US4310058A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Well drilling method
Assignee: Halliburton Co
•
Filing: 1980-04-28
•
Granted: 1982-01-12
•
Expires: 2000-04-28
Abstract
Abstract A method of removing fluids entering into a well bore from a well formation while the well is being drilled, such as gas, in which the gas bubble is chopped into small bubbles by mixing the gas with drilling mud and pumping the mixed gas and drilling mud upwardly through the drill string-bore hole annulus and removing it from the well.
Inventors
- 👤 Adam T. Bourgoyne, Jr.
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-06 02:41
CPC Classifications
E; E21; E21B; E21B21/00; E21B21/08; E21B21/10; E21B21/12; E21B34/00; E21B34/06; E21B34/14
Claims Analysis
Total Claims: 11
Claim 1
Independent Claim
105 words
Method of drilling a well comprising, drilling a well with a drill string while circulating drilling mud, determining that formation fluids have entered the well bore from a well formation, determining the surface back pressure on said well bore which will prevent flow of formation fluids into the well bore, injecting drilling mud into said formation fluid at a point above the lower end of the drill string, and maintaining the well bore under a back pressure sufficient to prevent further flow of formation fluids into the well bore while flowing the mixture of formation fluid and drilling mud up the well bore-drill string annulus.
Claim 2
Dependent Claim
105 words
Method of drilling a well comprising, drilling a well with a drill string while circulating drilling mud, determining that formation fluids have entered the well bore from a well formation, determining the surface back pressure on said well bore which will prevent flow of formation fluids into the well bore, injecting drilling mud into said formation fluid at a point above the lower end of the drill string, and maintaining the well bore under a back pressure sufficient to prevent further flow of formation fluids into the well bore while flowing the mixture of formation fluid and drilling mud up the well bore-drill string annulus.
Claim 3
Dependent Claim
33 words
The method of claim 1 wherein pressure at the bottom of the well is constantly monitored and the drilling mud is circulated through a port spaced above the bottom of the well bore.
Claim 4
Dependent Claim
113 words
Method of drilling a well comprising, drilling a well with a drill string while circulating drilling mud, determining that formation fluids have entered the well from a well formation, determining the surface back pressure on said well bore which will prevent flow of formation fluids into the well bore, simultaneously injecting drilling mud into said formation fluid at a point above the lower end of the drill string and into the bottom of the well bore, and maintaining the well bore under a back pressure sufficient to prevent further flow of formation fluids into the well bore while flowing the mixture of formation fluid and drilling mud up the well bore-drill string annulus.
Claim 5
Dependent Claim
113 words
Method of drilling a well comprising, drilling a well with a drill string while circulating drilling mud, determining that formation fluids have entered the well from a well formation, determining the surface back pressure on said well bore which will prevent flow of formation fluids into the well bore, simultaneously injecting drilling mud into said formation fluid at a point above the lower end of the drill string and into the bottom of the well bore, and maintaining the well bore under a back pressure sufficient to prevent further flow of formation fluids into the well bore while flowing the mixture of formation fluid and drilling mud up the well bore-drill string annulus.
Claim 6
Dependent Claim
108 words
Method of drilling a well comprising, drilling a well with a drill string while circulating drilling mud, determining that formation fluids have entered the well from a well formation, determining the surface back pressure on said well bore which will prevent flow of formation fluids into the well bore, opening a port in the drill string above the drill collars and injecting drilling mud through said port into said formation fluid, and maintaining the well bore under a back pressure sufficient to prevent further flow of formation fluids into the well bore while flowing the mixture of formation fluid and drilling mud up the well bore-drill string annulus.
Claim 7
Dependent Claim
108 words
Method of drilling a well comprising, drilling a well with a drill string while circulating drilling mud, determining that formation fluids have entered the well from a well formation, determining the surface back pressure on said well bore which will prevent flow of formation fluids into the well bore, opening a port in the drill string above the drill collars and injecting drilling mud through said port into said formation fluid, and maintaining the well bore under a back pressure sufficient to prevent further flow of formation fluids into the well bore while flowing the mixture of formation fluid and drilling mud up the well bore-drill string annulus.
Claim 8
Dependent Claim
120 words
Method of drilling a well comprising, drilling a well with a drill string while circulating drilling mud, determining that formation fluids have entered the well from a well formation, determining the surface back pressure on said well bore which will prevent flow of formation fluids into the well bore, opening a port in the drill string above the drill collars and injecting drilling mud through said port into said formation fluid and through the bottom of the drill string into the well bore, and maintaining the well bore under a back pressure sufficient to prevent further flow of formation fluids into the well bore while flowing the mixture of formation fluid and drilling mud up the well bore-drill string annulus.
Claim 9
Dependent Claim
120 words
Method of drilling a well comprising, drilling a well with a drill string while circulating drilling mud, determining that formation fluids have entered the well from a well formation, determining the surface back pressure on said well bore which will prevent flow of formation fluids into the well bore, opening a port in the drill string above the drill collars and injecting drilling mud through said port into said formation fluid and through the bottom of the drill string into the well bore, and maintaining the well bore under a back pressure sufficient to prevent further flow of formation fluids into the well bore while flowing the mixture of formation fluid and drilling mud up the well bore-drill string annulus.
Claim 10
Independent Claim
30 words
The method of claims 1, 3, 4 or 5 wherein the well is a subsea well and the drilling mud is injected into the formation fluids at the subsea wellhead.
Claim 11
Independent Claim
26 words
The method of claims 3 or 5 in which the rate of flow of drilling mud at the bottom of the drill string is maintained constant.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1985-01-11 | 1985-07-13 | 1986-01-12 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1989-01-11 | 1989-07-13 | 1990-01-12 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1993-01-11 | 1993-07-13 | 1994-01-12 | $7700.00 | Window Closed / Lapsed |