US4337151A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method and apparatus for pulsed timed control for sludge return line
Assignee: RED FOX ENVIRONMENTAL SERVICES Inc A CORP OF TX
•
Filing: 1980-12-29
•
Granted: 1982-06-29
•
Expires: 2000-12-29
Abstract
Abstract The present disclosure is directed to a method and apparatus for reducing eddy currents in a clarifier to restrict sludge from entering the clear water zone of the clarifier by periodically pulsing air to the sludge return line from the bottom of the clarifier to the top of the aeration chamber in a sewage treatment plant of both the land base and marine type.
Inventors
- 👤 Gary A. Crosby
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-08 20:47
CPC Classifications
C; C02; C02F; C02F3/00; C02F3/02; C02F3/12; C02F3/22; C02F3/223; C02F3/006; Y; Y02; Y02W; Y02W10/00; Y02W10/10
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
142 words
In a sewage treatment apparatus, an aeration chamber, a clarification chamber having a clear water zone, a sludge return line extending from the bottom of said clarification chamber to the top of said aeration chamber, an air service line supplying air from a blower to a lower portion of said sludge return line, apparatus for periodically pulsing air to said sludge return line comprising a solenoid controlled valve in said air service line to said sludge return line, timing means for periodically pulsing the air to said sludge return line so that eddy currents in the clarification chamber are reduced to retard flow of sludge into the clear water zone of the clarifier, and a metering valve downstream of said solenoid controlled valve to regulate the quantity of air supplied to said sludge return line when said solenoid controlled valve is opened.
Claim 2
Dependent Claim
142 words
In a sewage treatment apparatus, an aeration chamber, a clarification chamber having a clear water zone, a sludge return line extending from the bottom of said clarification chamber to the top of said aeration chamber, an air service line supplying air from a blower to a lower portion of said sludge return line, apparatus for periodically pulsing air to said sludge return line comprising a solenoid controlled valve in said air service line to said sludge return line, timing means for periodically pulsing the air to said sludge return line so that eddy currents in the clarification chamber are reduced to retard flow of sludge into the clear water zone of the clarifier, and a metering valve downstream of said solenoid controlled valve to regulate the quantity of air supplied to said sludge return line when said solenoid controlled valve is opened.
References Cited (Backward Citations)
US2901114A
Cited
US3355019A
Cited
US3342727A
Cited
US3382981A
Cited
US3487937A
Cited
US3522881A
Cited
US3722836A
Cited
US3721344A
Cited
US3807563A
Cited
US3767051A
Cited
US3884815A
Cited
US3992299A
Cited
US4036754A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1985-06-28 | 1985-12-28 | 1986-06-29 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1989-06-28 | 1989-12-28 | 1990-06-29 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1993-06-28 | 1993-12-28 | 1994-06-29 | $7700.00 | Window Closed / Lapsed |