Shear load resistant structure

Assignee: VERCO Manufacturing Inc
•
Filing: 1979-10-19
•
Granted: 1982-06-22
•
Expires: 1999-10-19
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract The bottom flutes of a fluted deck or diaphragm of a building are fixedly attached to a horizontal load bearing member supported by vertical load resisting members. A load translation member precludes relative movement between the top flutes en masse and the bottom flutes en masse. By precluding relative movement of the top and bottom flutes, the shear loads imposed upon the diaphragm by earthquakes and/or high winds are translated throught the load translation member and the load bearing member to the vertical load resisting members.

Inventors

  • 👤 Virgil R. Morton

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-26 09:06
CPC Classifications
E; E04; E04B; E04B1/00; E04B1/16; E04B1/164; E04B1/18; E04B1/24; E04B1/62; E04B1/92; E04B1/98; E04B5/00; E04B5/16; E04B5/32; E04B5/36; E04B5/38; E04B5/40; E04B2001/2484

Claims Analysis

Total Claims: 8
Claim 1
Independent Claim 177 words
A method for constructing earthquake resistant buildings having vertical load resisting members supporting horizontal load bearing members, said method comprising the steps of: (a) attaching a fluted deck having webs alternatively interconnecting top and bottom flutes to a horizontal load bearing member, said attaching step including the step of attaching selected ones of the bottom flutes of the fluted deck to the horizontal load bearing member; (b) locating a load translation means in mating relationship with selected pairs of adjacent webs and the interconnecting top flute of the fluted deck and attaching at least one of the mating webs and top flute with the load translation means; and (c) attaching the load translation means to the horizontal load bearing member; whereby the load translation means inhibits relative movement between the top and bottom flutes and buckling of the webs of the fluted deck due to horizontal shear loads imposed upon the deck and the load translation member translates the horizontal shear loads imposed upon the deck through the load bearing member to the vertical load resisting members.
Claim 2
Independent Claim 177 words
A method for constructing earthquake resistant buildings having vertical load resisting members supporting horizontal load bearing members, said method comprising the steps of: (a) attaching a fluted deck having webs alternatively interconnecting top and bottom flutes to a horizontal load bearing member, said attaching step including the step of attaching selected ones of the bottom flutes of the fluted deck to the horizontal load bearing member; (b) locating a load translation means in mating relationship with selected pairs of adjacent webs and the interconnecting top flute of the fluted deck and attaching at least one of the mating webs and top flute with the load translation means; and (c) attaching the load translation means to the horizontal load bearing member; whereby the load translation means inhibits relative movement between the top and bottom flutes and buckling of the webs of the fluted deck due to horizontal shear loads imposed upon the deck and the load translation member translates the horizontal shear loads imposed upon the deck through the load bearing member to the vertical load resisting members.
Claim 3
Dependent Claim 26 words
The method as set forth in claim 1 wherein said steps of attaching the bottom flutes and attaching the load translation means comprise a single step.
Claim 4
Dependent Claim 19 words
The method as set forth in claim 2 wherein each of said attaching steps comprises a step of welding.
Claim 5
Independent Claim 162 words
A method for constructing earthquake resistant buildings having vertical load resisting members supporting horizontal load bearing members, said method comprising the steps of: (a) attaching a fluted deck having webs alternately interconnecting top and bottom flutes to a horizontal load bearing member, said attaching step including the step of attaching selected ones of the bottom flutes to the horizontal load bearing member; (b) attaching a load translation means to selected ones of the top flutes which load translation means has a longitudinal axis extending transverse to the flutes of the fluted deck; and (c) attaching the load translation means to the horizontal load bearing member; whereby, the load translation means inhibits relative movement between the top and bottom flutes and buckling of the webs of the fluted deck due to horizontal shear loads imposed upon the deck and the load translation member translates the horizontal shear loads imposed upon the deck through the load bearing member to the vertical load resisting members.
Claim 6
Independent Claim 162 words
A method for constructing earthquake resistant buildings having vertical load resisting members supporting horizontal load bearing members, said method comprising the steps of: (a) attaching a fluted deck having webs alternately interconnecting top and bottom flutes to a horizontal load bearing member, said attaching step including the step of attaching selected ones of the bottom flutes to the horizontal load bearing member; (b) attaching a load translation means to selected ones of the top flutes which load translation means has a longitudinal axis extending transverse to the flutes of the fluted deck; and (c) attaching the load translation means to the horizontal load bearing member; whereby, the load translation means inhibits relative movement between the top and bottom flutes and buckling of the webs of the fluted deck due to horizontal shear loads imposed upon the deck and the load translation member translates the horizontal shear loads imposed upon the deck through the load bearing member to the vertical load resisting members.
Claim 7
Dependent Claim 26 words
The method as set forth in claim 4 wherein said steps of attaching the bottom flutes and attaching the load translation means comprise a single step.
Claim 8
Dependent Claim 19 words
The method as set forth in claim 1 wherein each of said attaching steps comprises a step of welding.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1985-06-21 1985-12-21 1986-06-22 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1989-06-21 1989-12-21 1990-06-22 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1993-06-21 1993-12-21 1994-06-22 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag