← Back to Patent Explorer
US4336424A Expired / Lapsed US ⏱️ 0.0 years remaining

Circuit arrangement for monitoring operating conditions of direct current devices

Assignee: Siemens AG
•
Filing: 1980-09-08
•
Granted: 1982-06-22
•
Expires: 2000-09-08
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract The circuit arrangement monitors operating conditions of a group of direct current devices. The operating conditions are represented by different potentials occurring at a sampling connector of each direct current device. A first and a second selector unit, each having parallel signal inputs, are arranged symmetrically with respect to commonly connected outputs. Signal inputs of the first selector are connected to corresponding sampling connectors of the DC devices. A control unit for generating a control signal train has an output which is commonly connected to control inputs of both selector units. Commonly grounded filter capacitors are connected to the signal inputs of the second selector unit. A comparator is connected by a first input to a reference voltage source and by a second input to the outputs of both selector units. At the output of the comparator there is delivered a rated output signal evaluating the potential at the presently selected sampling connector with respect to said reference voltage.

Inventors

  • 👤 Robert Lechner

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-02 23:42
CPC Classifications
H; H04; H04Q; H04Q3/00; H04M; H04M3/00; H04M3/22; H04M3/2272

Claims Analysis

Total Claims: 7
Claim 1
Independent Claim 227 words
A circuit arrangement for monitoring operating conditions of a group of direct current devices, said operating conditions represented by different potentials occurring at a sampling connector of each direct current device, said circuit arrangement comprising: (a) a first and a second selector unit, each having parallel signal inputs, an output and a control input for receiving a control signal causing step-by-step action of the respective selector unit, the outputs of said selector units being connected, and each of said signal inputs of said first selector being connected to a respective sampling connector of one of said direct current devices; (b) means for generating a control signal train and having an output commonly connected to said control inputs of both selector units; (c) a plurality of filter capacitors arranged in parallel with respect to each other and being commonly connected to ground, each of said capacitors being connected to a respective one of said signal inputs of the second selector unit; (d) a voltage source for generating a reference voltage with respect to said potentials at said sampling connectors; and (e) a comparator having a first input connected to said reference voltage source, a second input connected to said outputs of said selector units and an output for delivering a binary output signal evaluating the potential at the presently selected sampling connector with respect to said reference voltage.
Claim 2
Dependent Claim 227 words
A circuit arrangement for monitoring operating conditions of a group of direct current devices, said operating conditions represented by different potentials occurring at a sampling connector of each direct current device, said circuit arrangement comprising: (a) a first and a second selector unit, each having parallel signal inputs, an output and a control input for receiving a control signal causing step-by-step action of the respective selector unit, the outputs of said selector units being connected, and each of said signal inputs of said first selector being connected to a respective sampling connector of one of said direct current devices; (b) means for generating a control signal train and having an output commonly connected to said control inputs of both selector units; (c) a plurality of filter capacitors arranged in parallel with respect to each other and being commonly connected to ground, each of said capacitors being connected to a respective one of said signal inputs of the second selector unit; (d) a voltage source for generating a reference voltage with respect to said potentials at said sampling connectors; and (e) a comparator having a first input connected to said reference voltage source, a second input connected to said outputs of said selector units and an output for delivering a binary output signal evaluating the potential at the presently selected sampling connector with respect to said reference voltage.
Claim 3
Dependent Claim 98 words
The circuit arrangement as recited in claim 1, wherein: (a1) said second selector unit has a second control input for receiving a strobe signal enabling a timely limited through-connection from a presently selected signal input to said output of said selector unit during the active state of said strobe signal; and (b1) said means for generating a control signal train is also operative to generate a strobe signal train which is identical to said control signal train except for a shorter pulse duration and has a further output connected to said second control input of said selector unit.
Claim 4
Dependent Claim 20 words
The circuit arrangement as recited in claim 1, further comprising a resistor inserted between the outputs of the selector units.
Claim 5
Dependent Claim 48 words
The circuit arrangement as recited in claim 1, comprising a plurality of pairs of first and second selector units, said pairs being arranged in parallel with respect to the commonly connected outputs and being consecutively selected for monitoring operations by said means for generating a control signal train.
Claim 6
Dependent Claim 34 words
The circuit arrangement as recited in claim 1, wherein the first selector unit, the second selector unit, the filter capacitors, the common output resistor and the comparator are commonly assembled into one integrated circuit.
Claim 7
Dependent Claim 31 words
The circuit arrangement as recited in claim 1, wherein the direct current devices comprise subscriber line loops composed of a subscriber station, a subscriber line and a subscriber line interface circuit.

References Cited (Backward Citations)

US2238223A Cited
US2755340A Cited
DE2009686A1 Cited
GB1481750A Cited
DE2542615A1 Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1985-06-21 1985-12-21 1986-06-22 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1989-06-21 1989-12-21 1990-06-22 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1993-06-21 1993-12-21 1994-06-22 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag