Claims Analysis
Total Claims: 9
Claim 1
Independent Claim
264 words
A method for resurfacing an old blacktop road surface by means of first, second, and third separate, mobile units performing a respective first, second, and third group of steps, wherein said first group performed by said first, separate mobile unit comprises the steps of: (a) providing, by means of a single heater, a single heat application to the old road surface for heating and plastifying the old road surface to a given depth (17), (b) breaking up only a top portion (18) of the heated old road surface to produce a broken-up material layer having a thickness substantially less than said given depth (17) of heated old road surface, (c) rearranging and distributing the broken-up material on the remaining still heated but otherwise undisturbed old road surface to produce a first profiled layer (19) of broken-up material, wherein said second separate mobile unit performs the steps of: (d) supplying fresh asphalt material into the third, separate mobile unit, and wherein said third group performed by said third, separate mobile unit comprises the steps of: (e) distributing fresh asphalt material on top of said profiled, broken-up layer (19) over the entire working width of the third unit while said road surface and the layer (19) of broken-up material are still sufficiently plastified from said single heat application, and (f) immediately profiling and compacting said fresh asphalt material as a top layer (25) together with said broken-up material layer (19) whereby the still heated but otherwise undisturbed old road surface enters into an intimate bond with the layers (19) and (25) in a single heat application.
Claim 2
Independent Claim
264 words
A method for resurfacing an old blacktop road surface by means of first, second, and third separate, mobile units performing a respective first, second, and third group of steps, wherein said first group performed by said first, separate mobile unit comprises the steps of: (a) providing, by means of a single heater, a single heat application to the old road surface for heating and plastifying the old road surface to a given depth (17), (b) breaking up only a top portion (18) of the heated old road surface to produce a broken-up material layer having a thickness substantially less than said given depth (17) of heated old road surface, (c) rearranging and distributing the broken-up material on the remaining still heated but otherwise undisturbed old road surface to produce a first profiled layer (19) of broken-up material, wherein said second separate mobile unit performs the steps of: (d) supplying fresh asphalt material into the third, separate mobile unit, and wherein said third group performed by said third, separate mobile unit comprises the steps of: (e) distributing fresh asphalt material on top of said profiled, broken-up layer (19) over the entire working width of the third unit while said road surface and the layer (19) of broken-up material are still sufficiently plastified from said single heat application, and (f) immediately profiling and compacting said fresh asphalt material as a top layer (25) together with said broken-up material layer (19) whereby the still heated but otherwise undisturbed old road surface enters into an intimate bond with the layers (19) and (25) in a single heat application.
Claim 3
Dependent Claim
45 words
The method of claim 1, wherein said step (c) of rearranging and distributing said broken-up material on said still hot but otherwise undisturbed old road surface is performed directly following said step (b), whereby said broken-up material is not picked up from said road surface.
Claim 4
Dependent Claim
78 words
The method of claim 1, wherein said step (b) of breaking up comprises drawing rows of tearing-up teeth along said road surface to a thickness (18) which is substantially less than said given depth (17), whereby the plastified road surface material is broken up and partially rearranged on said road surface by said tearing-up teeth, and further rearranging and distributing said broken-up material so that broken-up portions of material will take up different positions on the road surface.
Claim 5
Dependent Claim
26 words
The method of claim 1, further comprising profiling said broken-up layer (19) on said still hot road surface prior to distributing said fresh asphalt material thereon.
Claim 6
Dependent Claim
52 words
The method of claim 1, wherein said step of rearranging and distributing said broken-up material comprises rotating a pair of worms through said broken-up material following the breaking-up thereof, said worms being staggered laterally with respect to said road surface and each having a length of substantially one half the working width.
Claim 7
Dependent Claim
31 words
The method of claim 1, wherein said step of rearranging and distributing said broken-up material comprises moving a distributor continuously back and forth over the working width of said road surface.
Claim 8
Dependent Claim
25 words
The method of claim 1, further comprising drawing a screeding bar along said broken-up layer prior to the application of said fresh asphalt material thereto.
Claim 9
Dependent Claim
25 words
The method of claim 1, further comprising scratching said broken-up layer with means (26) on said third unit prior to distributing said fresh asphalt material.