitoring selected flow conditions in the test interval and in the separate guard region in order to permit determination of multi-dimensional formation characteristics and possible leakage past the primary packer in an axial direction relative to the borehole.
Claim 43
Dependent Claim
73 words
The guarded straddle packer assembly of claim 38 wherein the monitoring means includes means in communication with the test interval for detecting composite flow between the test interval and the surrounding formation and between the test interval and the separate region, and further comprising means for simultaneously and separately monitoring selected flow conditions within the separate guard region in order to detect axial flow between the test interval and the respective guard region.
Claim 44
Dependent Claim
65 words
The guarded straddle packer assembly of claim 38 further comprising means for introducing a tracer material on a high pressure side of a selected packer and means for monitoring arrival time of the tracer material on a low pressure side of the selected packer in order to provide an indication of axial flow between the high pressure and low pressure sides of the selected packer.
Claim 45
Dependent Claim
30 words
The guarded straddle packer assembly of claim 40 further comprising means for quantitatively monitoring the rate of accumulation of tracer material on the low pressure side of the selected packer.